Iron Bridge Magnetite Project


Project at a glance


WA Australia (Onshore)
Project Execution Phase
IB OPERATIONS PTY LTD

Contact Details


Andie Pfaff
Project Officer
+61 8 9365 7442

Iron Bridge Magnetite Project

Project owner: IB Operations Pty Ltd, as agent for Iron Bridge Joint Venture between FMG Magnetite Pty Ltd and Formosa Steel IB Pty Ltd


Project Details:

The Iron Bridge Magnetite Project (Project) is the development of a new magnetite mine (including processing and transport facilities) and associated infrastructure. Iron Bridge will deliver 22 million tonnes per annum (mtpa) of high grade 67% Fe magnetite concentrate product. The Iron Bridge site comprises the world class North Star and Glacier Valley magnetite ore bodies, located 145km south of Port Hedland.

IB Operations is seeking expressions of interest from suitably qualified contractors and suppliers for Project tendering opportunities on the ICN Gateway.


Scope Overview:

The Project scope will require the establishment of new facilities, including:

mine

ore processing facility

slurry and return water pipeline

raw water pipeline

port infrastructure

non-process infrastructure, such as airstrip, village extension, telecommunications networks,

electricity, water, sewage and wastewater facilities.


The Iron Bridge Project will be operated by IB Operations Pty Ltd, as agent for the Iron Bridge Joint Venture between FMG Magnetite Pty Ltd and Formosa Steel IB Pty Ltd. IB Operations Pty Ltd is an Australian private company, which is owned by FMG Magnetite Pty Ltd and Formosa Steel IB Pty Ltd, each a participant in the unincorporated Iron Bridge Joint Venture.


Local and Indigenous participation:

In line with Fortescue's commitment to supporting local Western Australian communities, requirements relating to the engagement of local and Indigenous vendors will be included in the selection criteria for the Iron Bridge Magnetite Project tendering opportunities.

Share this project on:

FB Twitter LinkedIn

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status
Accordian collapse

Operations

Full Scope EOI

Closed: 
14 Jun 2019 (AWST)

Partial Scope EOI

Closed: 
14 Jun 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
16 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
16 Aug 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
28 Nov 2019 (AWST)

Partial Scope EOI

Closed: 
28 Nov 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
10 Jan 2020 (AWST)

Partial Scope EOI

Closed: 
10 Jan 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
27 Feb 2020 (AWST)

Partial Scope EOI

Closed: 
27 Feb 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
26 Mar 2020 (AWST)

Partial Scope EOI

Closed: 
26 Mar 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
13 Oct 2020 (AWST)

Partial Scope EOI

Closed: 
13 Oct 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
10 Dec 2020 (AWST)

Partial Scope EOI

Closed: 
10 Dec 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
15 Dec 2020 (AWST)

Partial Scope EOI

Closed: 
15 Dec 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
16 Dec 2020 (AWST)

Partial Scope EOI

Closed: 
16 Dec 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
01 Mar 2021 (AWST)

Partial Scope EOI

Closed: 
01 Mar 2021 (AWST)
  Awarded

Full Scope EOI

Closed: 
14 Apr 2021 (AWST)

Partial Scope EOI

Closed: 
14 Apr 2021 (AWST)
  Awarded

Full Scope EOI

Closed: 
19 Apr 2021 (AWST)

Partial Scope EOI

Closed: 
19 Apr 2021 (AWST)
  Awarded
AccordianPlus 662NSP1001 Mine Fleet

Full Scope EOI

Closed: 
26 Apr 2019 (AWST)

Partial Scope EOI

Closed: 
26 Apr 2019 (AWST)
  Closed

Full Scope EOI

Closed: 
10 Jan 2020 (AWST)

Partial Scope EOI

Closed: 
10 Jan 2020 (AWST)
  Closed

Full Scope EOI

Closed: 
04 Mar 2020 (AWST)

Partial Scope EOI

Closed: 
04 Mar 2020 (AWST)
  Closed

Full Scope EOI

Closed: 
09 Mar 2020 (AWST)

