Darwin Ship Lift Project


Project at a glance


NT Australia (Onshore)
Request for Proposals Stage
Department of the Chief Minister and Cabinet

Contact Details


Industry Capability Network (NT)
+61 8 8922 9422

The NT Government is building a ship lift in Northern Australia. The Darwin Ship Lift Facility will enable the maintenance and servicing of Defence and Australian Border Force vessels, along with commercial and private vessels, including from the oil, gas and marine industries.


The Darwin Ship Lift Facility will be designed to meet the needs of the general maritime sector and the current and long-term needs of the Department of Defence and the Australian Border Force, while supporting local jobs and economic growth in the Territory.


Once operational the facility will be a catalyst for the development of a marine maintenance and servicing industry, and the creation of many new jobs.


The common user ship lift facility will include:

  • a ship lift 26m wide, 103m long and 6m deep
  • lifting capability of 5,000 tonnes
  • wet berths (wharves)
  • additional hard stand area for ship repair and maintenance works.

The ship lift will have the capacity to lift vessels such as the new fleet of offshore patrol vessels procured by the Australian Defence Force.


The Darwin Ship Lift Facility will be a common user facility, which will enable vessel owners to choose and manage their own service and maintenance providers. This will also enable multiple providers to operate concurrently at the facility.


The ship lift is a common user facility that will operate on a commercial basis. There will be a legislated open access regime to ensure fair and equal use for all customers. Pricing and access will be overseen by the independent Utilities Commission. Construction is anticipated to take two years, becoming operational in 2024.


Further information on the project can be found by clickinghere

Share this project on:

FB Twitter LinkedIn

Work Package
Documents
Full Scope EOI
Partial Scope EOI
Status
Accordian collapse

Miscellaneous

Full Scope EOI

Create EOI
Closes: 
31 Dec 2024 (ACST)

Partial Scope EOI

  Open
Accordian collapse

Work Packages

Full Scope EOI

Closed: 
25 Sep 2020 (ACST)

Partial Scope EOI

  Closed
Note: The closing date/s for expressions of interest are subject to change.