STATUS
|
|
▲ CONTRACT
|
OPENS
|
FULL SCOPE CLOSES
|
PARTIAL SCOPE CLOSES
|
DOCS
|
FULL SCOPE EOI
|
PARTIAL SCOPE EOI
|
| | CCTV- Intruder Detection and Site Access Control | 15 Feb 2019 | 14 Apr 2020 | 14 Apr 2020 |
| | |
| Engineering, Supply, Installation and Commissioning not including temporary CCTV or Security. |
| | Curbs and Site Walks Works | 15 Feb 2019 | 14 May 2020 | 14 May 2020 |
| | |
| Subcontract for the urbanisation of the site; comprising of the construction of curbing and paths. |
| | Piling Works (018) | 28 Nov 2018 | 12 Dec 2018 | 12 Dec 2018 |
| |
| Piling Works including, but not limited to, design, supply, manufacturing, execution, plan, all management, supervision, engineering, technical support, labor, materials, transport, plant and equipment for the Piling works.
*Please also refer to scope of work for further details pertaining to this package. |
| | Earthworks | 17 Dec 2018 | 07 Jan 2019 | 07 Jan 2019 |
| |
| Earth movements required for the Site arrangement previous to any civil and piling works. Including but not limited to excavation works in the bunker area, ponds area and gravel filling. Scope to also include loading & management of excavated material, hauling and disposal to a stockpile on site and to a dump site. |
| | Fire Fighting Systems (FFS) | 17 Dec 2018 | 07 Jan 2019 | 07 Jan 2019 |
| |
| Supply, testing, delivery and installation of the Fire Fighting System. |
| | Refuse Crane System | 17 Dec 2018 | 07 Jan 2019 | 07 Jan 2019 |
| |
| Supply, testing, delivery and Assembly of Refuse Crane System. |
| | Deaerator and Feed Water Tanks | 29 Dec 2018 | 18 Jan 2019 | 18 Jan 2019 |
| |
| Supply, delivery and testing of Deaerator & FeedWater Tanks. |
| | Condensate Pumps | 02 Jan 2019 | 23 Jan 2019 | 23 Jan 2019 |
| |
| Supply, testing and delivery of Condensate Pumps. |
| | Stack Structure Works | 15 Feb 2019 | 27 Feb 2019 | 27 Feb 2019 |
| |
| Design and Construct (D&C) of the flue-gas stack. |
| | Mechanical Works - Fire Systems | 15 Feb 2019 | 02 Mar 2019 | 02 Mar 2019 |
| |
| Engineering, supply, installation and commissioning of wet fire systems, including fire water tanks. |
| | Oily Water Separators | 23 Jan 2019 | 15 Mar 2019 | 15 Mar 2019 |
| |
| Supply, testing, delivery and assembly of the Oily Water Separators. |
| | Aerobic Treatment Unit (ATU) | 22 Jan 2019 | 12 Apr 2019 | 12 Apr 2019 |
| |
| Supply, testing, delivery and Assembly of the Aerobic Treatment Unit (ATU). |
| | Chemical Dosing System | 22 Jan 2019 | 12 Apr 2019 | 12 Apr 2019 |
| |
| Supply, testing, delivery and installation of the Chemical Dosing System. |
| | Deodorization System | 23 Jan 2019 | 13 Apr 2019 | 13 Apr 2019 |
| |
| Supply, testing, delivery and installation of the Deodorization System. |
| | Natural Gas Regulation System | 23 Jan 2019 | 13 Apr 2019 | 13 Apr 2019 |
| |
| Supply, testing, delivery and Installation of the Natural Gas Regulation System. |
