Regional Rail Project – Bombardier Consortium Tender



Contact Details


  Ian Hudson
  (02) 6360 8422
CONTACT EMAIL

  Locations: NSW Australia
  Project Value: TBA
  Project Status: Bid phase
  Project Owner Bombardier Transportation Australia

Project Details


Background

A new regional NSW rollingstock fleet will replace the ageing XPT, XPLORER and Endeavour regional trains for passengers who travel between Sydney, Canberra, Melbourne, Brisbane and major regional centres. The Regional Rail Project encompasses design and manufacture of the New Fleet, design and construction of a new maintenance facility in Dubbo (subject to approval) and ongoing asset management for the New Fleet and associated facilities.

Key benefits

  • Fast-track the delivery of safe, reliable, comfortable and accessible regional trains
  • Create a better, more reliable service for customers travelling long distances
  • Boost regional jobs with the maintenance of these new trains in regional NSW

The Opportunity

A consortium comprising Bombardier Transportation, John Laing and Macquarie is engaged in a procurement process with Transport for NSW, to build the trains and complete them in Dubbo in a facility to be constructed by Degnan and Martinus Rail. Once in service, the regional train fleet will be maintained in the new purpose-built Dubbo Maintenance Facility and the pre-existing Sydenham facility for whole of life.

The Bombardier-led consortium is seeking qualified and experienced suppliers to express interest for relevant trade packages and supply opportunities. The work packages below are open to all ANZ businesses to register but preference will be given to Regional NSW SMEs (Small and Medium Enterprises) when it makes sense to do so.

The Bombardier consortium and Transport for NSW are committed to leveraging employment and community benefits from the Regional Rail project. Regional career and skills development opportunities will emanate from deliberate actions that focus on training, up-skilling and employing local people, especially where disadvantaged groups can be targeted. The entire supply chain will participate and be supported by the consortium to achieve the State’s objective to stimulate regional economies through jobs and skills development.


How to register an Expression of Interest

  • Work Packages currently available to submit an EOI for are listed below.
  • To submit an initial EOI for the Work Scopes, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.

 

ICN Gateway Company Registration

  • Click here to register your company profile on ICN Gateway.
  • Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI- please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

 

SHOW LESS

Work Packages


There are currently no open work packages for this project.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS   MAINTENANCE FACILITY CONSTRUCTION    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Building Shell - Materials22 Mar 1819 Apr 18 
Precast slab, precast bridge beams, quarry materials, metal roofing, structural steel, windows etc.
Building Shell - Services22 Mar 1819 Apr 18 
Concrete form and place, roofing, cranage etc.
Depot Fitout - Materials22 Mar 1819 Apr 18 
Water treatment, crane gantry, insulation, evaporative air cooler etc.
Depot Fitout Services22 Mar 1819 Apr 18 
Air line installation, plumbing, electrical fitting, HVAC etc.
Office Fitout - Materials22 Mar 1819 Apr 18 
Plasterboard, plumbing supplies, electrical supplies, air-conditioning etc.
Office Fitout - Services22 Mar 1819 Apr 18 
Plaster-boarding, plumbing, electrical fitting, HVAC etc.
Rail Infrastructure - Parts22 Mar 1819 Apr 18 
Turnouts, jewellery, concrete sleepers, signals etc.
Rail Infrastructure - Services22 Mar 1819 Apr 18 
Transport, layout, welding, fitting etc.
STATUS   ROLLING STOCK COMPLETION WORKS    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Carriage - Exterior22 Mar 1819 Apr 18 
Livery, windows, variable signage, gangways, doors etc.
Carriage - Interior22 Mar 1819 Apr 18 
Seats, carpet, lights, curtains, electronic signage, WiFi, charging points, etc.
Operations fitout22 Mar 1819 Apr 18 
Cab seats, emergency communications etc.
Passenger services22 Mar 1819 Apr 18 
Galley, water fonts, toilets, basins etc.
Undercarriage Parts22 Mar 1819 Apr 18 
Wheels, bogies, suspension, axles etc.
STATUS   ROLLING STOCK MAINTENANCE    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Cleaning22 Mar 1819 Apr 18 
Changeover clean, graffiti removal, exterior washing etc.
Diesel services22 Mar 1819 Apr 18 
Onsite, breakdown, rebuild etc.
Electrical services22 Mar 1819 Apr 18 
Onsite, breakdown, rebuild etc.