Jansz-Io Compression


Project at a glance


WA Australia (Offshore)
Phase 4(Execution)
Chevron Australia Pty Ltd

Contact Details


Hengameh Kiani
+61 8 9365 7543

Opportunities listed below are for Chevron Australia Pty Ltd packages specifically for Janz-Io Compression. Australia-wide contracts utilised for Jansz-Io Compression will be listed on the Chevron Australia Operations page.


Project Description

The Chevron Australia operated Gorgon Project is one of the world's largest natural gas projects and the largest single resource development in Australia's history. The Jansz-Io Compression (J-IC) Project objective is to unlock low pressure reserves from the Jansz-Io reservoir and maintain plateau production rates to the Gorgon Project facilities on Barrow Island (BWI). The J-IC Project is therefore an upgrade to an existing facility.

The development will comprise of two subsea compression stations connected via a manifold structure to the Jansz-Io Midline Pipeline Termination Structure and the installation of the following supporting infrastructure:

New power generation capacity (as required) and cross-island High Voltage (HV) power cables on BWI;

Offshore (subsea) HV cables; and

Field Control Station (FCS), an offshore normally unattended installation semi-submersible electrical andcontrols distribution platform.


For more details of the project visit Chevron website:https://australia.chevron.com


The Project is Operated by Chevron Australia Pty Ltd (Operator) on behalf of the Gorgon Joint Venturers and the Jansz-Io Unit Joint Ventures.

1) the Gorgon Joint Venturers being: Chevron Australia Pty Ltd; Chevron (TAPL) Pty Ltd; Shell Australia Pty Ltd; Mobil Australia Resources Company Pty Ltd; Osaka Gas Gorgon Pty Ltd; Tokyo Gas Gorgon Pty Ltd; and JERA Gorgon Pty Ltd; and

2) the Jansz-Io Unit Joint Ventures being the same parties as the above.

Project Location

The Jansz-Io gas fields are situated approximately 190 kilometres offshore and Barrow Island (BWI) approximately 70 kilometres off the north-west coast of Western Australia.

Further information on Accessing Opportunities with Chevron Australia onJansz-Io Packagescan be found under Project Documents below

Share this project on:

FB Twitter LinkedIn

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status
Accordian collapse

Miscellaneous

Full Scope EOI

Closed: 
16 May 2019 (AWST)

Partial Scope EOI

Closed: 
16 Dec 2021 (AWST)
  Awarded

Full Scope EOI

Closed: 
06 Apr 2020 (AWST)

Partial Scope EOI

Closed: 
06 Dec 2022 (AWST)
  Awarded

Full Scope EOI

Closed: 
30 Nov 2019 (AWST)

Partial Scope EOI

Closed: 
05 Dec 2021 (AWST)
  Closed
AccordianPlus Electrical Buildings

Full Scope EOI

Closed: 
05 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
05 Dec 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
07 Nov 2019 (AWST)

Partial Scope EOI

Closed: 
07 Dec 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
07 Nov 2019 (AWST)

Partial Scope EOI

Closed: 
07 Dec 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
12 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
12 Dec 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
12 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
12 Dec 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
16 May 2019 (AWST)

Partial Scope EOI

Closed: 
16 Dec 2021 (AWST)
  Closed
AccordianPlus HVAC

Full Scope EOI

Closed: 
19 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
19 Dec 2021 (AWST)
  Closed
AccordianPlus Telecom Equipment

Full Scope EOI

Closed: 
19 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
19 Dec 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
22 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
21 Dec 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
22 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
22 Dec 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
24 Oct 2019 (AWST)

Partial Scope EOI

Closed: 
24 Dec 2021 (AWST)
  Closed
AccordianPlus Hydraulic Power Unit

Full Scope EOI

Closed: 
29 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
28 Dec 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
29 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
29 Dec 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
31 Oct 2019 (AWST)

Partial Scope EOI

Closed: 
31 Dec 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
31 Oct 2019 (AWST)

Partial Scope EOI

Closed: 
31 Dec 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
07 Aug 2020 (AWST)

Partial Scope EOI

Closed: 
07 Dec 2022 (AWST)
  Closed

Full Scope EOI

Closed: 
08 Jan 2020 (AWST)

Partial Scope EOI

Closed: 
08 Dec 2022 (AWST)
  Closed

Full Scope EOI

Closed: 
06 Apr 2022 (AWST)

Partial Scope EOI

Closed: 
06 Apr 2023 (AWST)
  Closed
Note: The closing date/s for expressions of interest are subject to change.
PROJECT
WA AUSTRALIA

The Chevron Australia-operated Gorgon Project is one of the world's largest natural gas projects and the largest single resource development in Australia's history. The Gorgon LNG and domestic gas plants on Barrow Island (BWI) are supplied by gas from the offshore Gorgon and Jansz-Io fields. The Jansz-Io Compression (J-IC) Project will use proven subsea compression technology to enhance the recoverability of the Jansz-Io field to maintain long-term natural gas supply to the gas processing facilities on BWI. Part of the original development plan for Gorgon, the J-IC Project involves the modification of the existing subsea gas gathering network in the Jansz-Io field.

View Project
PROJECT
WA AUSTRALIA

The Chevron Australia operated Gorgon Project is one of the world's largest natural gas projects and the largest single resource development in Australia's history. The Jansz-Io Compression (J-IC) Project objective is to unlock low pressure reserves from the Jansz-Io reservoir and maintain plateau production rates to the Gorgon Project facilities on Barrow Island (BWI). The J-IC Project is therefore an upgrade to an existing facility.

View Project
PROJECT
WA AUSTRALIA

Nexans Norway AS has been awarded a contract to engineer, manufacture and install a high voltage power cable from Barrow Island to an Normally Unattended Installation (NUI) semisubmersible Field Control Station (FCS). The scope comprises a 145kV HVAC cable of 135km, of which the nearest section to the FCS is dynamic in a lazy wave configuration, as well as supply of 15km of HV power and fibre optic cables to be installed on Barrow Island.

The HVAC power cable will cross eight pipelines/umbilicals along the route from BWI to the FCS. Prior to laying the cable all crossings will be prepared with concrete mattresses. After the power cable is laid on seabed it will be stabilised with rock installation and trenching within the shallow water section.

View Project
PROJECT
WA AUSTRALIA

The Chevron Australia operated Gorgon Project is one of the world's largest natural gas projects and the largest single resource development in Australia's history. The Gorgon LNG and domestic gas plants on Barrow Island (BWI) are supplied by gas from the offshore Gorgon and Jansz-Io fields. The Jansz-Io Compression (J-IC) Project will use proven subsea compression technology to enhance the recoverability of the Jansz-Io field to maintain long-term natural gas supply to the gas processing facilities on BWI. Part of the original development plan for Gorgon, the J-IC Project involves the modification of the existing subsea gas gathering network in the Jansz-Io field.

View Project
PROJECT
WA AUSTRALIA

The Chevron Australia operated Gorgon Project is one of the world's largest natural gas projects and the largest single resource development in Australia's history.

View Project