| | Water Treatment Plant | 23 Jan 2019 | 13 Apr 2019 | 13 Apr 2019 |
| |
| Supply, testing, delivery and assembly of the Water Treatment Plant. |
| | Civil - Main Building Foundations and Concrete Structures | 15 Feb 2019 | 16 Apr 2019 | 16 Apr 2019 |
| |
| Including in ground engineering services, foundations (including detailed excavation and backfill) and concrete structures for Boiler, Bunker, Reception Hall, Electrical Building. |
| | HAZOP Study | 23 Jan 2019 | 16 Apr 2019 | 16 Apr 2019 |
| |
| Development and delivery of the HAZOP study for the project. |
| | Feedwater Pumps | 23 Jan 2019 | 25 Apr 2019 | 25 Apr 2019 |
| |
| Supply, testing and delivery of Feedwater Pumps. |
| | Civil Works | 22 Jan 2019 | 01 May 2019 | 01 May 2019 |
| |
| Civil works required as per Technical Specifications. This works may include concrete supply, steel reinforcement, formwork and climbing formwork. |
| | Lift | 23 Jan 2019 | 01 May 2019 | 01 May 2019 |
| |
| Supply, testing, delivery and Assembly of Lift(s). |
| | Emergency Diesel Generator | 23 Jan 2019 | 02 May 2019 | 02 May 2019 |
| |
| Supply and Testing of the Emergency Diesel Generator. |
| | Electrical Works - Underground Earthing System | 15 Feb 2019 | 08 May 2019 | 08 May 2019 |
| |
| Scope is for Supply, Installation and Commissioning of Underground Earthing systems. |
| | Electrical Works - DC System | 15 Feb 2019 | 16 May 2019 | 16 May 2019 |
| |
| Engineering, Supply, Installation and Commissioning of DCS Systems including:
*Engineering, supply, installation and commissioning of all active equipment (including network equipment as required for their systems) but not data cabling between comms cabinets and consolidation points (field patching panels);
*supply and install their own patch leads within comms cabinets between the comms racks and their active equipment;
*all active controls equipment on POE; and
*detailing the points lists and in spatially determining the location of field devices during design and not during construction. |
| | On Site Tanks | 23 Jan 2019 | 17 May 2019 | 17 May 2019 |
| |
| Supply of material, delivery, assembly and testing on site of:
- Demi water tank
- Raw water
The scope includes any machinery and equipment necessary for the correct development of the scope and its removal out of the site after the works. |
| | HVAC System | 23 Jan 2019 | 24 May 2019 | 24 May 2019 |
| |
| See Attached Scope of Work |
| | Auxiliary Horizontal/Vertical Pumps | 22 Jan 2019 | 05 Jun 2019 | 04 Jun 2019 |
| |
| Supply, testing and delivery of Auxiliary Horizontal / Vertical Pumps including:
. Makeup Pumps
. Demi Water Pumps
. Drain Pumps
. Service Water Pump |
| | HVAC - Supply and Installation | 15 Feb 2019 | 07 Jun 2019 | 07 Jun 2019 |
| |
| Engineering, supply, installation and commissioning of the main Facility domestic HVAC systems.
