NEW ENGLAND SOLAR FARM


Project at a glance


NSW Australia
Approved - Construction
GREEN LIGHT CONTRACTORS PTY. LTD.
$500M+

Contact Details


Dusko Bajic
Industry Manager

About Green Light Pty Ltd

Green Light is a wholly owned subsidiary of Elecnor Australia, itself a subsidiary of Elecnor SA, a large Spanish-owned renewable energy group operating in 56 countries around the world. Green Light is the engineering, procurement and construction (EPC) contractor, as well as being responsible for handling the ongoing operation and maintenance (O&M) for the solar farm.


The Project

Green Light Contractors Pty Ltd has been awarded with the EPC contract for the New England Solar Farm (NESF) - Stage one with UPC. The project is located within Uralla Shire Council (USC) in the Northern Tablelands region of New South Wales. NESF is located approximately 6km north-east of Uralla, 15km south of Armidale and 80km north of Tamworth. The New England Solar Farm will occupy a 3,362-hectare site.
Stage one includes a 400MWAC solar farm, 33/330kV Substation, and an operations and maintenance building (O&M Building).
The solar farm will convert energy from solar radiation into electrical energy which will then be fed into the electricity grid. Approximately 978,576 Photovoltaic modules will be mounted onto a horizontal single-axis tracking system that follows the path of the sun.
Using inverters and step-up transformers, the PCUs will convert the DC electrical energy into AC electrical energy at an optimized reticulation voltage, anticipated to be 33 kV.


General Information on Project

https://www.newenglandsolarfarm.com.au

Please click here for more information about the project.


How to register an Expression of Interest

This is a general EoI submission and Work Packages currently available to submit an EoI for are listed below.

Shortlisted SMEs will be invited to tender Work Packages as needed.

To submit an initial EoI for the Work Scopes, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.


ICN Gateway Company Registration

Click here to register your company profile on ICN Gateway.

Support and assistance is available through the web links listed below.

Your company summary and company description are used to assess your ability to complete projects when you lodge an EoI- please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

Project Documents
General

Share this project on:

FB Twitter LinkedIn

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status

Full Scope EOI

Closed: 
01 Jun 2021 (AEST)

Partial Scope EOI

  Awarded
AccordianPlus CCTV

Full Scope EOI

Closed: 
25 Jun 2021 (AEST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
26 May 2021 (AEST)

Partial Scope EOI

  Awarded
AccordianPlus Fire Water Tanks

Full Scope EOI

Closed: 
14 Apr 2021 (AEST)

Partial Scope EOI

  Awarded
AccordianPlus Mechanical Works

Full Scope EOI

Closed: 
15 Jun 2021 (AEST)

Partial Scope EOI

  Awarded
AccordianPlus Power Quality Meters

Full Scope EOI

Closed: 
31 Mar 2021 (AEST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
29 May 2021 (AEST)

Partial Scope EOI

  Awarded
AccordianPlus Surveying works

Full Scope EOI

Closed: 
10 Jun 2021 (AEST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
30 Jul 2021 (AEST)

Partial Scope EOI

  Awarded
AccordianPlus Weather Station

Full Scope EOI

Closed: 
31 Mar 2021 (AEST)

Partial Scope EOI

  Awarded
AccordianPlus Cleaning

Full Scope EOI

Closed: 
07 Sep 2021 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Clearing and Grubbing

Full Scope EOI

Closed: 
20 Jun 2021 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
07 Jul 2021 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Electrical Accessories

Full Scope EOI

Closed: 
15 Jul 2021 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Food Truck

Full Scope EOI

Closed: 
30 Sep 2021 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
30 Jun 2021 (AEST)

Partial Scope EOI

  Closed
AccordianPlus High Voltage Works

Full Scope EOI

Closed: 
30 Jun 2021 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
12 Jul 2021 (AEST)

Partial Scope EOI

  Closed
AccordianPlus LV Electrical Works

Full Scope EOI

Closed: 
07 Jul 2021 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
30 Sep 2021 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
24 Aug 2021 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Piling works

Full Scope EOI

Closed: 
10 Jun 2021 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Site compound

Full Scope EOI

Closed: 
10 Jun 2021 (AEST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
01 Jun 2021 (AEST)

Partial Scope EOI

  Closed
AccordianPlus Waste Disposal

Full Scope EOI

Closed: 
07 Sep 2021 (AEST)

Partial Scope EOI

  Closed
Note: The closing date/s for expressions of interest are subject to change.