AIR 5431 Phase 2/3 - Air Traffic Management System & Air Traffic Control Complex Infrastructure



Contact Details


  Elena Tsangari
  (08) 8922 9422
CONTACT EMAIL

  Locations: NT Australia
  Project Value: $400M
  Project Status: Delivery Phase to construct the works will commence at Tindal March 2017 and Darwin June 2017
  Project Owner LENDLEASE BUILDING PTY LIMITED

Project Details


The Air Traffic Control (ATC) project is based on the need for Defence and Airservices Australia to achieve greater military/civil co-operation and harmonisation in the operation of Air Traffic Management on a national basis.

Project AIR 5431 is based on the procurement of a new Defence Air Traffic Management and Control System (DATMCS) to replace the existing Australian Defence Air Traffic System (ADATS) which reaches its life of type by calendar year 2018 to 2019. The new DATMCS is expected to comprise of deployable DATMCS (Phase 1), fixed surveillance sensors (Phase 2) and fixed base command and control systems (Phase 3). The Phase 3 component of the fixed base DATMCS is known as the Civil Military Air Traffic System (CMATS).

This projects primary objective, through projects R8085 & R8077, is to upgrade Defences Air Traffic Control Towers, Airfield Systems Complex facilities and Sensor Equipment Buildings that are aged and/or deteriorated and are no longer fit for purpose.

This equates to 24 Stages to be delivered across 13 Bases throughout Australia.

RAAF Base Tindal Works

The works at RAAF Base Tindal include a new build 25m Air Traffic Control Tower (TWR), a new build Airfield Systems Complex (ASC), and new build Sensor Equipment Building.

25m Air Traffic Control Tower

The 25m Air Traffic Control Tower (TWR) is a three level facility accommodating a control cabin, external observation deck, stand down level consisting of crew rest area, toilet, kitchenette, radio equipment room (RER), plant room, stairs and a lift from Ground Floor.

The key elements of the 25m tower structure comprise of a precast concrete shaft, with a steel framed control cabin. The control cabin includes both concrete and lightweight flooring. The tower is supported off a series of in ground piles, with the base of the tower set down to suit the lift over-run and the entry of services to the service riser.

Airfield Systems Complex (ASC)

The airfield systems complex is typically a single story facility, in the order of 1500m2, that will accommodate the following:

  • Executive offices, administration offices and work areas
  • Technical staff areas, dispatch, workshops
  • Briefing / meeting areas, crew support facilities and amenities, and;
  • Communications and services plantrooms.

Cladding to the airfield systems complex is of a predominantly lightweight nature including corrugated or profiled metal cladding and aluminum composite panels.

Typically the sub-structure consists of raft slab with integral pad foundations. The superstructure is typically based around using vertically spanning precast load bearing walls to the perimeter taken to the underside of metal deck roofing.

The Darwin ASC will be a modification, refurbishment and extension of the existing Airfield Systems Complex to enable transition to Air 5431 Phase 3 System.

Sensor Equipment Buildings

The Sensor Equipment Buildings have an approximate floor area of 100m2, consisting of a concrete raft slab construction with core filled blockwork walls. They have been designed to house a generator, main switchboard, battery room and communications room.

SHOW LESS

Work Packages


There are currently no open work packages for this project.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Trade Amenities 

Full scope has been awarded to:

Ausco Modular Pty Limited

10/14 Verrinder Rd
Berrimah NT 0828

Trade Amenities
Building Works 

Full scope has been awarded to:

Asbuild (NT) Pty Ltd

25/48 Marina Boulevard
Cullen Bay NT 0820

Building Works
Cabin Blinds 

Full scope has been awarded to:

VIP Finishing Touches Pty Ltd

21 Millenium Park Drive
Whittlesea VIC 3757

Cabin Blinds
Ceilings and Partitions 

Full scope has been awarded to:

Northern Territory Project Group Pty Ltd

2/5 Swan Crescent
Winnellie NT 0820

Ceilings and Partitions
Civil Works 

Full scope has been awarded to:

