Overview

Liddell Battery Energy Storage System Project

Project Overview:

Fluence Energy have been engaged formally by AGL Liddell BESS Pty Ltd to execute a design, engineer, manufacture, procure, supply, construct, deliver, install, commission and test the Facility.

The Facility will include a 500 MW/1000 MWh battery energy storage

System (BESS)

The strategy is for Fluence & balance of plant contractor to take the Project through full EPC execution.

As part of the early design phase , Fluence is looking to get some high-level budget pricing on key selected packages to understand the Order of Magnitude cost. A formal inqury for these packages will be followed in due course once the engineering design is progressed to sufficient detail.

Project Background

The Project objective is to develop a Battery Energy Storage System (BESS) with a capacity of approximately 500 megawatts (MW) and 1,000 megawatt-hour (MWh) (Facility), designed as two independent generating systems of 250 megawatts (MW) and 500 megawatt-hour (MWh) each, which join together on the 330kV transmission before the Point of Connection (PoC). The Project would provide a range of network services to augment the reliability of energy supply, provide storage and firming capacity to the National Energy Market (NEM) as well as additional services to assist grid stability including frequency control ancillary services.

It will involve the construction and operation of the BESS as well as an associated 330kV overhead powerline (OHL). The BESS is located to the south of the existing Liddell Power Station. The OHL extends from the BESS to the existing grid connection at the Liddell Switchyard (west of the Liddell Power Station).

Fluence will entertain any local interest for the Liddell BESS project.

More information about this project you may find here

How to register an Expression of Interest (EOI)

- Work packages currently available to submit an EOI for are listed in the 'Work Packages' tab above. Refer to the 'EOI User Guide' below for instructions and assistance to submit an EOI.

- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.

ICN Gateway Company Registration

- Click here to register your company profile on ICN Gateway.

- Support and assistance are available through the document 'Creating an ICN Gateway Company Profile' below.

- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

9
Total Work Packages
9
Other Work Packages
9
Total Work Packages
Show me
expand_more
star_outlined
WORK PACKAGE
FULL SCOPE EOI
PARTIAL SCOPE EOI
STATUS
01. Civil Work
Status
Closed
Full scope EOI closes on
30 Sep 2024

Water Cart Hire

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
30 Sep 2024

Maintaining existing fields and lawn within the facility of the BESS

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
30 Sep 2024

Supply and installation of fencing around the BESS facility during construction and final construction works

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

02. Electrical Works
Status
Closed
Full scope EOI closes on
30 Sep 2024

Qualified Electricians
Skilled resources required initially 6 and ramped up to potentially 20

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
30 Sep 2024

Local qualified Protection & Commissioning engineers available to assist during the Commissioning works

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

03. Mechanical Works
Status
Closed
Full scope EOI closes on
30 Sep 2024

Require crane hire for lifting and craneage works - looing for any local suppliers that would be interested

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

04. Finishing Work
Status
Closed
Full scope EOI closes on
30 Sep 2024

Final implementation of landscaping works

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
30 Sep 2024

Local interested companies that can provide support to manufacture all signs for the BESS facility

Note: You can fill out an Expression of Interest form exclusively on a computer or laptop device.

Status
Closed
Full scope EOI closes on
30 Sep 2024

Local interested companies that can provide support to manufacture and supply Lighting and CCTV equipment