Partial Scope EOI

Closed: 
09 Mar 2020 (AWST)
  Closed
AccordianPlus NSC0034 Lubricants

Full Scope EOI

Closed: 
06 Nov 2020 (AWST)

Partial Scope EOI

Closed: 
06 Nov 2020 (AWST)
  Closed

Full Scope EOI

Closed: 
09 Dec 2020 (AWST)

Partial Scope EOI

Closed: 
09 Dec 2020 (AWST)
  Closed

Full Scope EOI

Closed: 
17 Dec 2020 (AWST)

Partial Scope EOI

Closed: 
17 Dec 2020 (AWST)
  Closed

Full Scope EOI

Closed: 
24 Dec 2020 (AWST)

Partial Scope EOI

Closed: 
24 Dec 2020 (AWST)
  Closed

Full Scope EOI

Closed: 
04 Jan 2021 (AWST)

Partial Scope EOI

Closed: 
04 Jan 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
12 Jan 2021 (AWST)

Partial Scope EOI

Closed: 
12 Jan 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
01 Feb 2021 (AWST)

Partial Scope EOI

Closed: 
01 Feb 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
05 Feb 2021 (AWST)

Partial Scope EOI

Closed: 
05 Feb 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
08 Feb 2021 (AWST)

Partial Scope EOI

Closed: 
08 Feb 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
19 Apr 2021 (AWST)

Partial Scope EOI

Closed: 
19 Apr 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
06 Sep 2021 (AWST)

Partial Scope EOI

Closed: 
06 Sep 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
07 Sep 2021 (AWST)

Partial Scope EOI

Closed: 
07 Sep 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
20 Oct 2021 (AWST)

Partial Scope EOI

Closed: 
20 Oct 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
08 Nov 2021 (AWST)

Partial Scope EOI

Closed: 
08 Nov 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
22 Nov 2021 (AWST)

Partial Scope EOI

Closed: 
22 Nov 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
29 Nov 2021 (AWST)

Partial Scope EOI

Closed: 
29 Nov 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
29 Nov 2021 (AWST)

Partial Scope EOI

Closed: 
29 Nov 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
30 Nov 2021 (AWST)

Partial Scope EOI

Closed: 
30 Nov 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
03 May 2022 (AWST)

Partial Scope EOI

Closed: 
03 May 2022 (AWST)
  Closed

Full Scope EOI

Closed: 
29 Jun 2022 (AWST)

Partial Scope EOI

Closed: 
29 Jun 2022 (AWST)
  Closed

Full Scope EOI

Closed: 
29 Jun 2022 (AWST)

Partial Scope EOI

Closed: 
29 Jun 2022 (AWST)
  Closed

Full Scope EOI

Closed: 
29 Jun 2022 (AWST)

Partial Scope EOI

Closed: 
29 Jun 2022 (AWST)
  Closed

Full Scope EOI

Closed: 
29 Jun 2022 (AWST)

Partial Scope EOI

Closed: 
29 Jun 2022 (AWST)
  Closed

Full Scope EOI

Closed: 
16 Jan 2023 (AWST)

Partial Scope EOI

Closed: 
16 Jan 2023 (AWST)
  Closed

Full Scope EOI

Closed: 
16 Jan 2023 (AWST)

Partial Scope EOI

Closed: 
16 Jan 2023 (AWST)
  Closed

Full Scope EOI

Closed: 
28 Feb 2023 (AWST)

Partial Scope EOI

Closed: 
28 Feb 2023 (AWST)
  Closed

Full Scope EOI

Closed: 
12 Apr 2023 (AWST)

Partial Scope EOI

Closed: 
12 Apr 2023 (AWST)
  Closed

Full Scope EOI

Closed: 
17 Apr 2023 (AWST)

Partial Scope EOI

Closed: 
17 Apr 2023 (AWST)
  Closed

Full Scope EOI

Closed: 
17 Apr 2023 (AWST)

Partial Scope EOI

Closed: 
17 Apr 2023 (AWST)
  Closed

Full Scope EOI

Closed: 
17 Apr 2023 (AWST)

