Walla Walla Solar Farm


Project at a glance


NSW Australia (Onshore)
Tender/Bid Phase
GRANSOLAR CONSTRUCTION AUSTRALIA PTY LTD

Contact Details


Geoff Reardon
Regional Manager - Murray/Riverina NSW
+61 402 632 027

The Project site is within the Greater Hume Shire local government area (LGA) in the south-east Riverina region in NSW. Walla Walla is the closest town to the Project site and provides social and community infrastructure for residents within the region. Culcairn, the other main town in proximity to the Project site.


The solar farm will have a 300-megawatt (MWac) capacity of clean, renewable energy - enough to power approx. 90,000 NSW homes. The solar farm will be connected to the electricity network via the existing transmission line that runs parallel to Schneiders Road.


The scope of works consists of, but is not limited to:


Installation of approximately 700,000 single axis tracker PV solar panels, mounted on steel frames at about 4.85 metres (m) above ground level at maximum tilt

96 inverter containers

Electrical transmission infrastructure and overhead transmission line to connect the solar farm to the existing 330 kV transmission line

Switch room facility

Electrical conduits and transformers

Harmonic filter

Underground cables

Operation and maintenance building

Internal roads and access points

Parking areas

Security fencing

CCTV system

SCADA/Monitoring system

Weather stations

Vegetation screening


The construction phase of Walla Walla Solar Farm is anticipated to last approximately 16 to 20 months from the commencement of site establishment work expected in Q4 2022. The Project is currently in its early stages where design process is being established.


ICN Gateway company profile


Your ICN Gateway company profile and any registrations of interest you submit are used to assess your organisation's ability to complete projects.


Clickhereto create a new company profile or to login to your existing company profile.


Please ensure your business invests the time and energy required to represent itself in the most effective manner possible when completing and/or updating your company profile.



Share this project on:

FB Twitter LinkedIn

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status

Full Scope EOI

Create EOI
Closes: 
30 Apr 2024 (AEST)

Partial Scope EOI

  Open
AccordianPlus Waste disposal

Full Scope EOI

Create EOI
Closes: 
31 Jul 2024 (AEST)

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
30 Sep 2024 (AEST)

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
18 Dec 2024 (AEST)

Partial Scope EOI

  Open
AccordianPlus Security control

Full Scope EOI

Create EOI
Closes: 
23 Dec 2024 (AEST)

Partial Scope EOI

  Open
AccordianPlus Sewerage Pump Out

Full Scope EOI

Create EOI
Closes: 
23 Dec 2024 (AEST)

Partial Scope EOI

  Open
AccordianPlus Water Supply

Full Scope EOI

Create EOI
Closes: 
23 Dec 2024 (AEST)

Partial Scope EOI

  Open
AccordianPlus Temporary Facilities

Full Scope EOI

Create EOI
Closes: 
31 Dec 2024 (AEST)

Partial Scope EOI

  Open
AccordianPlus CCTV security

Full Scope EOI

Closed: 
31 Jan 2024 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Electrical Supplies

Full Scope EOI

Closed: 
31 Mar 2024 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Electrical Trenches

Full Scope EOI

Closed: 
31 Jan 2024 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
30 Mar 2024 (AEST)

Partial Scope EOI

  Closed
Note: The closing date/s for expressions of interest are subject to change.