Regional Bridges Upgrades and Lobethal Freight Route Upgrade



Contact Details


  Eddie Ivar
  (08) 8303 2170
CONTACT EMAIL

  Locations: SA Australia
  Project Value: $38 million
  Project Status: Tender
  Project Owner Department of Planning, Transport & Infrastructure (DPTI)

Project Details


The Regional Bridges Upgrades and Lobethal Freight Route Upgrade procurement aims to improve the safety and efficiency of the regional road network, and enable the operation of higher productivity vehicles on important freight routes. 

This procurement is made up of five separate packages of works, comprising bridge upgrades across the regional road network under the control of DPTI. The work also includes road upgrades associated with the Lobethal Freight Route Upgrade. 

The program of works includes: 

1.Lobethal Freight Route

The upgrading of portions of the Lobethal Freight Route between the east of Palmer (intersection of Randell Road and Milendella Road) and Lobethal to achieve Restricted Access Vehicle (RAV) Performance Based Standard (PBS) Level 2 between Murray Bridge and Lobethal. 

This package includes 36 separate projects.

2.Sturt Highway Bridges

The upgrading of various bridges to meet PBS Level 3A on the Sturt Highway between Blanchetown and the State Border. 

This package includes 11 separate projects.

3.Inverbrackie Bridge and Intersection Upgrade 

Bridge replacement and intersection upgrade works to improve traffic flow and safety at the intersection between Onkaparinga Valley Road and Riverview Road. 

4.Rocky River Bridge 

Bridge widening works.   


5.Bridge Replacement Program Sites 

Bridge widening and bridge replacement works of generally end of life structures to ensure that the bridges have suitable capacity and geometric provisions to improve heavy vehicle access and safety to meet PBS Level 2A at various regional locations. 

This package includes 6 separate projects.

SHOW LESS

Work Packages


To submit an expression of interest, select the icon next to the work package scope you are interested in.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
General EOI and Updates14 Nov 1731 Dec 17 
Express interest for any opportunities that may arise for this project and to keep abreast of project activities.