Partial Scope EOI

Closed: 
17 Apr 2023 (AWST)
  Closed

Full Scope EOI

Closed: 
17 Apr 2023 (AWST)

Partial Scope EOI

Closed: 
17 Apr 2023 (AWST)
  Closed
AccordianPlus FF24OP002G HV Cable

Full Scope EOI

Closed: 
17 Apr 2023 (AWST)

Partial Scope EOI

Closed: 
17 Apr 2023 (AWST)
  Closed

Full Scope EOI

Closed: 
24 Apr 2023 (AWST)

Partial Scope EOI

Closed: 
24 Apr 2023 (AWST)
  Closed

Full Scope EOI

Closed: 
24 Apr 2023 (AWST)

Partial Scope EOI

Closed: 
24 Apr 2023 (AWST)
  Closed

Full Scope EOI

Closed: 
24 Apr 2023 (AWST)

Partial Scope EOI

Closed: 
24 Apr 2023 (AWST)
  Closed

Full Scope EOI

Closed: 
24 Apr 2023 (AWST)

Partial Scope EOI

Closed: 
24 Apr 2023 (AWST)
  Closed

Full Scope EOI

Closed: 
28 Jul 2023 (AWST)

Partial Scope EOI

Closed: 
28 Jul 2023 (AWST)
  Closed

Full Scope EOI

Closed: 
01 Aug 2023 (AWST)

Partial Scope EOI

Closed: 
01 Aug 2023 (AWST)
  Closed

Full Scope EOI

Closed: 
25 Jan 2024 (AWST)

Partial Scope EOI

Closed: 
25 Jan 2024 (AWST)
  Closed

Full Scope EOI

Closed: 
31 Jan 2024 (AWST)

Partial Scope EOI

Closed: 
31 Jan 2024 (AWST)
  Closed

Full Scope EOI

Closed: 
01 Feb 2024 (AWST)

Partial Scope EOI

Closed: 
01 Feb 2024 (AWST)
  Closed

Full Scope EOI

Closed: 
21 Feb 2024 (AWST)

Partial Scope EOI

Closed: 
21 Feb 2024 (AWST)
  Closed

Full Scope EOI

Closed: 
22 Mar 2024 (AWST)

Partial Scope EOI

Closed: 
22 Mar 2024 (AWST)
  Closed

Full Scope EOI

Closed: 
22 Mar 2024 (AWST)

Partial Scope EOI

Closed: 
22 Mar 2024 (AWST)
  Closed
Accordian collapse

Project Phase

Full Scope EOI

Closed: 
24 Apr 2019 (AWST)

Partial Scope EOI

Closed: 
24 Apr 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
26 Apr 2019 (AWST)

Partial Scope EOI

Closed: 
26 Apr 2019 (AWST)
  Awarded
AccordianPlus 662NSC1006 Airport

Full Scope EOI

Closed: 
02 May 2019 (AWST)

Partial Scope EOI

Closed: 
02 May 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
02 May 2019 (AWST)

Partial Scope EOI

Closed: 
02 May 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
09 May 2019 (AWST)

Partial Scope EOI

Closed: 
09 May 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
17 May 2019 (AWST)

Partial Scope EOI

Closed: 
17 May 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
22 May 2019 (AWST)

Partial Scope EOI

Closed: 
22 May 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
22 May 2019 (AWST)

Partial Scope EOI

Closed: 
22 May 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
22 May 2019 (AWST)

Partial Scope EOI

Closed: 
22 May 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
22 May 2019 (AWST)

Partial Scope EOI

Closed: 
22 May 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
22 May 2019 (AWST)

Partial Scope EOI

Closed: 
22 May 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
22 May 2019 (AWST)

Partial Scope EOI

Closed: 
22 May 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
22 May 2019 (AWST)

Partial Scope EOI

Closed: 
22 May 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
28 May 2019 (AWST)

Partial Scope EOI

Closed: 
28 May 2019 (AWST)
  Awarded
AccordianPlus 662NSP2032 Water Pumps

Full Scope EOI

Closed: 
28 May 2019 (AWST)

Partial Scope EOI

Closed: 
28 May 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
28 May 2019 (AWST)

