Iron Bridge Magnetite Project



Contact Details


  Linus O'Brien
  (08) 9365 7556
 CONTACT EMAIL

  Locations: WA Australia (Onshore)
  Project Status: Project Execution Phase
  Project Owner IB OPERATIONS PTY LTD

Project Details


Project owner: IB Operations Pty Ltd, as agent for Iron Bridge Joint Venture between FMG Magnetite Pty Ltd and Formosa Steel IB Pty Ltd


Project Details:

The Iron Bridge Magnetite Project (Project) is for the development of a new magnetite mine (including processing and transport facilities) and associated infrastructure at the Iron Bridge Magnetite Project site to support production of 22 wet million tonnes per annum (wmtpa) of high grade, magnetite concentrate product. The Iron Bridge site comprises the North Star, Eastern Limb, Glacier Valley and West Star magnetite iron ore deposits, located 145km south of Port Hedland.  

Delivery of first ore is expected in the first half of calendar year 2022, with ramp up to full production within 12 months.

IB Operations is seeking expressions of interest from suitably qualified contractors and suppliers for Project tendering opportunities on the ICN Gateway. 


Scope Overview:

The Project scope will require the establishment of new facilities, including:

·         mine

·         ore processing facility

·         slurry and return water pipeline

·         raw water pipeline

·         port infrastructure

·         non-process infrastructure, such as airstrip, village extension, telecommunications networks, electricity, water, sewage, and wastewater facilities. 


The Iron Bridge Project will be operated by IB Operations Pty Ltd, as agent for the Iron Bridge Joint Venture between FMG Magnetite Pty Ltd and Formosa Steel IB Pty Ltd.  IB Operations Pty Ltd is an Australian private company, which is owned by FMG Magnetite Pty Ltd and Formosa Steel IB Pty Ltd, each a participant in the unincorporated Iron Bridge Joint Venture.


Local and Indigenous participation:


In line with Fortescue’s commitment to supporting local Western Australian communities, requirements relating to the engagement of local and Indigenous vendors will be included in the selection criteria for the Iron Bridge Magnetite Project tendering opportunities.

