BAE Systems Hunter Class Frigate Program


Project at a glance


ACT, NSW, NT, QLD, SA, TAS, VIC, WA Australia, NI, SI New Zealand
Preferred Tenderer
BAE SYSTEMS AUSTRALIA LIMITED

Contact Details


Ariane Lopes
Supply Chain Manager, ICNSA
+61 435 962 688

Cheryl Velautham
Head of Major Subcontracts - Combat Systems

Andy Goode (UK)
Program Manager, Supply Chain (UK)

Brian Condon
Capability Manager

Josh Halman
AIC Manager - Major Subcontracts

Matthew Critchley
Head of Major Subcontracts - Platform Equipment

Hunter program July 2023 update


The Hunter Class Frigate Program continues to make strong progress towards the delivery of a superior anti-submarine warfare capability for the Royal Australian Navy.

  • On 1 May this year our workforce at the Osborne Naval Shipyard commenced construction on the first schedule protection block. This block and three others are intended to be used in the first Hunter class frigate.
  • That we are able to incorporate these blocks in the first frigate is testament to the exceptional precision and quality of work achieved during the Hunter program's prototyping phase.
  • Throughout prototyping, which commenced in December 2020, our Osborne workforce has progressively tested and refined shipyard advanced manufacturing processes, systems, tools and capabilities. Two prototype blocks are fully constructed: Block 16 has successfully undergone blast and paint and has subsequently been moved into the Block Outfitting and Erection Hall for cold outfitting; Block 10 is currently undergoing blast and paint. Construction continues on the three subsequent prototype blocks.
  • In July, we are scheduled to commence Preliminary Design Review, which is a technical assessment to determine that the design is operationally effective, and detailed design can commence. PDR is scheduled for completion later this year.
  • We are committed to growing Australian industry capability and contributing to the development of continuous naval shipbuilding, and we have worked closely with our Customer, the Department of Defence, to jointly educate and support original equipment manufacturers to develop plans to maximise the use of Australian industry in the design, manufacture, test and installation of their equipment and systems in the first batch of three Hunter class frigates. To date we have awarded more than $120m in contracts to 45 local suppliers, delivering over and above our contracted commitments.
  • We are continuing to grow our workforce, and latest figures show the Hunter program employs nearly 1,500 people. That includes people employed as part of our Early Careers program - 27 apprentices, 35 graduates and 10 interns.
  • The program continues to invest in research and technology, collaborate with academics, researchers and local businesses to develop, test and trial advanced manufacturing processes and techniques that are already leading to productivity, quality and safety improvements at Osborne.

Watch the block build process - here

Steel in, Ship out video - here


Hunter Update

Click here to request access to the monthly newsletter detailing news on the Hunter Program.


More information - Hunter Class Update July 2023


Project Background

Click here to read more about the Hunter program.


Cyber Security Support

A cyber security tool has been developed to help small businesses access work in Australia's defence industry.


BAE Systems Australia, Saab Australia, industry partners and Federal Government have developed the Cyber Framework for the Defence Industry (CFDI) to help small and medium enterprises (SMEs) address the growing cyber risk.

The CFDI provides a standardised approach to cyber maturity assessment and can also guide users to next steps to increase their levels of cyber protection. It aims to support companies so they can self-manage their cyber security requirements and risks.

BAE Systems encourages businesses to utilise this tool to help understand cyber security maturity, and be proactive about increasing protections.


SMEs can download a sample of the cyber assessment tool in the Cyber Security document section at the bottom of the project page or click here.

You do not need to submit a completed tool to BAE Systems Australia unless invited to.


Upcoming engagement events

We will continue to advise of HCFP engagement events through ICN email notifications. To ensure you are kept up to date, please make sure you have a registered account with the ICN against the Hunter Class Frigate Program.


DISP information

Click here for information regarding DISP Membership and how to apply.
Working securely with Defence, DISP guide is also available in the attachment section of this portal. You can also click here to access it.


Industry Security Notice (ISN) 2018/06

Click here for information on handling and transmission of defence classified information.


How to register an Expression of Interest

Work Packages currently available can be viewed by clicking the Work Packages tab above.


Shortlisted companies will be invited to tender Work Packages as needed.

To submit an initial EOI for the Work Scopes, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.


ICN Gateway Company Registration

Click here to create your company profile on ICN Gateway.


Support and assistance is available through the web link below

Your company summary and description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.