Partial Scope EOI

Closed: 
28 May 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
28 May 2019 (AWST)

Partial Scope EOI

Closed: 
29 May 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
31 May 2019 (AWST)

Partial Scope EOI

Closed: 
31 May 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
05 Jun 2019 (AWST)

Partial Scope EOI

Closed: 
05 Jun 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
05 Jun 2019 (AWST)

Partial Scope EOI

Closed: 
05 Jun 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
11 Jun 2019 (AWST)

Partial Scope EOI

Closed: 
11 Jun 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
17 Jun 2019 (AWST)

Partial Scope EOI

Closed: 
17 Jun 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
19 Jun 2019 (AWST)

Partial Scope EOI

Closed: 
19 Jun 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
19 Jun 2019 (AWST)

Partial Scope EOI

Closed: 
19 Jun 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
19 Jun 2019 (AWST)

Partial Scope EOI

Closed: 
19 Jun 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
28 Jun 2019 (AWST)

Partial Scope EOI

Closed: 
28 Jun 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
01 Jul 2019 (AWST)

Partial Scope EOI

Closed: 
01 Jul 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
15 Jul 2019 (AWST)

Partial Scope EOI

Closed: 
15 Jul 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
19 Jul 2019 (AWST)

Partial Scope EOI

Closed: 
19 Jul 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
19 Jul 2019 (AWST)

Partial Scope EOI

Closed: 
19 Jul 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
19 Jul 2019 (AWST)

Partial Scope EOI

Closed: 
19 Jul 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
25 Jul 2019 (AWST)

Partial Scope EOI

Closed: 
25 Jul 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
25 Jul 2019 (AWST)

Partial Scope EOI

Closed: 
25 Jul 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
26 Jul 2019 (AWST)

Partial Scope EOI

Closed: 
26 Jul 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
08 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
08 Aug 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
08 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
08 Aug 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
08 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
08 Aug 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
12 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
12 Aug 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
12 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
12 Aug 2019 (AWST)
  Awarded
AccordianPlus 662NSP0018 Dart Valves

Full Scope EOI

Closed: 
19 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
19 Aug 2019 (AWST)
  Awarded
AccordianPlus 662NSP2034 Agitators

Full Scope EOI

Closed: 
21 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
21 Aug 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
22 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
22 Aug 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
23 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
23 Aug 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
26 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
26 Aug 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
27 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
27 Aug 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
27 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
27 Aug 2019 (AWST)
  Awarded
AccordianPlus 662NSP0001 Water Tanks

Full Scope EOI

Closed: 
28 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
28 Aug 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
28 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
28 Aug 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
29 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
29 Aug 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
29 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
29 Aug 2019 (AWST)
  Awarded
AccordianPlus 662NSP0040 Steel Tanks

Full Scope EOI

Closed: 
30 Aug 2019 (AWST)

Partial Scope EOI

Closed: 
30 Aug 2019 (AWST)
  Awarded
AccordianPlus 662NSC5011 Car Hire

Full Scope EOI

Closed: 
03 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
03 Sep 2019 (AWST)
  Awarded
AccordianPlus 662NSP2052 Dam Pumps

Full Scope EOI

Closed: 
03 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
03 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
06 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
06 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
09 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
09 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
09 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
09 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
10 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
10 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
11 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
11 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
17 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
17 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
17 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
17 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
17 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
17 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
17 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
17 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
18 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
18 Sep 2019 (AWST)
  Awarded
AccordianPlus 662NSP0020 HV Motors

Full Scope EOI

Closed: 
18 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
18 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
18 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
18 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
18 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
18 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
20 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
20 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
20 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
20 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
23 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
23 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
23 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
23 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
24 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
24 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
24 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
24 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
25 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
25 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
25 Sep 2019 (AWST)

Partial Scope EOI

Closed: 
25 Sep 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
04 Oct 2019 (AWST)

Partial Scope EOI

Closed: 
04 Oct 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
04 Oct 2019 (AWST)

Partial Scope EOI

Closed: 
04 Oct 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
04 Oct 2019 (AWST)

