Regional Rail Project



Contact Details


  Dusko Bajic
  (04) 1732 3636
CONTACT EMAIL

  Locations: NSW Australia
  Project Value: TBA
  Project Status: Shortlisted Applicant to Provide a Proposal
  Project Owner TRANSPORT FOR NSW

Project Details


Project Details

In August 2017, the NSW Government announced it would replace all trains operating on the regional network, including 60 XPTs and more than 50 XPLORER and Endeavour passenger cars. A new Maintenance Facility for these trains will also be built in regional NSW. Further information on the project is available at: https://www.transport.nsw.gov.au/projects/current-projects/regional-rail


About UGL

UGL Rail Services (UGL) is Australia's leading provider of rail technology for mainline, metropolitan and light rail transport systems. Our complete offering covers the entire spectrum of rail transportation products and services in design, engineering, manufacture, construction, maintenance, refurbishment and asset management of locomotives, trains and rail infrastructure systems.


UGL is a member of shortlisted consortium Momentum Trains, which is providing a proposal for the Regional Rail Project. If successful, once construction of the Maintenance Facility is complete, UGL will manage the Facility and the in-service requirements for the trains.


The Project

The Regional Rail Project will be to replace the current regional rail fleet and maintain the new fleet in Regional NSW, with Dubbo the preferred location (subject to planning approval).


Contract award is expected to be early 2019 and delivery of the trains is expected to be in the early 2020s.


Under the Request for Proposal, UGL are reviewing opportunities for the potential future engagement of small to medium Australian and New Zealand suppliers (ANZ SMEs) to support the Project.


As part of this Project, UGL have Industry Participation requirements and request details from interested parties to support the following points:

  • Does the interested party promote Diversity and Inclusion in the workforce? Please provide information to support (e.g. number of female, indigenous workers)?
  • Engagement of young people – does the interested party have work experience programs, TAFE and graduate programs?
  • Work Force Skills Development – does the interested party have employee training programs and apprenticeships?

 

How to register an Expression of Interest

  • Work Packages currently available to submit an EOI for are listed below.
  • Please complete Attachment 1 - Supplier Survey and send to ugl@icnnsw.org.au 
  • To submit an initial EOI for the Work Scopes, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.

            This is an initial, generic EOI submission only. 

 

ICN Gateway Company Registration

  • Click here to register your company profile on ICN Gateway.
  • Support and assistance is available through the web links listed below.
  • Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI- please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

 

SHOW LESS

Work Packages


There are currently no open work packages for this project.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS   1. FACILITY CONSTRUCTION    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Building Works22 Mar 1820 Apr 18 
Workshops, administration, warehouse, etc
Civil Works22 Mar 1820 Apr 18 
Access roads, drainage, hardstand, etc
Compressed Air22 Mar 1820 Apr 18 
Supply and install compressed air station
Electrical Works22 Mar 1820 Apr 18 
Supply and install high and low voltage installations, lighting
Fuel Farm22 Mar 1820 Apr 18 
Supply and install a fuel farm (capacity TBA)
Professional Services22 Mar 1820 Apr 18 
Facility design, community relationship, environmental
Special Equipment22 Mar 1820 Apr 18 
Workshop cranes, shelvings,
Trackworks22 Mar 1820 Apr 18 
Access tracks, assembly tracks (in buildings), switches, signalling, inspection and commissioning
Waste Water Treatment22 Mar 1820 Apr 18 
Wastewater treatment plant supply and installation
STATUS   2. OPERATIONAL SERVICES    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Catering22 Mar 1820 Apr 18 
Provide catering service for employees
Clothing and Uniforms22 Mar 1820 Apr 18 
Provide clothing and uniforms for employees
Employee Services22 Mar 1820 Apr 18 
Provide various employee services
Facility Maintenance22 Mar 1820 Apr 18 
Painting, landscaping, plumbing, electrical, cleaning
Fuel and Oil 22 Mar 1820 Apr 18 
Supply fuel and oil for facility
General Consumables22 Mar 1820 Apr 18 
Provide general consumables
Hook and Pull Service22 Mar 1820 Apr 18 
Transport by rail of units from port to the facility
Labour Supply22 Mar 1820 Apr 18 
General labour hire
Port Service22 Mar 1820 Apr 18 
Unload train units from ships and store in port prior to transport to assembly facility.
Security22 Mar 1820 Apr 18 
Provide security service for train facility
Tools Calibration22 Mar 1820 Apr 18 
Provide tool calibration services
Train Components Overhaul and Maintenance22 Mar 1820 Apr 18 
Overhaul and maintenance of various train components
Waste Management22 Mar 1820 Apr 18 
Provide waste management service for trains and facility
STATUS   3. TRAIN MAINTENANCE    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Electrical Assembly22 Mar 1820 Apr 18 
Installation of electrical train components
General Hire22 Mar 1820 Apr 18 
Supply various equipment for hire
HVAC22 Mar 1820 Apr 18 
Installation of heating, ventilation and air conditioning systems
Mechanical Assembly22 Mar 1820 Apr 18 
Mechanical train assembly
PPE and Safety Equipment22 Mar 1820 Apr 18 
Supply of safety equipment
Tool Supply22 Mar 1820 Apr 18 
Tools required in the assembly process
Training 22 Mar 1820 Apr 18 
Upskilling of assembly workers and ongoing trainings
STATUS   4. TRAIN COMPONENTS SUPPLY    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Axles22 Mar 1820 Apr 18 
Standard gauge train axles
Batteries22 Mar 1820 Apr 18 
Train batteries supply
CCTV22 Mar 1820 Apr 18 
Supply and install CCTV systems
Fluid Storage22 Mar 1820 Apr 18 
Supply fuel, water, waste train storages
Safety Equipment22 Mar 1820 Apr 18 
Train safety equipment, fire extinguishers, etc
Train Appliances22 Mar 1820 Apr 18 
Train buffet ovens, microwaves, fridges, toilets,
Train Furnishings22 Mar 1820 Apr 18 
Supply windows, blinds, doors, floor coverings, handrails, grab handles, tables, panels, windscreens, passenger information displays, racks
Train Seats 22 Mar 1820 Apr 18 
Train driver and crew seats, passenger seats, frames, cushions, etc