Carrapateena - ECI Package 3 - NRW



Contact Details


  Gavin Asikas
  (08) 8303 2472
CONTACT EMAIL

  Merril Kirk
  (08) 8463 6739
CONTACT EMAIL

  Locations: SA Australia
  Project Value: $50 million
  Project Status: Feasibility, awaiting statutory approvals/ECI phase preparing for execution when approvals received
  Project Owner NRW PTY LTD

Project Details


NRW has been invited to participate as ECI Contractor for the OZ Minerals Carrapateena project on the following:

  • Tailings Storage Facility and decant dam construction including bulk/detailed earthworks, geosynthetic liners, decant structures and return waterpipe work.

  • Plant site bulk earthworks, roads and drainage.

  • Earthworks and HDPE lining of storm and process water ponds.

  • Establishment and operation of Cave Zone Quarry to produce construction materials for project development. This includes drill and blast, load and haul and crushing and screening.



Opportunities on the Carrapateena project have been published on the following associated portals:

SHOW LESS

Work Packages


To submit an expression of interest, select the icon next to the work package scope you are interested in.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Plant and Equipment Hire - Aerodrome11 Oct 1729 Dec 17 
Supply of civil construction and earthmoving equipment.
Aerodrome Bitumen Seal8 Sep 1722 Sep 17 
EOI for the Aerodrome Bitumen Sealing Works for the Carrapateena ECI Package 3.
Binder for the 14/10 double/double seal is C320 bitumen with a further sand seal.
Construction method to be as per MRWA Spec 503 and Seal Design Report
Aerodrome Fencing8 Sep 1722 Sep 17 
EOI for the Aerodrome Fencing Works for the Carrapateena ECI Package 3.
Aerodrome Lighting and Navigation8 Sep 1722 Sep 17 
EOI for the Aerodrome Lighting and Navigation Works for the Carrapateena ECI Package 3.
Aerodrome Line Marking8 Sep 1722 Sep 17 
EOI for the Aerodrome Line Marking Works for the Carrapateena ECI Package 3.
HDPE Pipe8 Sep 1722 Sep 17 
EOI for the Supply and Installation HDPE Pipe for all aspects of Carrapateena Package 3.
Supply road furniture8 Sep 1722 Sep 17 
Supply and delivery to site of all required road furniture; including Guard rails, rpm's, guide posts and related items.
Survey Services8 Sep 1722 Sep 17 
EOI for the supply of Survey Services for all aspects of Carrapateena Package 3 including but not limited to the Aerodrome, Western Access Road, Plant Site and TSF.
Traffic management - traffic control services8 Sep 1722 Sep 17 
Implement and maintain an approved Traffic management plan; all traffic management to SA approved standards and regulations.
Traffic Management Plan - design services8 Sep 1722 Sep 17 
EOI for the supply of a DPTI (SA) approved Traffic management plan with associated TCD's for the Stuart Highway intersection works
Western Access Road - Survey Control Setup10 Oct 1720 Oct 17 
EOI for the supply of Survey Control Setup for the Carrapateena Package 3 Western Access Road.
Western Access Road Asphalt Paving8 Sep 1722 Sep 17 
EOI for the Western Access Road Asphalt Paving Works for the Carrapateena ECI Package 3.
Western Access Road Construction Water Pumping and Supply Line 8 Sep 1722 Sep 17 
EOI for the Western Access Road Construction Water Pumping and Supply Line Works for the Carrapateena ECI Package 3. To include transfer pumps, supply lines, turkey nest setup and turkey nest pumps.
Western Access Road CSP Culverts8 Sep 1722 Sep 17 
EOI for the Western Access Road CSP Culvert Works for the Carrapateena ECI Package 3.
Western Access Road Line Marking8 Sep 1722 Sep 17 
EOI for the Western Access Road Line Marking Works for the Carrapateena ECI Package 3.
Crushing and Screening10 Jun 1720 Jun 1720 Jun 17
Crushing, Screening and stockpiling of quarry material to produce basecourse and oversize scalps. Approximately 1.4 million tonne of material. Nominal duration of 10 months.
Drill and Blast services10 Jun 1720 Jun 1720 Jun 17
Drill and Blast services for Cave Zone Quarry. Approximate 1.4 million tonne. 5m and 8m Benches.
Geosynthetics/HDPE Liners10 Jun 1720 Jun 1720 Jun 17
Supply and installation of geosynthetic and HDPE Liners.
Geotechnical Services10 Jun 1720 Jun 1720 Jun 17
Supply of onsite geotechnical testing laboratory and testing technicians. Duration of approximately 18 months.
Haulage10 Jun 1720 Jun 1720 Jun 17
Truck Haulage of road-base from quarry to worksites. Approximately 1 million tonne up to 15km leads.
Precast Concrete products10 Jun 1720 Jun 1720 Jun 17
Supply of precast concrete products including box culverts, pipes and decant towers.
Site Facilities Hire10 Jun 1720 Jun 1720 Jun 17
Supply of site facilities including demountable buildings, workshops and generators.