Partial Scope EOI

Closed: 
04 Oct 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
04 Oct 2019 (AWST)

Partial Scope EOI

Closed: 
04 Oct 2019 (AWST)
  Awarded
AccordianPlus 662NSP2023 Analysers

Full Scope EOI

Closed: 
04 Oct 2019 (AWST)

Partial Scope EOI

Closed: 
04 Oct 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
04 Oct 2019 (AWST)

Partial Scope EOI

Closed: 
04 Oct 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
08 Oct 2019 (AWST)

Partial Scope EOI

Closed: 
08 Oct 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
14 Oct 2019 (AWST)

Partial Scope EOI

Closed: 
14 Oct 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
15 Oct 2019 (AWST)

Partial Scope EOI

Closed: 
15 Oct 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
15 Oct 2019 (AWST)

Partial Scope EOI

Closed: 
15 Oct 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
28 Oct 2019 (AWST)

Partial Scope EOI

Closed: 
28 Oct 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
28 Oct 2019 (AWST)

Partial Scope EOI

Closed: 
28 Oct 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
28 Oct 2019 (AWST)

Partial Scope EOI

Closed: 
28 Oct 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
29 Oct 2019 (AWST)

Partial Scope EOI

Closed: 
29 Oct 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
07 Nov 2019 (AWST)

Partial Scope EOI

Closed: 
07 Nov 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
08 Nov 2019 (AWST)

Partial Scope EOI

Closed: 
08 Nov 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
14 Nov 2019 (AWST)

Partial Scope EOI

Closed: 
14 Nov 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
28 Nov 2019 (AWST)

Partial Scope EOI

Closed: 
28 Nov 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
29 Nov 2019 (AWST)

Partial Scope EOI

Closed: 
29 Nov 2019 (AWST)
  Awarded
AccordianPlus 662NSP0011 Cable

Full Scope EOI

Closed: 
09 Dec 2019 (AWST)

Partial Scope EOI

Closed: 
09 Dec 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
20 Dec 2019 (AWST)

Partial Scope EOI

Closed: 
20 Dec 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
20 Dec 2019 (AWST)

Partial Scope EOI

Closed: 
20 Dec 2019 (AWST)
  Awarded

Full Scope EOI

Closed: 
31 Jan 2020 (AWST)

Partial Scope EOI

Closed: 
31 Jan 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
12 Feb 2020 (AWST)

Partial Scope EOI

Closed: 
12 Feb 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
20 Feb 2020 (AWST)

Partial Scope EOI

Closed: 
20 Feb 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
20 Feb 2020 (AWST)

Partial Scope EOI

Closed: 
20 Feb 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
20 Feb 2020 (AWST)

Partial Scope EOI

Closed: 
20 Feb 2020 (AWST)
  Awarded
AccordianPlus 662NSP0036 CCTV System

Full Scope EOI

Closed: 
21 Feb 2020 (AWST)

Partial Scope EOI

Closed: 
21 Feb 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
26 Feb 2020 (AWST)

Partial Scope EOI

Closed: 
26 Feb 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
26 Feb 2020 (AWST)

Partial Scope EOI

Closed: 
26 Feb 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
14 Apr 2020 (AWST)

Partial Scope EOI

Closed: 
14 Apr 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
22 Apr 2020 (AWST)

Partial Scope EOI

Closed: 
22 Apr 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
31 May 2020 (AWST)

Partial Scope EOI

Closed: 
31 May 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
01 Jul 2020 (AWST)

Partial Scope EOI

Closed: 
01 Jul 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
17 Jul 2020 (AWST)

Partial Scope EOI

Closed: 
17 Jul 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
09 Sep 2020 (AWST)

Partial Scope EOI

Closed: 
09 Sep 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
14 Oct 2020 (AWST)

Partial Scope EOI

Closed: 
14 Oct 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
02 Nov 2020 (AWST)

Partial Scope EOI

Closed: 
02 Nov 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
13 Nov 2020 (AWST)

Partial Scope EOI

Closed: 
13 Nov 2020 (AWST)
  Awarded

Full Scope EOI

Closed: 
02 Apr 2021 (AWST)

