Project Details


The electrification of the Gawler Rail Line will deliver faster, safer and more reliable rail services for the northern suburbs which will encourage more people to leave the car at home and take public transport.

On 18 January 2018, Lendlease were appointed as the contractor for the design and construction of the first stage between Adelaide and Salisbury.

Detailed design works will commence early this year, with electrification works anticipated to commence by the third quarter of 2018.

The project delivery model will adhere to the State Government’s policy requiring all steel to be sourced from Australian-standard certified fabricators and mills and the South Australian Industry Participation Policy which supports local jobs and local contractors.

The Adelaide to Salisbury works will support approximately 135 jobs a year during construction, while increasing capacity on one of Adelaide’s busiest rail lines.

Scope of Stage 1 works

  • Installation of the 25kV overhead wiring system including masts and gantries
  • Installation of a new signalling system
  • Installation of a new fibre optic communications system cable
  • Fencing works, vegetation trimming and removal and other works necessary to enable the electrification to proceed.

The Gawler Rail Electrification Project provides opportunities for business to being involved in the supply of the following products and services:

  • Overhead Wiring Elements
  • Civil Works
  • Pit and Cable Supply
  • Rail Protection Services
  • Electrical and Traction Power works
  • Concreting
  • Steel reinforcing
  • Piling
  • Trackworks
  • Structural Steel Fabrication
  • Bridge Screens
  • Fencing
  • Vegetation Removal and Arborist Services
  • Plant Hire
  • Labour Hire


Employment opportunities on the Gawler Rail Electrification Project will be available through NorthHub, an onsite employment, skills and training centre established by Lendlease. NorthHub was initially introduced to facilitate employment on the Northern Connector Project and will now be extended to include the Gawler Rail Electrification Project.


Expression of Interest process

All registrants will be required to submit the following two forms as part of the EOI process for this project:

  • Lendlease Engineering Prequalification Questionnaire - LLE503A (NC)
  • Transport Contractor CoR Compliance Audit - LLE626C

If you have previously submitted these for the Northern Connector project, a copy of your latest document will be accepted.

In addition, each work package EOI will require the following form to be submitted:

  • Gawler Electrification Project South Australian Industry Participation Plan and Workforce and Skills Development - Tender Schedule

These are available to download from the Project Documents section below. In addition to this being a mandatory step for involvement in this project, these submissions will be used for the Lendlease Engineering National Subcontractor and Supplier Prequalification process.

SHOW LESS

Project Documents


1. Documents to be submitted with EOI

  ▲ CONTRACT
LLE503A (NC) Vendor Prequalification Questionnaire
LLE626C Transport Contractor CoR Compliance Audit
GREP - IPP & WPP Tender Schedule

2. Supporting Documents

  ▲ CONTRACT
LLE503B1(NC) Global Minimum Requirements (GMRs)
ABCC Information Statement (Code for the Tendering and Performance of Building Work 2016)
LLE503B1 - Minimum Health, Safety and Environmental Requirements
SHOW LESS

Work Packages


To submit an expression of interest, select the icon next to the work package scope you are interested in.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS   MISCELLANEOUS    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Gawler Rail Electrification Project - Add me to the mailing list1 Nov 1711 Mar 18 
Register interest here to be advised when work packages are opened to EOI on the Gawler Rail Electrification project.