BHP Brownfield Expansion (BFX) Project



Contact Details


  Eddie Ivar, ICN SA
  (08) 8429 3376
 CONTACT EMAIL

  Merril Kirk
  (08) 8429 2992
 CONTACT EMAIL

  Locations: SA Australia
  Project Status: Selection Phase Study (SPS) currently. Definition Phase Study (DPS) or Feasibility Stage in 2019.
  Project Owner BHP Olympic Dam Corporation Pty Ltd (BHP)

Project Details


Project Details

BHP Olympic Dam (OD, the Company) is a fully-integrated mining and mineral processing operation, owned by the BHP Group through its wholly owned subsidiary BHP Billiton Olympic Dam Corporation Pty Ltd.

Productivity initiatives have been implemented over the last two years at Olympic Dam however further work is required to ensure it is a globally competitive, world-class operation.

In order to achieve this, a Brownfield Expansion (BFX) project is being evaluated to develop the mine and processing plant to increase production and lower operating cost.

OD has historically operated in the Northern Mine Area (NMA) since operations commenced in the 1980s.  The OD mine plan is now extending into the previously unexploited Southern Mine Area (SMA).

The proposed BFX Project (the Project) is to deliver a brownfield expansion of its underground and surface operations to deliver increased throughput of the existing plant and increasing overall copper production capacity.  The Project is currently finalising its pre-feasibility (or SPS) and is planned to transition into ‘feasibility’ (or DPS) later in 2019. 

Scope Overview

The scope as it is currently defined in ‘pre-feasibility’ (or SPS) includes the following:

  • Expanded footprint in the SMA to access more and higher grade ore
  • Expansion of the existing surface processing facilities including:

            -   Installation of an additional grinding mill

            -   Expanded smelting facility and supporting plant

            -   Expansion of existing refinery complex 

  • Installation of additional water supply and accommodation infrastructure
  • Provision of all associated:

            -   Project management (if required)

            -   Definition and detailed design required to deliver scope items (if required)

            -   Temporary/enabling works (if required)

            -   Installation

            -   Commissioning

The Project will complete definition and detailed design during the DPS, which will only commence after successful completion of the current SPS.

Indicative Timeline

Pre-feasibility or SPS completed FY2019

Feasibility or DPS design commencing FY2020

Final investment decision FY2021

Main construction and commissioning works FY2021 to FY2024.

Disclaimer

The proposed Project is currently completing a selection phase or ‘pre-feasibility’ study and is subject to a number of approvals. Accordingly, the scope descriptions, timelines and values stated in this project description are indicative only and subject to change.


SHOW LESS

Work Packages


There are currently no open work packages for this project.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS   EPCM & PMC    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
BFX057a Engineering Procurement and Construction Management Services Contract for Surface Works29 Oct 1830 Nov 1830 Nov 18
BHP is seeking expressions of interest (EOI) from contractors capable of providing complete Engineering, Procurement and Construction Management services to deliver the required process plant upgrade and surface infrastructure works, acting as a limited agent for BHP.
Please download the attached document for further information.
BFX057b Project Management Consultancy Contract for Underground Works29 Oct 1830 Nov 1830 Nov 18
BHP is seeking expressions of interest (EOI) from contractors to manage the delivery of the scope for declines, materials handling, mining equipment, mine services and mine infrastructure involved in the BFX Project's underground scope.
See attached document for further detail.
STATUS   GENERAL    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
BFX-SPS-028 Geotechnical Investigation 

BHP is seeking expressions of interest (EOI) from contractors capable of providing\ngeotechnical engineering services including remote onsite drilling and coring,\nlaboratory testing of soil and rock samples and the provision of an interpretative\ngeotechnical report based on results from laboratory testing.\nSee attached document for further details.
BFX-SPS-081 Pastoral Water Infrastructure Survey 

BHP is seeking expressions of interest (EOI) for suitable qualified professionals to conduct a mapping survey on the pastoral stations surrounding the Wellfield B (in the Marree region of South Australia).
BFX-SPS-090 Deleterious Elements Laboratory Analysis  

