Lincoln Gap Wind Farm



Contact Details


  Eddie Ivar, ICN SA
  (08) 8429 3376
 CONTACT EMAIL

  Locations: SA Australia
  Project Value: $450M – Stage 1
  Project Status: Under construction
  Project Owner NEXIF ENERGY AUSTRALIA PTY LTD

Project Details


The Lincoln Gap Wind Farm is a 212MW wind farm project comprising 59 wind turbines and a 10MW grid scale battery storage.

The wind farm is located near Port Augusta in South Australia.

The first 35 turbines installed will deliver 126 megawatts of clean, renewable energy to Australian consumers.  This stage of the project will be operational by the end of 2018 and fully completed in May 2019. 

When complete, the Lincoln Gap wind farm will produce enough energy to power 155,000 households in South Australia. 

The Lincoln Gap wind farm will feature the Senvion 3.6M140 EBC turbine, which will be the first from Senvion's three-megawatt range to be installed in Australia.

Senvion is the Principal Contractor for the EPC delivery of the project.

Senvion is working with Nexif Energy to maximise the opportunities for local businesses to support the delivery and operation of the wind farm.

Further information about the project is available here: www.lincolngapwindfarm.com.au


KEY DATES

Call for Expressions of Interest (closes Wednesday 28 February)

Senvion is looking for local businesses that can supply the following :

  • Cleaning and waste removal services
  • Fencing and landscaping services
  • Security services
  • Supply of materials for civil works
  • Survey and topographic services
  • Transportation
  • Cranage and installation of turbines


Engagement of contractors (mid March)

Senvion will engage suitable suppliers according to its standard  procurement processes.

SHOW LESS

Project Documents


Industry Briefing

  ▲ CONTRACT
Presentations from Industry Briefing 19 April 2017.
SHOW LESS

Work Packages


There are currently no open work packages for this project.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS   GENERAL TRADES    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Cleaning and waste removal services23 Jan 1828 Feb 18 
Senvion is looking for businesses that can provide cleaning and waste removal services on the wind farm site.
Cranage and installation services23 Jan 1828 Feb 18 
Senvion is looking for businesses that can provide cranage and installation services on the wind farm site.
Fencing and landscaping services23 Jan 1828 Feb 18 
Senvion is looking for businesses that can provide fencing and landscaping services on the wind farm site.
Security services23 Jan 1828 Feb 18 
Senvion is looking for businesses that can provide security services on the wind farm site.
Supply of materials for civil works23 Jan 1828 Feb 18 
Senvion is looking for businesses that can supply quality materials, and also provide haulage services.
Survey and topographic services23 Jan 1828 Feb 18 
Senvion is looking for businesses that can provide survey and topographic services on the wind farm site.
Transportation23 Jan 1828 Feb 18 
Senvion is looking for businesses that can provide light vehicle transport services to the project, including courier services.
STATUS   MISCELLANEOUS    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Other products or services23 Jan 1828 Feb 18 
Senvion is interested to hear from local businesses that can provide other goods and services to support delivery of the wind farm project.