ICN Gateway User Guide



Share this project on:

FB Twitter LinkedIn

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status
Accordian collapse

100. Hull Structure - Fabrication & Raw

Full Scope EOI

Closed: 
28 Sep 2020 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
21 Sep 2020 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
02 Oct 2020 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
30 Apr 2019 (ACST)

Partial Scope EOI

  Awarded
AccordianPlus CAT C - Stern Tubes

Full Scope EOI

Closed: 
14 Aug 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
21 Jul 2023 (ACST)

Partial Scope EOI

  Closed
Accordian collapse

10. Global Combat Ship (MBHS)

Full Scope EOI

Closed: 
21 Oct 2022 (ACST)

Partial Scope EOI

  Closed
Accordian collapse

300. Electric Plant

Full Scope EOI

Closed: 
19 Oct 2020 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
16 Nov 2020 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
25 Feb 2021 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
30 Apr 2019 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
19 Dec 2022 (ACST)

Partial Scope EOI

  Closed
AccordianPlus CAT-C 230V Sockets

Full Scope EOI

Closed: 
31 Mar 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
07 Oct 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
03 Mar 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
12 Nov 2021 (ACST)

Partial Scope EOI

  Closed
Accordian collapse

400. Command & Surveillance

Full Scope EOI

Closed: 
23 May 2020 (ACST)

Partial Scope EOI

  Closed
Accordian collapse

500. Auxiliary Systems

Full Scope EOI

Closed: 
07 Dec 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
01 Oct 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
12 Dec 2022 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
12 Mar 2021 (ACST)

Partial Scope EOI

  Closed
Accordian collapse

600. Outfit and Furnishings

Full Scope EOI

Create EOI
Closes: 
19 Apr 2024 (ACST)

Partial Scope EOI

  Open

Full Scope EOI

Create EOI
Closes: 
30 Apr 2024 (ACST)

Partial Scope EOI

  Open

Full Scope EOI

Closed: 
31 May 2019 (ACST)

Partial Scope EOI

  Awarded
AccordianPlus CAT C - Fasteners

Full Scope EOI

Closed: 
11 Nov 2019 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
10 Dec 2019 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
04 Feb 2020 (ACST)

Partial Scope EOI

  Awarded
AccordianPlus CAT C - Gaskets

Full Scope EOI

Closed: 
16 Oct 2020 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
02 Sep 2019 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
20 Nov 2019 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
19 Oct 2020 (ACST)

Partial Scope EOI

  Awarded
AccordianPlus CAT C - Pipe GRE

Full Scope EOI

Closed: 
14 Feb 2020 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
21 Oct 2019 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
06 Dec 2019 (ACST)

Partial Scope EOI

  Awarded
AccordianPlus CAT C - Treadplates

Full Scope EOI

Closed: 
17 Sep 2019 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
15 Nov 2019 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
21 Apr 2021 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
15 Mar 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
24 Feb 2022 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
26 Feb 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
11 Jan 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
29 Jan 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
27 Sep 2022 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
29 Jan 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
20 Jul 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
06 Sep 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Dec 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
24 Mar 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
16 Apr 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
05 May 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
07 May 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
10 May 2021 (ACST)

Partial Scope EOI

  Closed
AccordianPlus CAT C - Data Cables

Full Scope EOI

Closed: 
16 Apr 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
24 Feb 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
06 Sep 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
20 Sep 2021 (ACST)

Partial Scope EOI

  Closed
AccordianPlus CAT C - Heatshrink

Full Scope EOI

Closed: 
09 Apr 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
11 May 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
24 Sep 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
17 Sep 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
13 Sep 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
03 Aug 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
18 Mar 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
17 Sep 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
20 Jan 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
17 Sep 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
11 May 2021 (ACST)

Partial Scope EOI

  Closed
AccordianPlus CAT C - Shredders

Full Scope EOI

Closed: 
18 Mar 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
28 Apr 2021 (ACST)

Partial Scope EOI

  Closed
AccordianPlus CAT C - Smoke Curtains

Full Scope EOI

Closed: 
15 Oct 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
05 Jul 2021 (ACST)

Partial Scope EOI

  Closed
AccordianPlus CAT C - Stanchions

Full Scope EOI

Closed: 
20 Dec 2019 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
30 Sep 2020 (ACST)

