Collinsville Solar PV Project



Contact Details


  Jatin Patel
  ICN - QLD
  (07) 3364 0621
CONTACT EMAIL

  Locations: QLD Australia
  Project Value: Approx $83 Million
  Project Status: Committed, Engineering and Mobilisation
  Project Owner UGL ENGINEERING PTY LIMITED

Project Details


The Collinsville Solar Project is a 58 MWdc renewable project located 5kms west of Collinsville, adjacent to the existing Collinsville Power Station. The project consists of 3 adjacent areas on which PV panels will be mounted on fixed mounting structures anchored to driven piles. Due to existing ground contours, reasonable earthworks will be required to cut existing high areas and fill existing low lying areas with engineered fill. Prior to earth works the areas will need to be cleared of trees and small scrub, with all vegetation mulched and reused on site.

New access roads from the adjacent public road (I.e. Powerhouse Road) and internal access tracks will need be constructed as well as temporary laydown areas and site amenities area.

Ratch-Australia Collinsville Solar Pty Ltd has appointed UGL Limited as the projects Engineering, Procurement and Construction Manager (EPCM). All major agreements will be with UGL Limited directly.


DELIVERY SCHEDULE

The Collinsville Solar project is a 12-month project with site mobilisation at end of May 2017 and completion of construction end of February 2018 with commissioning completed May 2018.


EXPRESSIONS OF INTEREST

UGL Limited and Ratch-Australia Collinsville Solar Pty Ltd encourages local industry interested in supplying to the project to register an expression of interest (EOI) through the ICN Gateway webpage.

Information on specific supply opportunities will be communicated on the ICN Gateway project page as it becomes available, with local industry able to register its interest against them.

Please ensure that:

  • Your company profile on the ICN Gateway is complete, up-to-date and accurate including electing to be notified via e-mail of supply opportunities
  • You register your interest as a full or partial scope supplier (where applicable), and
  • You respond to all project and work package-specific questions.

It is important that businesses submitting an EOI are aware that their submission does not guarantee that they will progress further in the procurement process. Only companies that can demonstrate capability and capacity in accordance with UGLs standards will be invited to pre-qualify for specific opportunities.


FURTHER ASSISTANCE

UGL Ltd and Ratch-Australia Collinsville Solar PV Pty Ltd strongly encourage local industry to contact the ICN Queensland in the first instance to improve their understanding of the EOI process.

UGLs primary contact for contract details is:

Mr Damian Fantozzi

Contracts Manager


SHOW LESS

Work Packages


There are currently no open work packages for this project.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
003- Site Facilities10 May 1726 May 17 
UGL Engineering is now preparing for the construction phase of the Collinsville Solar Farm project and expressions of interest are sought for the Site Facilities work package.
004- Site Security11 May 1729 May 17 
UGL Engineering in now preparing for the construction phase of the Collinsville Solar project and would like to invite expression of interest for the Site security workpackage
005-Ancillary Buildings16 May 1730 May 17 
UGL Engineering in now preparing for the construction phase of the Collinsville Solar project and would like to invite expression of interest for the Ancillary Building work package.
006-33kv AC cables17 May 1731 May 17 
UGL Engineering in now preparing for the construction phase of the Collinsville Solar project and would like to invite expression of interest for the 33kv AC cables work package.
007-Concrete Works17 May 171 Jun 17 
UGL Engineering is now preparing for the construction phase of the Collinsville Solar Farm project and expressions of interest are sought for the Concrete Works package
008-Electrical Hardware17 May 172 Jun 17 
UGL Engineering in now preparing for the construction phase of the Collinsville Solar project and would like to invite expression of interest for the Electrical Hardware work package.
001- Fencing9 May 1723 May 1723 May 17
UGL Engineering in now preparing for the construction phase of the Collinsville Solar project and would like to invite expression of interest for the Fencing Components
002- Civil construction and Earthworks9 May 1724 May 1724 May 17
UGL Engineering is now preparing for the construction phase of the Collinsville Solar Farm project and expressions of interest are sought for the Civil and Earthworks components