Advanced Robotics for Manufacturing Hub Limited (Development of a facility)



Contact Details


Nimmi Pushparajan
Procurement Engineering Specialist
+61 7 3364 0670
 CONTACT EMAIL

  Locations: QLD Australia
  Project Value: TBA
  Project Status: Inviting EOIs
  Project Owner ADVANCED ROBOTICS FOR MANUFACTURING HUB LTD

Project Details


The ARM Hub is an agile world-leading technology centre in robotics and design-led manufacturing. Headquartered in Brisbane, the ARM Hub provides access to the most tightly woven network of research institutions, facilities and smart commercial companies in the region. The ARM Hub with its recent funding is aiming to develop a small facility which will involve a local industry participation process. 


This project is to build an office/admin building within the existing manufacturing facility warehouse located at Northgate, Queensland. 


For businesses new to the ARM Hub, their services represent a journey. From accessing information, facilities, experience, and networks, to embarking on projects that can demonstrate commercial value in the short-term, to investing in longer-term R&D to secure the market advantages of innovation. The ARM Hub builds expert teams around the needs of each business transformation.


Industry Engagement

  • Industry 4.0 business readiness workshops
  • Site visits and needs assessments
  • Technology demonstrations
  • Business networking

Commercial Solutions

  • Adoption sprints for agile implementation of new technologies
  • Demonstration to validate new technology applications
  • Expert services to support client business objectives
     


EXPRESSIONS OF INTEREST


The ARM Hub encourages local industry interested in supplying to the project to register an expression of interest (EOI) on the work-packages listed below through the ICN Gateway webpage. Information on specific supply opportunities is communicated on this ICN Gateway project page allowing industry to register its interest against them during EOI open period.


Please ensure that:

  • Your company profile on the ICN Gateway is complete, up-to-date and accurate including electing to be notified via e-mail of supply opportunities.
  • You register your interest as a full or partial scope supplier (where applicable), and
  • You respond to all project and work package-specific questions.

 
It is important that businesses submitting an EOI are aware that their submission does not guarantee that they will progress further in the procurement process. Only companies that can demonstrate capability and capacity in accordance with the project requirements will be invited to pre-qualify for specific opportunities.


Businesses which demonstrate local benefits and demonstrate ability to meet other qualification criteria will be highly regarded.



SHOW LESS

Work Packages


To edit or submit an expression of interest, select the icon next to the package you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN    INCOMPLETE    COMPLETE

STANDARD LISTINGS        ▲ CONTRACT
STATUS   CONCRETE & DRIVEWAY    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Concrete Place18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Concrete Pumping18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Concrete Supply18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Saw Cutting and Jointing18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
STATUS   MEZZANINE FLOOR    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Aluminium Windows and Doors18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Bathroom and Tapware18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
External Works18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Flooring18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Gas Line Installation and Certification18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Joinery18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Kitchen Appliances18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Materials - Acoustic Lagging18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Materials - Frames18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Metalwork - Roof18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Painting18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Plastering18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Rendering Finishes18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Shower Screens and Robes18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Tiler (no materials)18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Tiles18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Waterproofing18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
STATUS   PRELIMINARIES    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Block Layer18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Cleaning18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Demolition and Earthworks18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Electrical Power Connection18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Form Worker18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Hire Plant and Equipment18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Masonry18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Reinforcement (Steel)18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Scaffolding18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Site Skips and Rubbish Removal18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Structural Steel Work - Steel18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Toilet Hire18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
STATUS   SEWER MAIN & WATER CONNECTION    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Carpentry work18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Electrical Fittings18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Electrical Services18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Fire Doors18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Fire Hydrant Pump and Fit Off18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Fire sprinklers18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.
Hydraulic Services18 Dec 202005 Feb 2021 
  
ICN hereby invites Expression of Interest (EOI) from respective trade contractors and suppliers for the Advanced Robotics for Manufacturing Hub Limited (Development of a facility) project. All EOI submissions should be made through the ICN Gateway.