SHOW LESS

Associated Opportunities


SHOW MORE

Work Packages


To submit an expression of interest, select the icon next to the work package scope you are interested in.
Note: The closing date/s for expressions of interest shown below are subject to change.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Dart Valves29 Jul 1919 Aug 1919 Aug 19
Please refer to scope of work for further details pertaining to this package.
Agitators31 Jul 1921 Aug 1921 Aug 19
Please refer to scope of work for further details pertaining to this package.
Polishing Filters1 Aug 1922 Aug 1922 Aug 19
Please refer to scope of work for further details pertaining to this package.
Slurry Samplers2 Aug 1923 Aug 1923 Aug 19
Please refer to the scope of works document for details of the package
LV Variable Speed Drives - Field Mounted5 Aug 1926 Aug 1926 Aug 19
Please refer to scope of work for further details pertaining to this package.
Coagulant Plant5 Aug 1927 Aug 1927 Aug 19
Please refer to the scope of works document for details of the package
Flocculant Plant5 Aug 1927 Aug 1927 Aug 19
Please refer to the scope of works document for details of the package
Bulk Earthworks - PORT7 Aug 1928 Aug 1928 Aug 19
Please refer to scope of work for further details pertaining to this package.
Static Trash Screens7 Aug 1928 Aug 1928 Aug 19
Please refer to scope of work for further details pertaining to this package.
Water Supply - Local Borefield Development7 Aug 1928 Aug 1928 Aug 19
Please refer to the scope of work for further details pertaining to this package.
Water Tanks7 Aug 1928 Aug 1928 Aug 19
Please refer to scope of work for further details pertaining to this package.
Compressed Air System8 Aug 1929 Aug 1929 Aug 19
Please refer to scope of work for further details pertaining to this package.
Fire Water Pumps8 Aug 1929 Aug 1929 Aug 19
Please refer to scope of work for further details pertaining to this package.
Steel Tanks9 Aug 1930 Aug 1930 Aug 19
Please refer to scope of work pertaining to this package.
Car Hire13 Aug 193 Sep 193 Sep 19
Please refer to scope of works for further details pertaining to this package
Dam Pumps13 Aug 193 Sep 193 Sep 19
Please refer to scope of work for further details pertaining to this package.
LV Motors16 Aug 196 Sep 196 Sep 19
Please review the scope of works documents for details of the package.
LV VSD Switchroom Mounted16 Aug 196 Sep 196 Sep 19
Please refer to scope of works for further information pertaining to this package.
Bulk Earthworks - Access Roads and Infrastructure3 Apr 1924 Apr 1924 Apr 19
Please refer to scope of works document for details on the scope of works
GEOTECHNICAL SERVICES5 Apr 1926 Apr 1926 Apr 19
please refer to the scope of works document for details of the package
Mine Fleet5 Apr 1926 Apr 1926 Apr 19
Please refer to the scope of works for details of the package package
Airport11 Apr 192 May 192 May 19
Please review the scope of works document for details of the package.
High Pressure Grinding Rollers11 Apr 192 May 192 May 19
Please review the scope of works for details of the package.
Operations Camp18 Apr 199 May 199 May 19
please refer to the scope of works document for details of the package
Regrind Mills26 Apr 1917 May 1917 May 19
Please review the scope of works document for details of the package.
Air Classifier1 May 1922 May 1922 May 19
Please review the scope of works document for details of the package.
Bridge Reclaimer1 May 1922 May 1922 May 19
Please review the scope of works document for details of the package.
Coarse Ore Stockpile Radial Stacker1 May 1922 May 1922 May 19
Please review the scope of works document for details of the package.
Cone Crushers1 May 1922 May 1922 May 19
Please review the scope of works document for details of the package.
Dry Rejects Conveying System1 May 1922 May 1922 May 19
Please review the scope of works document for details of the package.
Gyratory Crushers1 May 1922 May 1922 May 19
Please review the scope of works document for details of the package.
Product Baghouse1 May 1922 May 1922 May 19
Please review the scope of works document for details of the package.
Concentrate Belt Filters7 May 1928 May 1928 May 19
Please refer to the scope of works for details of the package
Steel Thickeners7 May 1928 May 1928 May 19
Please refer to the scope of works document for details of the package
Water Pumps7 May 1928 May 1928 May 19
Please refer to the scope of works for details of the package
Concrete Thickeners7 May 1928 May 1929 May 19
Please refer to the scope of works document for details on the package
Survey and Set Out9 May 1931 May 1931 May 19
Please refer to scope of works for further details of the package.
Dry Magnetic Separators14 May 195 Jun 195 Jun 19
Please refer to scope of works for further details.
Dust Collection Systems14 May 195 Jun 195 Jun 19
Please refer to scope of works for further details on package.
PROCESS PLANT CONSTRUCTION21 May 1911 Jun 1911 Jun 19
Please refer to the scope of works for details of the package
Canning Basin Bore Hole Drilling21 May 1914 Jun 1914 Jun 19
Please refer to the scope of works for further details on this package.
Tertiary Grinding Wet Screening24 May 1917 Jun 1917 Jun 19
Please refer to scope of works for further details pertaining to the work.
Dewatering Drums28 May 1919 Jun 1919 Jun 19
Please refer to the scope of work for further details pertaining to the package.
Positive Displacement Pumps29 May 1919 Jun 1919 Jun 19
Please refer to scope of work for further details pertaining to this package.
Wet Magnetic Separators28 May 1919 Jun 1919 Jun 19
Please refer to scope of works for further details pertaining to this package.
Slurry Process Sump Pumps7 Jun 1928 Jun 1928 Jun 19
Please refer to scope of works for further details pertaining to this package.
Vibrating Screens10 Jun 191 Jul 191 Jul 19
Please refer to scope of works for further details pertaining to this package.
Apron Feeders24 Jun 1915 Jul 1915 Jul 19
Please refer to the scope of works for details of the package
Bulk Earthworks Detailed Earthworks and Concrete for the Roads Processing Plant and Infrastructure27 Jun 1919 Jul 1919 Jul 19
Please refer to the scope of works for further information pertaining to the package.
Bulk Earthworks Tailings Storage Facility27 Jun 1919 Jul 1919 Jul 19
Please refer to the scope of works document for details of the package
Demagnetizing Coils28 Jun 1919 Jul 1919 Jul 19
please refer to teh scope of works document for details of teh package
MV/HV Variable Speed Drives4 Jul 1925 Jul 1925 Jul 19
Please refer to scope of works for further information pertaining to this work.
Pipelines Basic and Detailed Design4 Jul 1925 Jul 1925 Jul 19
Please refer to scope of work for further details pertaining to this package.
Hydro-Separation Tanks5 Jul 1926 Jul 1926 Jul 19
Please refer to scope of works for further details on this package.
Construction Water Supply18 Jul 198 Aug 198 Aug 19
Please refer to scope of work for further details pertaining to this work.
WASTE WATER TREATMENT PLANT17 Jul 198 Aug 198 Aug 19
Please refer to scope of work for further details pertaining to this package.
Water Treatment Plant17 Jul 198 Aug 198 Aug 19
Please refer to scope of work for further details pertaining to this package.
Belt Feeders22 Jul 1912 Aug 1912 Aug 19
Please refer to scope of work for further details pertaining to this package.
Hydrocyclones22 Jul 1912 Aug 1912 Aug 19
Please refer to scope of work for further details pertaining to this package.
Explosives Supply and Services25 Jul 1915 Aug 1915 Aug 19
Please refer to scope of work for further information pertaining to this package.
Waste Management26 Jul 1916 Aug 1916 Aug 19
Please refer to scope of work for further details on this package.