Gateway Shopping Centre Development Stage 2



Contact Details


  David Royle
  (08) 8922 9422
CONTACT EMAIL

  Locations: NT Australia
  Project Value: A$16M
  Project Status: Awarded - Start Date is 6 March 2017
  Project Owner HUTCHINSON BUILDERS

Project Details


Hutchinson Builders have been successful in securing stage 2 of the Gateway Shopping Centre Development in Palmerston NT.

Stage 2 of this development includes a Bulky Goods Retail or Home Improvement Centre of approximately 6,000-7,000sq.m.

The Principal of this project, Coombes Property Group / Challenger life Nominees Joint venture, wishes to create a new integrated retail, entertainment and large format retail facility which shall set a new benchmark for shopping centres in the greater Darwin region in the most convenient and community based environment and has prepared the Principal's project requirements (PPRs) to reflect this vision.

The site is located at the intersection of the Stuart Highway (to the North) and Roystonea Avenue (to the South). The site is triangular in shape with a total area of 4.22ha.

  • LARGE FORM RETAIL OUTLET: The scope of works in this Contracts includes all works and services to design and construct the new Large Format Retail Outlet including but not limited to all buildings, landscaping, services infrastructure, connection of services to Authorities net work s, all in accordance with the current local l and national  l standards, codes   and requirements.
  • AUTHORITY APPROVALS: On 27th September 2016 Development Permit DP16/0474 was received including associated conditions precedent, general conditions and notes.
  • EARTHWORKS:  An early works package has been separately awarded to BMD Urban Pty Ltd (Early Works Contractor). The building pads will be benched to levels under Level 1 Geotechnical supervision.  All roadworks, bike paths and kerbing outside the Gateway Stage 2 site boundary is by Early Works contractor.  This also includes all detention basin works.


SHOW LESS

Associated Opportunities


SHOW MORE

Work Packages


To submit an expression of interest, select the icon next to the work package scope you are interested in.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS       ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Gateway Shopping Centre Development Stage 2 - General Updates23 Feb 1723 Feb 18 
Express interest to receive general updates about the project
Blockwork 

Full scope has been awarded to:

Ferguson Blocklaying

Stuart Park
DARWIN NT

Blockwork
Ceiling and Partitions 

Full scope has been awarded to:

Northern Trade Solutions Pty Ltd

15 Mel Road

Berrimah, NT
Australia 0820
Phone: +61 8 8984 3090
Fax: +61 8 8984 3255
Email: info@ntsnt.com.au
Web: www.ntsnt.com.au

Ceiling and Partitions
Concrete Place and Finish 

Full scope has been awarded to:

JGA Concreting Pty Limited

7 Willes Road
BERRIMAH, NT
Australia 0828
Phone: (08) 8947 5372
Fax: (08) 8947 5246
Email: office@jgaconcreting.com.au
Web: www.jgaconcreting.com.au

Concrete Place and Finish
Concrete Supply 

Full scope has been awarded to:

HB Concrete

73 Reichardt Road
WINNELLIE NT

Concrete Supply
Detailed Excavation 

Full scope has been awarded to:

JGA Concreting Pty Limited

7 Willes Road
BERRIMAH, NT
Australia 0828
Phone: (08) 8947 5372
Fax: (08) 8947 5246
Email: office@jgaconcreting.com.au
Web: www.jgaconcreting.com.au

Detailed Excavation
Door Frames 

Full scope has been awarded to:

Commercial Doors and Hardware

5/4 College Rd
Berrimah NT 0828

Door Frames
Earthworks 

Full scope has been awarded to:

BMD URBAN PTY LTD

39 Georgina Crescent
Yarrawonga, NT
Phone: 08 8930 4405

An early works package has been separately awarded. The building pads will be benched to levels under Level 1 Geotechnical supervision. All roadworks, bike paths and kerbing outside the Gateway Stage 2 site boundary is by Early Works contractor. This also includes all detention basin works
Electrical 

Full scope has been awarded to:

Nightcliff Electrical Pty Ltd

17 Cousins Street
WINNELLIE, NT
Australia 0820
Phone: +61 8 8984 3955
Fax: +61 8 8947 0550
Email: admin@nightcliffelectrical.com.au
Web: www.nightcliffelectrical.com.au

Electrical
Fire Door and Frame Supply 

Full scope has been awarded to:

Commercial Doors and Hardware

5/4 College Rd
Berrimah NT 0828

Fire Door and Frame Supply
Fire Services 

Full scope has been awarded to:

ENDFIRE ENGINEERING SERVICES PTY LTD

46 Winnellie Road
WINNELLIE NT

Fire Services
Hydraulic 

Full scope has been awarded to:

