The Dorado oil field is located in the Bedout basin, approximately 150km north of Port Hedland in Petroleum permit WA-437-P. The project will be developed jointly in line with the equity split of Santos 80% and Carnarvon Petroleum 20%.


The offshore resource is expected to be developed with up to 16 platform wells drilled by a jack-up drilling rig. These would be connected back to an adjacent Floating Production, Storage and Offloading facility (FPSO) moored in 95 metres of water above the Dorado field.


The proposed FPSO unit will have processing facilities to stabilise and store the oil and compress and re-inject gas to the reservoir.


Santos anticipates that the development will have an estimated 10-15 years oil life. A Front End Engineering Design (FEED) decision is targeted for 2021, followed by a Final Investment Decision (FID) in 2022 and production Ready For Start Up (RFSU) some 4 years later.Targets are subject to all necessary joint venture approvals, regulatory approvals and/or appropriate commercial arrangements.


The Dorado contracting strategy has been developed around four main work elements:

  • Drilling & Completions (D&C);
  • Supply and Installation of Offshore Hardware, including a Well Head Platform, Umbilicals, Risers & Flowlines;
  • Engineering, Procurement, Construction & Commissioning of a Floating Production Storage and Offloading facility (FPSO); and
  • Logistics.

The procurement approach for these major scopes, including FEED, will be through a competitive tendering process with a mix of Engineer Procure Construct / Install (EPC/I), purchase or leasing as appropriate. The majority of procurement activity will take place post-FID. Under each of these work elements, where applicable, successful Tier 1 contractor(s) will assume responsibilities as the 'Procurement Entity' acting on behalf of Santos as the 'Project Proponent'.


For all itemised packages that result in a sub-contract to the Procurement Entity, each Procurement Entity will be required to conduct their procurement activities in line with the actions outlined in this plan, providing full, fair and reasonable opportunity for Australian entities to participate where capable and competitive

Share this project on:

FB Twitter LinkedIn

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status
Accordian collapse

Miscellaneous

Full Scope EOI

Closed: 
02 Mar 2020 (AWST)

Partial Scope EOI

Closed: 
02 Mar 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
24 Mar 2020 (AWST)

Partial Scope EOI

Closed: 
24 Mar 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
02 Oct 2020 (AWST)

Partial Scope EOI

Closed: 
02 Oct 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
30 Apr 2021 (AWST)

Partial Scope EOI

Closed: 
30 Apr 2021 (AWST)
  Awarded

Full Scope EOI

Closed: 
30 Apr 2021 (AWST)

Partial Scope EOI

Closed: 
30 Apr 2021 (AWST)
  Awarded

Full Scope EOI

Closed: 
30 Apr 2021 (AWST)

Partial Scope EOI

Closed: 
30 Apr 2021 (AWST)
  Awarded

Full Scope EOI

Closed: 
27 May 2021 (AWST)

Partial Scope EOI

Closed: 
27 May 2021 (AWST)
  Awarded

Full Scope EOI

Closed: 
27 Oct 2020 (AWST)

Partial Scope EOI

Closed: 
27 Oct 2020 (AWST)
  Closed
AccordianPlus Flexible Pipe

Full Scope EOI

Closed: 
05 May 2021 (AWST)

Partial Scope EOI

Closed: 
05 May 2021 (AWST)
  Closed
AccordianPlus Umbilical

Full Scope EOI

Closed: 
14 Jun 2021 (AWST)

Partial Scope EOI

Closed: 
14 Jun 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
23 Aug 2021 (AWST)

Partial Scope EOI

Closed: 
23 Aug 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
28 Aug 2021 (AWST)

Partial Scope EOI

Closed: 
28 Aug 2021 (AWST)
  Closed
AccordianPlus Helicopter Services

Full Scope EOI

Closed: 
02 Jun 2021 (AWST)

Partial Scope EOI

Closed: 
30 Sep 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
19 Oct 2021 (AWST)

Partial Scope EOI

Closed: 
19 Oct 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
15 Mar 2022 (AWST)