Partial Scope EOI

Closed: 
02 Apr 2021 (AWST)
  Awarded

Full Scope EOI

Closed: 
02 Apr 2021 (AWST)

Partial Scope EOI

Closed: 
02 Apr 2021 (AWST)
  Awarded

Full Scope EOI

Closed: 
02 Apr 2021 (AWST)

Partial Scope EOI

Closed: 
02 Apr 2021 (AWST)
  Awarded

Full Scope EOI

Closed: 
02 Apr 2021 (AWST)

Partial Scope EOI

Closed: 
02 Apr 2021 (AWST)
  Awarded

Full Scope EOI

Closed: 
12 May 2021 (AWST)

Partial Scope EOI

Closed: 
12 May 2021 (AWST)
  Awarded

Full Scope EOI

Closed: 
04 Oct 2021 (AWST)

Partial Scope EOI

Closed: 
04 Oct 2021 (AWST)
  Awarded

Full Scope EOI

Closed: 
18 Feb 2022 (AWST)

Partial Scope EOI

Closed: 
18 Feb 2022 (AWST)
  Awarded

Full Scope EOI

Closed: 
29 Nov 2019 (AWST)

Partial Scope EOI

Closed: 
29 Nov 2019 (AWST)
  Closed

Full Scope EOI

Closed: 
21 Feb 2020 (AWST)

Partial Scope EOI

Closed: 
21 Feb 2020 (AWST)
  Closed

Full Scope EOI

Closed: 
09 Oct 2020 (AWST)

Partial Scope EOI

Closed: 
09 Oct 2020 (AWST)
  Closed

Full Scope EOI

Closed: 
29 Dec 2020 (AWST)

Partial Scope EOI

Closed: 
29 Dec 2020 (AWST)
  Closed

Full Scope EOI

Closed: 
18 Jan 2021 (AWST)

Partial Scope EOI

Closed: 
18 Jan 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
02 Apr 2021 (AWST)

Partial Scope EOI

Closed: 
02 Apr 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
02 Apr 2021 (AWST)

Partial Scope EOI

Closed: 
02 Apr 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
02 Apr 2021 (AWST)

Partial Scope EOI

Closed: 
02 Apr 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
02 Apr 2021 (AWST)

Partial Scope EOI

Closed: 
02 Apr 2021 (AWST)
  Closed

Full Scope EOI

Closed: 
02 Apr 2021 (AWST)

Partial Scope EOI

Closed: 
02 Apr 2021 (AWST)
  Closed
Note: The closing date/s for expressions of interest are subject to change.
PROJECT
WA AUSTRALIA

FMG Solomon, a subsidiary of Fortescue Metals Group, will develop the Eliwana Project, following board approval in May 2018.


View Project
PROJECT
WA AUSTRALIA

The Pilbara Generation Project (Project) will enhance Fortescue's existing power generation capacity through the inclusion of 150MW of gas fired reciprocating engine-based power generation, together with 150MW of solar photovoltaic (PV) generation and 50MW of battery storage and will be constructed, owned and operated by Fortescue through its subsidiary Pilbara Energy (Generation) Pty Ltd.

View Project
PROJECT
WA AUSTRALIA

The Pilbara Generation Project aims to increase Fortescue's power generation capacity through the construction by Contract Power Pty Ltd of a new 150 MW gas reciprocating engine power station.

View Project
PROJECT
WA AUSTRALIA

The Pilbara Transmission Project (Project) aims to integrate Fortescue's iron ore mining and port operations in the Pilbara to a common 220kV network.


The creation of this 220kV network and these Stage 4 works will enable Fortescue's existing Solomon Mine power station to supply power to Fortescue's Eliwana Mine (Eliwana).


View Project
PROJECT
WA AUSTRALIA

Fortescue is committed to decarbonising its Australian iron ore operations in mining, port, rail, Non-process Infrastructure and mobile fleet in the Pilbara in Western Australia to achieve real zero terrestrial emissions (Scope 1 and 2) by 2030. Real zero refers to no fossil fuels and wherever possible, no offsets.

View Project