Partial Scope EOI

  Closed
AccordianPlus CAT C - Step Covers

Full Scope EOI

Closed: 
07 Dec 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
16 Apr 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
17 Sep 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
28 Jun 2019 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
10 Mar 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
17 Apr 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
17 Apr 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
23 Dec 2019 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Dec 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
26 May 2023 (ACST)

Partial Scope EOI

  Closed
Accordian collapse

700. Armament

Full Scope EOI

Closed: 
08 May 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
03 Apr 2020 (ACST)

Partial Scope EOI

  Closed
Accordian collapse

900. Ship Assembly and Support Services

Full Scope EOI

Closed: 
25 Nov 2019 (ACST)

Partial Scope EOI

  Awarded
AccordianPlus CAT C - Cable Securing

Full Scope EOI

Closed: 
22 Nov 2019 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
13 Sep 2019 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
27 Sep 2019 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
26 May 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
09 Apr 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
04 Oct 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
29 Sep 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
26 Aug 2022 (ACST)

Partial Scope EOI

  Closed
AccordianPlus Pipe Heat Treatment

Full Scope EOI

Closed: 
03 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
20 Dec 2022 (ACST)

Partial Scope EOI

  Closed
Accordian collapse

Aviation

Full Scope EOI

Closed: 
12 Dec 2022 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
19 Oct 2022 (ACST)

Partial Scope EOI

  Closed
Accordian collapse

Combat Systems

Full Scope EOI

Closed: 
17 Mar 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
18 Jun 2021 (ACST)

Partial Scope EOI

  Closed
Accordian collapse

General Opportunities

Full Scope EOI

Create EOI
Closes: 
31 Jan 2025 (ACST)

Partial Scope EOI

  Open

Full Scope EOI

Closed: 
29 Jul 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
26 May 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
01 Nov 2020 (ACST)

Partial Scope EOI

  Closed
Accordian collapse

OEM in Country Support

Full Scope EOI

Closed: 
22 Jul 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
22 Jul 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
22 Jul 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
22 Jul 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
22 Jul 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
22 Jul 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
22 Jul 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
29 Sep 2020 (ACST)

Partial Scope EOI

  Closed
AccordianPlus GEA - Control Panel

Full Scope EOI

Closed: 
29 Sep 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
29 Sep 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Jul 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Jul 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Jul 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Mar 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Mar 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Mar 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Mar 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Mar 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Mar 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Mar 2020 (ACST)

Partial Scope EOI

  Closed
AccordianPlus Renold - Casting

Full Scope EOI

Closed: 
21 Aug 2020 (ACST)

Partial Scope EOI

  Closed
AccordianPlus Renold - CNC Machining

Full Scope EOI

Closed: 
21 Aug 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
21 Aug 2020 (ACST)

Partial Scope EOI

  Closed
AccordianPlus Renold - Painting

Full Scope EOI

Closed: 
21 Aug 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
21 Aug 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Feb 2023 (ACST)

Partial Scope EOI

  Closed
AccordianPlus Score-002-Ball Valves

Full Scope EOI

Closed: 
14 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
02 Oct 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
02 Oct 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
02 Oct 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
02 Oct 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
02 Oct 2020 (ACST)

Partial Scope EOI

  Closed
Accordian collapse

Research and Technology

Full Scope EOI

Closed: 
27 Nov 2019 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
27 Nov 2019 (ACST)

Partial Scope EOI

  Awarded

Full Scope EOI

Closed: 
02 Dec 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
29 Jan 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Dec 2022 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Dec 2022 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Dec 2022 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Dec 2019 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Mar 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
12 Mar 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
15 Mar 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
29 Jan 2021 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
10 Feb 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
09 Oct 2020 (ACST)

Partial Scope EOI

  Closed
Accordian collapse

Services and Supply Chain Support

Full Scope EOI

Closed: 
03 Apr 2020 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
15 Mar 2019 (ACST)

Partial Scope EOI

  Closed
Accordian collapse

Shipyard Services

Full Scope EOI

Closed: 
31 Jan 2019 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
14 Feb 2020 (ACST)

Partial Scope EOI

  Closed
Accordian collapse

01. Request For Information

Full Scope EOI

Closed: 
31 Dec 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Dec 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Dec 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Dec 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
21 Mar 2023 (ACST)

Partial Scope EOI

  Closed

Full Scope EOI

Closed: 
31 Dec 2023 (ACST)

Partial Scope EOI

  Closed
Note: The closing date/s for expressions of interest are subject to change.