Axis Plumbing

190 Beard Road
Humpty Doo NT

Hydraulic
Mechanical 

Full scope has been awarded to:

Australian Airconditioning & Mechanical Services

15 Anictomatis Road
BERRIMAH, NT
Australia 0828
Phone: +61 8 8935 6500
Email: admin@aamsgroup.com.au
Web: www.aamsgroup.com.au

Mechanical
Pre-Cast Panels 

Full scope has been awarded to:

Skyline Precast Pty Ltd

12 O'Sullivan Circuit
East Arm, NT
Australia 0822
Phone: +61 4 382 4923
Email: graeme_benaim@skylineprecast.com
Web: www.skylineprecast.com

Pre-Cast Panels
Reinforcement Fixing 

Full scope has been awarded to:

JGA Concreting Pty Limited

7 Willes Road
BERRIMAH, NT
Australia 0828
Phone: (08) 8947 5372
Fax: (08) 8947 5246
Email: office@jgaconcreting.com.au
Web: www.jgaconcreting.com.au

Reinforcement Fixing
Reinforcement Supply 

Full scope has been awarded to:

One Steel

Lot 1611 Bombing Road
WINNELLIE NT

Reinforcement Supply
Roller Doors and Grilles 

Full scope has been awarded to:

STEELINE GRP

84 Pruen Road
BERRIMAH, NT
Australia 0828
Phone: +61 8 8935 3900
Fax: +61 8 8947 4211
Email: ryan.bates@halikos.com.au
Web: www.steeline.com.au

Roller Doors and Grilles
Roofing 

Full scope has been awarded to:

ROOFCLAD CONSTRUCTIONS (NT) PTY LTD

18 Makagon Road
BERRIMAH, NT
Australia 0828
Phone: +61 8 8947 0324
Fax: +61 8 8947 1166
Email: admin@roofcladnt.com.au

Roofing
Structural Steel - Erection 

Full scope has been awarded to:

UNITED STRUCTURAL STEEL & RIGGING PTY LTD

unit 10/ 41 Georgina Crs
YARRAWONGA, NT
Australia 0830
Email: admin@ussrigging.com
Web: www.ussrigging.com

Structural Steel - Erection
Surveyor 

Full scope has been awarded to:

Bennett & Bennett

Suite 19, 396 Stuart Highway
WINNELLIE NT

Surveyor
HB-2017-002 Supply and Install Powdercoated Alumnium Louvre Systems 

Full scope has been awarded to:

GJames Glass & Aluminium

97 Winnellie Road
WINNELLIE NT

Contractor to supply and install Tenancy Louvres and AC Enclosure Louvres. Please refer to attached document for further information
HB-2017-003 Supply and Install Glazing 

Full scope has been awarded to:

G James Glass & Aluminium

97 Winnellie Road
WINNELLIE NT

Contractor to supply and install Glazing, including glazed dual swing doors. Please refer to attached document for further information
HB-2017-004 Supply and Install Roof Access Systems 

Full scope has been awarded to:

Height Safety Systems NT

U10/28 Albatross St
Winnelle, NT
Australia 0822
Phone: +61 8 8947 1522
Email: ian.bell@atfservices.com.au

Supply & Install Roof Access Systems. Please refer to attached document for further information
HB-2017-006 Metalwork 

Full scope has been awarded to:

NT Handrails Pty Ltd

1 & 2 / 60 Albatross Street
WINNELLIE, NT
Australia 0820
Phone: +61 8 8947 2005
Fax: +61 8 8947 2001
Email: nthandrails@bigpond.com
Web: www.nthandrails.com

Supply and Install all Metalwork. Please refer to attached document for further information
HB-2017-009 Painting 

Full scope has been awarded to:

ALLTRADES BUILDING & RENOVATIONS PTY LTD

Darwin, NT

Supply and Install Painting. Please refer to attached document for further information
HB-2017-001 Supply & Install Wheel Stops23 Feb 175 Mar 175 Mar 17
Contractor to supply and install 114(each) carpark wheel stops in the locations as specified in the drawings and specifications. Please refer to attached document for further information
HB-2017-005 Landscaping23 Feb 175 Mar 175 Mar 17
Supply all materials and complete Landscaping works. Please refer to attached document for further information
HB-2017-007 Builders Clean23 Feb 175 Mar 175 Mar 17
Contractor to utilise own cleaning and access equipment to complete Builders Clean. Please refer to attached document for further information
HB-2017-008 Tiling23 Feb 175 Mar 175 Mar 17
Install only of Tiling. Please refer to attached document for further information