Barossa Gas Export Pipeline EPCI (Allseas)


Project at a glance


NT Australia (Offshore)
FEED
SANTOS LTD
> AUD $500 Million

Contact Details


Adrian Parkins
Work Package Manager
+61 8 6181 9500

About Allseas Group S.A. ("Allseas")

Allseas Group S.A. is a global leader in offshore pipeline installation and subsea construction. The company employs over 2,000 people worldwide and operates a versatile fleet of six specialised pipelay and support vessels, designed and developed in-house.


Founded in 1985, Allseas has gained worldwide experience in all types of offshore and subsea construction projects. Allseas' approach is to support clients already in the conceptual design stage and offer its services for project management, engineering and procurement up to and including installation and commissioning.


About the project

Barossa is an offshore gas and light condensate project being progressed by the Barossa Joint Venture comprising Santos Offshore Pty Ltd (Santos) as Operator and SK E&S Australia Pty Ltd.


As part of the Project, the Joint Venture selected Allseas as the contractor to perform the Engineering Procurement, Construction and Installation of the Gas Export Pipeline.


Scope of Work of the GEP EPCI contract

As part of the Barossa development, Allseas will be responsible for the installation of the offshore rigid gas export pipeline and associated end structures (PLETs), as well as installation of mattresses for span correction, buckle initiation and pipeline crossing. Finally, Allseas will flood, clean, gauge and test the installed pipelines, after which the pipeline will be dewatered and conditioned with nitrogen.


Allseas is committed to working constructively with Australian industry to identify and develop options to ensure a Full, Fair, and Reasonable opportunity is provided for Australian industry to participate whenever feasible.


Allseas shall support the Barossa Australian Industry Participation (AIP) Plan to ensure all Suppliers are given a Full, Fair and Reasonable Opportunity to participate in the development of the Barossa Project. Allseas will comply with all the requirements as stated in the AIP Plan and the Australian Jobs Act 2013 throughout the Project.


Further details on the Project and associated opportunities can be found at:BarossaOffshore.icn.org.au

Share this project on:

FB Twitter LinkedIn

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status
Accordian collapse

Current Opportunities

Full Scope EOI

Closed: 
14 Feb 2020 (ACST)

Partial Scope EOI

Closed: 
14 Mar 2020 (ACST)
  Awarded

Full Scope EOI

Closed: 
27 Nov 2020 (ACST)

Partial Scope EOI

Closed: 
27 Dec 2020 (ACST)
  Awarded

Full Scope EOI

Closed: 
18 May 2021 (ACST)

Partial Scope EOI

Closed: 
25 May 2021 (ACST)
  Awarded

Full Scope EOI

Closed: 
17 Jan 2022 (ACST)

Partial Scope EOI

Closed: 
14 Feb 2022 (ACST)
  Awarded
Accordian collapse

Miscellaneous

AccordianPlus Keep me updated

Full Scope EOI

Create EOI
Closes: 
31 Dec 2024 (ACST)

Partial Scope EOI

  Open
Note: The closing date/s for expressions of interest are subject to change.
PROJECT
NT AUSTRALIA

Barossa is an offshore gas and light condensate project being progressed by the Barossa Joint Venture comprising Santos Offshore Pty Ltd (Santos) as Operator and SK E&S Australia Pty Ltd.

View Project
PROJECT
WA AUSTRALIA

The Dorado oil field contains 140 mmbbls (2C, 100%) of oil. It is located in the Bedout basin, approximately 150km north of Port Hedland in Petroleum permit WA-437-P. The project will be developed jointly in line with the equity split of Santos Offshore Pty Ltd 80% and Carnarvon Petroleum Pty Ltd 20%.

The offshore resource would be developed with up to 16 platform wells drilled by a jack-up drilling rig. These would be connected back to an adjacent Floating Production, Storage and Offloading facility (FPSO) moored in 95 metres of water above the Dorado field.

The proposed FPSO unit will have processing facilities to stabilise and store the oil and compress and re-inject gas to the reservoir.

View Project
PROJECT
NT AUSTRALIA

Barossa is an offshore gas and light condensate project being progressed by the Barossa Joint Venture comprising Santos NA Barossa Pty Ltd (Santos) as Operator, Santos Offshore Pty Ltd and SK E&S Australia Pty Ltd.

As part of the Barossa Offshore Project, Santos has selected BWO as the contractor to provide the FPSO Services.

View Project
PROJECT
NT AUSTRALIA

Barossa is an offshore gas and light condensate project being progressed by the Barossa Joint Venture comprising Santos NA Barossa Pty Ltd (Santos) as Operator, Santos Offshore Pty Ltd and SK E&S Australia Pty Ltd.

As part of the Barossa Offshore Project, Santos has selected Subsea 7 as the contractor to provide the Transportation and Installation of Subsea Umbilicals Risers and Flowlines (SURF).

View Project
PROJECT
NT AUSTRALIA

The Darwin LNG plant (DLNG) is a single train liquefaction and storage facility located at Wickham Point on Darwin Harbour, Northern Territory, Australia. DLNG is currently receiving gas from the Bayu-Undan field in the Timor Sea and converts it into LNG. DLNG was commissioned in 2006 and has a design life to 2027. Bayu-Undan produced its first gas in 2004 and is now approaching the end of field life.

The DLNG Life Extension Project (the Project) seeks to utilise the shutdown window created by Bayu-Undan end of life to prepare the DLNG facility for backfill from the Barossa field, by undertaking several brownfield work packages.

View Project
PROJECT
WA AUSTRALIA

The Dorado field is located in the Bedout sub-basin, approximately 150km North of Port Hedland in Petroleum permit WA-437-P. The project will be developed by Santos in a joint venture with Carnarvon Petroleum. Development is planned to consist of a disconnect able Floating Production, Storage and Offloading facility (FPSO) with a 16 slot Wellhead Platform (WHP) using a jack-up drilling rig, connected via subsea production and injection flowlines, risers and umbilical.


View Project
PROJECT
WA AUSTRALIA

A proudly Australian Company, Santos is the biggest producer of domestic gas in Western Australia and has been operating in the west since its first oshore discovery, in the Carnarvon Basin, in the early 1980s.

View Project
PROJECT

Santos is a global low-cost producer of oil and gas committed to ever-cleaner energy and fuels production with operations across Australia, Papua New Guinea, Timor-Leste and North America.


View Project
PROJECT
NT AUSTRALIA

The Bayu-Undan Carbon Capture and Storage (CCS) Project targets the capture of up to 10 Mtpa of CO2 at a Darwin hub - initially from the Darwin LNG facility (DLNG), with potential future expansion to proximal 3rd party. Captured CO2 will be transported to, and stored in, the offshore Bayu-Undan reservoir (in Timor Leste waters).

View Project
PROJECT
NT AUSTRALIA

Allseas Group S.A. is a global leader in offshore pipeline installation and subsea construction. The company employs over 2,000 people worldwide and operates a versatile fleet of six specialised pipelay and support vessels, designed and developed in-house.

View Project