Please note, this excludes the Administration Building as this is included in the Architecture - Admin Building Refurbishment package. |
| | Weighbridges | 07 Jun 2019 | 19 Jun 2019 | 19 Jun 2019 |
| |
| Please refer to the scope of works document for details of the package |
| | Mechanical Works | 23 Jan 2019 | 01 Jul 2019 | 01 Jul 2019 |
| |
| Mechanical Works for pipe assembly, including but not limited to fittings, valves and accessories for the entire power block. |
| | Mechanical Works - Boiler Installation | 15 Feb 2019 | 02 Jul 2019 | 02 Jul 2019 |
| |
| All erection and installation works including receipt and care of all Acciona supplied plant, equipment and materials and engineering, supply and installation of associated BOP and & pre-commissioning of the package works. |
| | Mechanical Works - Boiler Pipework | 15 Feb 2019 | 02 Jul 2019 | 02 Jul 2019 |
| |
| Supply and installation of boiler and pipework thermal insulation, lagging and associated cladding and sheathing. |
| | Workshop Tanks | 23 Jan 2019 | 17 Jul 2019 | 17 Jul 2019 |
| |
| Supply, delivery and testing ofWorkshop Tanks, including but not limited to:
- Closed Cooling Expansion Vessel
- Boiler Drain-Down Tank
- Steam Turbine External Drain Tank
- ReuseWater Elevated Tank
- Diesel Storage Tank
- Condenser Tank (If not included in ACC Supply) |
| | Dumping Doors | 12 Jul 2019 | 22 Jul 2019 | 22 Jul 2019 |
| |
| Please refer to scope of work for further details pertaining to this work. |
| | Structural Works | 15 Feb 2019 | 19 Aug 2019 | 19 Aug 2019 |
| |
| Supply, Fabrication and Erection of steel structure for the whole structure including, but not limited to, the bunker, reception hall, turbine room and electrical sectors including secondary steel framing for external wall and roof cladding, racks, steam turbine cladding and roof. |
| | Minor Hoists and Jib Cranes | 15 Feb 2019 | 20 Aug 2019 | 20 Aug 2019 |
| |
| Engineering, supply, installation and commissioning of the Minor Hoists and Jib Cranes. |
| | Architecture - Main Building Works | 15 Feb 2019 | 10 Oct 2019 | 10 Oct 2019 |
| |
| Subcontract for the remaining architectural works of the plant. |
| | Mechanical Works - Environmental Systems | 15 Feb 2019 | 06 Nov 2019 | 06 Nov 2019 |
| |
| All erection and installation works including engineering, supply and installation of all Environmental Systems including, but not limited to:
Ductwork and duct supports; and
Receipt, care, installation and commissioning of Acciona supplied plant and equipment:
Compressed Air Generation System
Filter systems
Air sampling system(s)
Stack Associated Mechanical Systems |
| | Mechanical Works - Turbine Installation | 15 Feb 2019 | 07 Nov 2019 | 07 Nov 2019 |
| |
| All erection and installation works including receipt and care of all Acciona supplied plant, equipment and materials and engineering, supply and installation of associated BOP and & pre-commissioning of the package works. |
| | Substation -Trafo-GIS- Civil and Builders Works | 15 Feb 2019 | 13 Nov 2019 | 13 Nov 2019 |
| |
| Construct only Subcontract for the Substation works. |
| | Architecture - Admin Building Bridge and Lift | 15 Feb 2019 | 20 Nov 2019 | 20 Nov 2019 |
| |
| Subcontract for the architectural works for the final Administration Building refurbishment, including (but not limited to); bridge interfaces, lift at the east end of the building and any final making good prior to completion and COD. |
| | Civil - General | 15 Feb 2019 | 21 Nov 2019 | 21 Nov 2019 |
| |
| Civil works related in Weigh Bridge, access control and CCTV works. |
| | Electrical Works - General | 15 Feb 2019 | 03 Feb 2020 | 03 Feb 2020 |
| |
| Scope is for Supply, Installation and Commissioning of LV systems generally including, but not limited to: Lighting & Small Loads Materials, Lighting & Small Loads Panel board & LV/LV Transformers, Junction Boxes
Lightning Protection System, Low Voltage Cables, I&C Cables, UPS System, Telephony And Data System
Public Address System, Aerial Earthing System. |
| | Mechanical Works - General | 15 Feb 2019 | 03 Feb 2020 | 03 Feb 2020 |
| |
| Engineering, supply and installation of BOP and & pre-commissioning of mechanical works not included in MEC.1 to MEC.4. and receipt and care of all Acciona supplied plant, equipment and materials. |
| | Mechanical Works - ACC Installation | 15 Feb 2019 | 07 Feb 2020 | 07 Feb 2020 |
| |
| All erection and installation works including receipt and care of all Acciona supplied plant, equipment and materials and engineering, supply and installation of associated BOP and & pre-commissioning of the package works. |
| | Kwinana Waste-to-Energy Project - Any Opportunities | 16 Nov 2018 | 16 Dec 2019 | | 
| |
| Express interest for any opportunities that may arise for this project. |