BHP is seeking expressions of interest (EOI) from contractors capable of undertaking elemental analysis work from samples collected from the OD site. Samples will be collected by BHP site personnel and delivered to contractor's appointed laboratory location. Result from these analyses will feed into site models and the models will be tuned to accurately predict minor element concentrations in different copper streams for future BFX operation.
Details on your organisational capacity, capability, and experience in delivering such services safely will be used to form a shortlist for tender.
See attached document for further details.
BFX-SPS-099 Independent Peer Review of Power and Electrical Infrastructure Scope 

BHP is seeking expressions of interest (EOI) from contractors capable of providing a 'desk-top' Independent Peer Review (IPR) of the deliverables of a Brownfield Expansion Project (BFX), Engineering Contractor's (EC) 'Power and Electrical Infrastructure' scope of work. The IPR will review the technical compliance of the engineering and value-add through sharing of knowledge and experience.
See attached document for further detail.
BFX-SPS-127 Electro-Refinery Dynamic Model 

BHP is seeking expressions of interest (EOI) from contractors capable of providing modelling services to create a detailed (to individual machine movements level) dynamic model of the Electro-Refinery process. The dynamic model will be used to identify constraints within the process.
See attached document for further details.
BFX-SPS-150 Independent Peer Review of Water Infrastructure Scope 

BHP is seeking expressions of interest from contractors capable of providing a 'desk-top' Independent Peer Review of the deliverables of a Brownfield Expansion Project, Engineering Contractor's 'Primary Water Supply System' scope of work.

See attached document for further details.
BFX-SPS-152 Grinding Circuit Modelling/Simulations 

BHP is seeking expressions of interest from contractors capable of completing detailed data analysis and simulations of the Olympic Dam comminution circuit with a view to selecting the optimal circuit configuration for the expanded plant.

See attached document for further details.
BFX-SPS-153 Flotation Testing Services  

BHP is seeking expressions of interest (EOI) from contractors capable of completing flotation testing for Jameson Cell, and column flotation at laboratory scale.

See attached document for further details.
BFX-SPS-097 and BFX-SPS-098 Water Package 1 and 2 Combined Engineering Services6 Sep 1816 Sep 18 
BHP is seeking expressions of interest (EOI) from contractors capable of completing detailed engineering and construction study works for the following scopes, on an individual or combined basis:\n1. Alternate Site Water (Mine Dewatering & Tails Dam Bores)\n2. Upgrade process Water & Potable water Pond Pump stations\n3. M6 replacement pipeline\n4. 22ML/Day Desalination Plant\n5. 100ML Process Water Dam\n6. 85ML Potable Water Dam\n\nSee attached document for further details.
BFX-SPS-043 Ecological Survey including rangelands vegetation assessment11 Sep 1821 Sep 18 
BHP is seeking expressions of interest (EOI) for suitable qualified professionals to conduct an ecological survey, including a rangeland vegetation assessment in the Stony Plains and Simpson-Strzelecki Dunefields IBRA regions.

See attached document for further details.
BFX-SPS-078 Bismuth / Antimony Removal System8 Aug 1818 Aug 18 
BHP is seeking expressions of interest (EOI) from contractors capable of providing
the service of providing a full scale operating bismuth and antimony removal
system. This is an opportunity for such companies to operate a Bismuth Antimony
Removal system (BARS) pilot plant on the OD remote site, perform laboratory
testing (preferably using atomic absorption spectrophotometry), and the provision
of an interpretative report based on these results.
See attached document for further details.
BFX-SPS-080 Primary Water Supply Survey3 Sep 1813 Sep 18 
BHP is seeking expressions of interest (EOI) from contractors capable of providing detail ground surveys in remote areas for the following scopes, on an individual or combined basis:
1. GAB54 Pipe Line Alignment
2. M6 Pipe Line Replacement
3. M6C Pipe Line Duplication
4. M1C Pipe Line Duplication
5. Detailed Ground Survey Locations

See attached document for further details.
BFX-SPS-082 BFX Asset Management Program and Master Data 10 Aug 1820 Aug 18 
BHP is seeking expressions of interest (EOI) from qualified Companies to develop asset management programs and associated Master Data load sheets based on project Preliminary Equipment Lists.
See attached document for further details.
BFX-SPS-083 Site Test Work - Reaction Shaft Sampling and Jacket Cooling Water Survey6 Sep 1816 Sep 18 
BHP is seeking expressions of interest (EOI) from contractors capable of providing both of the following services at OD remote site:

- Undertaking sampling campaign and analysis on the samples collected for the Reaction Shaft (RS), and
- Conducting assessment of actual heat distribution of the Direct to Blister Copper Flash Furnace (DBF) by conducting a detailed Cooling Jacket Water survey.

