Project Results (256)
The Australian Defence Export Office (ADEO) was established in April 2018 as a key initiative of the 2018 Defence Export Strategy. The ADEO is the focal point for coordinating whole-of-government defence export support for Australian defence industry, to ensure it can meet Australia’s defence capability needs now and into the future.
BlueScope Steel (BSL) Port Kembla are planning a reline and upgrade project for their Number 6 Blast Furnace. The works include refurbishing existing equipment, replacing existing equipment and some new equipment/operating systems.
FRV Services Australia (FRV) have approval for the construction, operation, and decommissioning of a 300 megawatt (MW) photovoltaic (PV) solar farm (SSD-9874). The Project is located on rural land approximately 4.3 kilometres north-east of Walla Walla, southern NSW. Gransolar Construction Australia Pty Ltd (GRS) have been engaged by FRV to design & construct the Project.
Workpackages Results (5292)
Generator Pre-Assesmbly
(New)
(New)