Partial Scope EOI

Closed: 
15 Mar 2022 (AWST)
  Closed

Full Scope EOI

Closed: 
06 Jun 2022 (AWST)

Partial Scope EOI

Closed: 
06 Jun 2022 (AWST)
  Closed

Full Scope EOI

Closed: 
19 Apr 2020 (AWST)

Partial Scope EOI

  Closed
Note: The closing date/s for expressions of interest are subject to change.
PROJECT
NT AUSTRALIA

Barossa is an offshore gas and light condensate project being progressed by the Barossa Joint Venture comprising Santos Offshore Pty Ltd (Santos) as Operator and SK E&S Australia Pty Ltd.

View Project
PROJECT
NT AUSTRALIA

As part of the Barossa development, Allseas will be responsible for the installation of the offshore rigid gas export pipeline and associated end structures (PLETs), as well as installation of mattresses for span correction, buckle initiation and pipeline crossing.

View Project
PROJECT
NT AUSTRALIA

Barossa is an offshore gas and light condensate project being progressed by the Barossa Joint Venture comprising Santos NA Barossa Pty Ltd (Santos) as Operator, Santos Offshore Pty Ltd and SK E&S Australia Pty Ltd.

As part of the Barossa Offshore Project, Santos has selected BWO as the contractor to provide the FPSO Services.

View Project
PROJECT
NT AUSTRALIA

Barossa is an offshore gas and light condensate project being progressed by the Barossa Joint Venture comprising Santos NA Barossa Pty Ltd (Santos) as Operator, Santos Offshore Pty Ltd and SK E&S Australia Pty Ltd.

As part of the Barossa Offshore Project, Santos has selected Subsea 7 as the contractor to provide the Transportation and Installation of Subsea Umbilicals Risers and Flowlines (SURF).

View Project
PROJECT
NT AUSTRALIA

The Darwin LNG plant (DLNG) is a single train liquefaction and storage facility located at Wickham Point on Darwin Harbour, Northern Territory, Australia. DLNG is currently receiving gas from the Bayu-Undan field in the Timor Sea and converts it into LNG. DLNG was commissioned in 2006 and has a design life to 2027. Bayu-Undan produced its first gas in 2004 and is now approaching the end of field life.

The DLNG Life Extension Project (the Project) seeks to utilise the shutdown window created by Bayu-Undan end of life to prepare the DLNG facility for backfill from the Barossa field, by undertaking several brownfield work packages.

View Project
PROJECT
WA AUSTRALIA

The Dorado field is located in the Bedout sub-basin, approximately 150km North of Port Hedland in Petroleum permit WA-437-P. The project will be developed by Santos in a joint venture with Carnarvon Petroleum. Development is planned to consist of a disconnect able Floating Production, Storage and Offloading facility (FPSO) with a 16 slot Wellhead Platform (WHP) using a jack-up drilling rig, connected via subsea production and injection flowlines, risers and umbilical.


View Project
PROJECT
WA AUSTRALIA

A proudly Australian Company, Santos is the biggest producer of domestic gas in Western Australia and has been operating in the west since its first oshore discovery, in the Carnarvon Basin, in the early 1980s.

View Project
PROJECT

Santos is a global low-cost producer of oil and gas committed to ever-cleaner energy and fuels production with operations across Australia, Papua New Guinea, Timor-Leste and North America.


View Project
PROJECT
NT AUSTRALIA

The Bayu-Undan Carbon Capture and Storage (CCS) Project targets the capture of up to 10 Mtpa of CO2 at a Darwin hub - initially from the Darwin LNG facility (DLNG), with potential future expansion to proximal 3rd party. Captured CO2 will be transported to, and stored in, the offshore Bayu-Undan reservoir (in Timor Leste waters).

View Project
PROJECT
NT AUSTRALIA

Allseas Group S.A. is a global leader in offshore pipeline installation and subsea construction. The company employs over 2,000 people worldwide and operates a versatile fleet of six specialised pipelay and support vessels, designed and developed in-house.

View Project