See attached document for further details.
BFX-SPS-093 Site Survey - Hygiene System Review20 Aug 1830 Aug 18 
BHP is seeking expressions of interest (EOI) from contractors capable of providing the service of surveying hygiene (offgas) system on OD remote site. This is an opportunity for such companies to complete volumetric gas flows and pressures measurement at various duct locations identified, and the provision of an interpretative report based on these results. This would enable BHP to complete overall hygiene system flow balance and confirm if any upgrades are required on the existing ducting system to achieve the total hygiene flow required in the BFX project.
Details on your organisational capacity, capability, and experience in delivering such services safely will be used to form a shortlist for tender.

See attached document for further details.
BFX-SPS-094 Integrated Instrumentation and Control6 Nov 1816 Nov 18 
BHP is seeking expressions of interest (EOI) from contractors capable of performing a trade-off study to identify the appropriate Process Control System(s) (PCS) to be implemented as part of the BFX project. See attached document for further information.
BFX-SPS-100 Power Combined Engineering Services24 Aug 183 Sep 18 
BHP is seeking expressions of interest (EOI) from Engineering Contractors capable of completing detailed engineering study works for the following scopes, on an individual or combined basis:
(1) ETAP Power System Model Development and Analysis.
(2) Power Demand Profile and AMD Steps Determination.
(3) Trade-off Study: OD West Fourth 275/132kV Transformer.
(4) Trade-off Study: OD West 132kV Gas Insulated Switchgear.

See attached document for further detail.
BFX-SPS-101 Power Combined Engineering Services (Technical Specifications)27 Aug 186 Sep 18 
The BFX Project will deliver a brown field expansion of the Olympic Dam underground and surface operations to deliver increased throughput of the existing plant and increasing overall copper production capacity. Specification, tendering and early procurement of major items of \\\'electrical equipment\\\' is required to meet the expected power demand of the BFX project.\\nSee attached document for further details.
BFX-SPS-136 and BFX-SPS-139 Combined Assessment of Transport and Logistics (Materials and People)12 Sep 1822 Sep 18 
BHP is seeking expressions of interest (EOI) from contractors capable of providing services to evaluate the existing capacities and develop any requirements identified to cater for the BFX for;

BFX136 - Material Transport & Logistics chain assessment including:
. On-site product terminals
. Off-site product terminals
. Supply/warehousing

BFX139 - People Transport & Logistics chain assessment including:
. Olympic Dam Airport - Landside Facilities
. Permanent Accommodation and Facilities
. Civil Earthworks & Roads

See attached document for further details.
BFX-SPS-167 Waste and Low Grade Dump Design Study including Acid Mine Drainage29 Oct 189 Nov 18 
BHP is seeking expressions of interest (EOI) from contractors capable of providing the design of surface storage facilities (waste dumps and low grade stockpiles) for underground waste rock and low grade ore. See attached document for further details.
BFX085/BFX103/BFX087 Engineering Services Combined Packages10 Aug 1820 Aug 18 
BHP is seeking expressions of interest (EOI) from contractors capable of completing detailed engineering and construction study works for the following scopes, on an individual or combined basis:
- BFX SPS 085 Precious Metal Refinery (Gold PMR) Capacity Assessment
- BFX SPS 103 Engineering Review of Surface Facilities (Updated Mine Plan)
- BFX SPS 087 Modularisation & Prefabrication Review

See attached document for further details.
BFX138/BFX141/BFX142/BFX145 Combined Assessment of Non-process Infrastructure packages17 Sep 1827 Sep 18 
BHP is seeking expressions of interest from contractors capable of providing services to study and develop any requirements identified to cater for the BFX for:
BFX 142 - Temporary Construction Facilities including
BFX 145 - Solids and Liquids disposal
BFX 141 - LPG Bullet
BFX 138 - Compressed air & potable water

See attached document for further detail.