Dame Phyllis Frost Centre 106 Bed & Supporting Infrastructure Expansion


Project at a glance


VIC Australia
Under Construction
WATPAC CONSTRUCTION (VIC) PTY LTD
A$96M

Contact Details


Peter McCracken
Regional Manager Barwon Region
+61 407 505 477

The Dame Phyllis Frost Centre (DPFC) provides maximum and medium security specialist accommodation for remanded and sentenced women prisoners. As one of Victoria’s two women-only prisons, it plays a critical role in Victoria’s corrections system.


The current accommodation facilities include cellular accommodation units (each with self-contained  ablutions), a number of self-contained cottage units and several units housing prisoners designed for a range of operational needs including mental health, management, remand, protected prisoners and a specialised mother/child unit.


The proposed works can be separated into two aspects, the western expansion which is external to the facility and works within the current perimeter.


The proposed western expansion comprises of:


106 cellular beds

  • Dawson Building (DA – 66 bed Reception Unit)
  • Avon Building (AN – 20 bed Management Unit)
  • Gordon Building (AS – 20 bed Management Unit)


Supporting infrastructure

  • Reception Building (RB)
  • Multi-Purpose Recreation (MP)
  • Prime barrier wall & fencing


The proposed works within the existing perimeter are:

  • Demolish a number of existing infrastructure
  • Canteen (CT)
  • Main Kitchen (KI)
  • New landscaping and fencing


HOW TO REGISTER AN EXPRESSION OF INTEREST (EOI)

  • To submit an EOI, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
  • This is an initial, generic EOI submission only. All companies who submit an EOI will be included in information presented to companies who are short listed to bid for this Project.
  • The services, programmes and initiatives provided by ICN Victoria are aimed at complementing a company's existing Sales, Marketing and Business Development strategy and any EOI submitted should not be considered as an alternative to these activities.


ICN GATEWAY COMPANY REGISTRATION

  • Click here to register your company profile on ICN Gateway.
  • Support and assistance are available through the web links listed below.
  • An ICN Gateway company profile that accurately and effectively summarises your company is critical to using the services of the ICN Group - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
  • Companies should ensure that the email notification functionality within their ICN Gateway company profile is activated to include an appropriate level of coverage to Information & Updates, Major Projects and Regional Opportunities.


(1) ICN Gateway Setup Wizard


(2) ICN Gateway User Guide

Share this project on:

FB Twitter LinkedIn

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status
Accordian collapse

General

AccordianPlus Any Opportunities

Full Scope EOI

Create EOI
Closes: 
07 Jul 2023 (AEDT)

Partial Scope EOI

  Open
Accordian collapse

Miscellaneous

AccordianPlus Blinds and Curtains

Full Scope EOI

Closed: 
28 Jul 2021 (AEDT)

Partial Scope EOI

Closed: 
28 Jul 2021 (AEDT)
  Awarded
AccordianPlus Lockers

Full Scope EOI

Closed: 
28 Jul 2021 (AEDT)

Partial Scope EOI

Closed: 
28 Jul 2021 (AEDT)
  Awarded
AccordianPlus Toilet Partitions

Full Scope EOI

Closed: 
28 Jul 2021 (AEDT)

Partial Scope EOI

Closed: 
28 Jul 2021 (AEDT)
  Awarded
AccordianPlus Carpentry

Full Scope EOI

Closed: 
05 Aug 2021 (AEDT)

Partial Scope EOI

Closed: 
05 Aug 2021 (AEDT)
  Awarded
AccordianPlus Joinery

Full Scope EOI

Closed: 
05 Aug 2021 (AEDT)

Partial Scope EOI

Closed: 
05 Aug 2021 (AEDT)
  Awarded
AccordianPlus Fencing and Gates

Full Scope EOI

Closed: 
18 Aug 2021 (AEDT)

Partial Scope EOI

Closed: 
18 Aug 2021 (AEDT)
  Awarded
AccordianPlus Painting

Full Scope EOI

Closed: 
18 Aug 2021 (AEDT)

Partial Scope EOI

Closed: 
18 Aug 2021 (AEDT)
  Awarded
AccordianPlus Landscaping

Full Scope EOI

Closed: 
02 Sep 2021 (AEDT)

Partial Scope EOI

Closed: 
02 Sep 2021 (AEDT)
  Awarded

Full Scope EOI

Closed: 
28 Jul 2021 (AEDT)

Partial Scope EOI

Closed: 
28 Jul 2021 (AEDT)
  Closed

Full Scope EOI

Closed: 
03 Aug 2021 (AEDT)

Partial Scope EOI

Closed: 
03 Aug 2021 (AEDT)
  Closed
AccordianPlus Signage

Full Scope EOI

Closed: 
04 Aug 2021 (AEDT)

Partial Scope EOI

Closed: 
04 Aug 2021 (AEDT)
  Closed
AccordianPlus Stair Nosings

Full Scope EOI

Closed: 
05 Aug 2021 (AEDT)

Partial Scope EOI

Closed: 
05 Aug 2021 (AEDT)
  Closed
AccordianPlus Final Clean

Full Scope EOI

Closed: 
08 Sep 2021 (AEDT)

Partial Scope EOI

Closed: 
08 Sep 2021 (AEDT)
  Closed
Note: The closing date/s for expressions of interest are subject to change.