Horsham Solar Farm


Project at a glance


VIC Australia
Development
OX2 HOLDINGS AUSTRALIA PTY LTD

Contact Details


Lisa Maro
Renewable Energy Industry Adviser
+61 3 9864 6720

About OX2

Leading Swedish renewable developer OX2 has acquired ESCO Pacific. OX2 sees great potential in the Australian market for renewables and sees opportunities to expand the operations of ESCO Pacific. OX2 also plans to scale up operations through acquisitions in solar and energy storage and has the ambition to expand operations to onshore wind while exploring offshore wind and hydrogen. The ESCO Pacific name and logo will now be replaced with OX2. To view the relevant media release, please visit: https://www.ox2.com/australia/news


About the Project

OX2's Horsham Solar Farm is situated on 196 hectares of grazing and cropping lands, approximately 5 km east of Horsham in Victoria. The project will export a maximum of 118.8MWac power to the grid and comprise approximately 230,000 solar photovoltaic (PV) modules, installed on ground-mounted single axis horizontal tracking structures. Direct Current (DC) electricity generated by various groups of PV modules is combined and fed into solar inverters which invert DC electricity into Alternating Current (AC) electricity. This electricity will then fed into a 33kV reticulation system before being centrally dispatched to the electricity network via a newly built transformer substation connecting solar farm directly to the 220kV bus at existing Horsham Terminal Substation owned by the Ausnet.


The solar farm consists of the following major equipment:

  • 220/33kV Main Transformer Substation
  • 220kV underground cable between Solar Farm and Horsham Terminal Station
  • Collection Station consisting of 33kV switchgear, Protection, metering, control and communication equipment
  • AC and DC auxiliary power supply system, all mounted inside a prefabricated building
  • PV modules
  • Trackers
  • Piles
  • Combiner Boxes
  • Power Conversion Units (PCUs) consisting of inverters, transformers and Ring Main Units, all mounted on a metal skid
  • SCADA system
  • Security System
  • Meteorological Stations
  • Operation & Maintenance buildings
  • Perimeter fencing with CCTV cameras


All of the above equipment are connected together by AC, DC, Fibre Optic and other communication cables. These equipment and cables are installed by appropriately qualified civil, mechanical and electrical contractors.


Generally, OX2 will engage an experienced EPC contractor who will design and construct the entire solar farm on turnkey basis. While selection process for such an EPC contractor has already started, OX2 is working closely with ICN to identify local suppliers and contractors who are capable of supplying product and services to the main EPC contractor as a subcontractor during the engineering, procurement, construction, operation and maintenance phases of the Horsham Solar Farm.


Project Timing

The project is expected to go into construction during the second quarter of 2024.


HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)

  • To submit an EOI, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
  • This is an initial, generic EOI submission only. All companies who submit an EOI will be included in information presented to companies who are short listed to bid for this Project.
  • The services, programmes and initiatives provided by ICN Victoria are aimed at complementing a company's existing Sales, Marketing and Business Development strategy and any EOI submitted should not be considered as an alternative to these activities.

ICN GATEWAY COMPANY REGISTRATION

  • Click here to register your company profile on ICN Gateway.
  • Support and assistance are available through the web links listed below.
  • An ICN Gateway company profile that accurately and effectively summarises your company is critical to using the services of the ICN Group - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
  • Companies should ensure that the email notification functionality within their ICN Gateway company profile is activated to include an appropriate level of coverage to Information & Updates, Major Projects and Regional Opportunities.

(1) ICN Gateway Setup Wizard
(2) ICN Gateway User Guide



Share this project on:

FB Twitter LinkedIn

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status
Accordian collapse

General

AccordianPlus Any Opportunities

Full Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)

Partial Scope EOI

  Open
AccordianPlus Civil Works

Full Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)

Partial Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)
  Open
AccordianPlus Electrical Works

Full Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)

Partial Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)
  Open
AccordianPlus Labour Hire

Full Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)

Partial Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)
  Open
AccordianPlus Landscaping

Full Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)

Partial Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)
  Open
AccordianPlus Logistics

Full Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)

Partial Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)
  Open
AccordianPlus Mechanical Works

Full Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)

Partial Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)
  Open

Full Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)

Partial Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)
  Open

Full Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)

Partial Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)
  Open

Full Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)

Partial Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)
  Open
AccordianPlus Services

Full Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)

Partial Scope EOI

Create EOI
Closes: 
31 May 2024 (AEST)
  Open
Note: The closing date/s for expressions of interest are subject to change.