Allan King & Son Constructions

109 Pruen Rd
Berrimah NT 0828

Civil Works
Control Tower Facade 

Full scope has been awarded to:

Imexx Pty Ltd

122 Lang Road
Moore Park NSW 2021

Control Tower Facade
D and A Testing 

Full scope has been awarded to:

Safework Laboratories Pty Ltd

Unit 30, 16 Charlton Court
Winnellie, NT 0821

D and A Testing
Electrical ASC/TWR 

Full scope has been awarded to:

Nilsen NT Pty Ltd

41 Berrimah Road
Berrimah, NT 0828

Electrical ASC/TWR
Electrical SEB 

Full scope has been awarded to:

Combined Electrical Pty Ltd

9 Nylander St
Parap, NT 0820

Electrical SEB
FFE Supply 

Full scope has been awarded to:

Schiavello International Pty Ltd

1 Sharps Road
Tullamarine, VIC 3043

FFE Supply
Fire Services 

Full scope has been awarded to:

Endfire Engineering Pty Ltd

46 Winnellie Road
Winnellie, NT 0820

Fire Services
Hydraulics 

Full scope has been awarded to:

Pacific Plumbing Group Pty Ltd

6 Swan Crescent
Winnellie NT 0820

Hydraulics
Joinery 

Full scope has been awarded to:

Custom Cabinets Katherine Pty Ltd

Lot 1505 Crawford St
Katherine NT 0851

Joinery
Lift 

Full scope has been awarded to:

Schindler Lifts

Building D / 36-38 Lord St Botany
Sydney NSW 2019

Lift
Mechanical 

Full scope has been awarded to:

Value Added Construction Pty Ltd

29 Sudbury Street
Darra QLD 4076

Mechanical
Metalwork 

Full scope has been awarded to:

Crowhurst Goodline Pty Ltd

15 Emungalan Road
Katherine NT 0851

Metalwork
OandM Manuals 

Full scope has been awarded to:

WebFM

21 Mitchell Street,
Camden NSW 2570

OandM Manuals
Painting 

Full scope has been awarded to:

The Definitive Decorating Company

1/107 Winnellie Road
Winnellie NT 0820

Painting
Plant and Equipment 

Full scope has been awarded to:

Top Developments (NT) Pty Ltd

6 Nebo Rd
East Arm, NT 0828

Plant and Equipment
Precast Supply 

Full scope has been awarded to:

All Cast (NT) Drainage Systems Pty Ltd

Lot 1041 Makagon Road
Berrimah NT 0828

Precast Supply
Roofing and Cladding 

Full scope has been awarded to:

Politis Roofing Pty Ltd

14 Adams Road
Palmerston NT 0830

Roofing and Cladding
Scaffold 

Full scope has been awarded to:

Waco Kwikform Limited

10 Hook Street
Winnelllie NT 0820

Scaffold
Structural Steelwork 

Full scope has been awarded to:

CASA Engineering (Brisbane) Pty Ltd

145/151 Tile Street
Wacol QLD 4076

Structural Steelwork
Structure 

Full scope has been awarded to:

C&V Concretors (NT) Pty Ltd

31 Hazell Ct
Coconut Grove NT 0810

Structure
Survey Services - ASC/TWR 

Full scope has been awarded to:

Bennett & Bennett

95 Upton Street
Bundall QLD 4217

Survey Services - ASC/TWR
Survey Services - SEB 

Full scope has been awarded to:

Fyfe Pty Ltd

Building 4, Level 1, 631 Stuart Highway
Berrimah NT 0820

Survey Services - SEB
Tower Cabin Glazing 

Full scope has been awarded to:

G.James Glass and Aluminium Pty Ltd

1084 Kingsford Smith Drive
Eagle Farm QLD 4006

Tower Cabin Glazing
Waste Removal 

Full scope has been awarded to:

Veolia Environmental Services (Australia) Pty Ltd

13 Beaton Road
Berrimah NT 0828

Waste Removal
WSO  

Full scope has been awarded to:

Oz Airports Pty Ltd

2/113 Fitzmaurice Street
Wagga Wagga NSW 2650

WSO