Project Details


The Victorian Government has identified education as its number one priority, recognising that education is critical for both a cohesive society and strong economy.


Watpac Construction, as part of the Learning Communities Victoria consortium, will deliver the New Schools Project PPP for the Victorian State Government. The consortium brings together the ...
SHOW MORE

Associated Opportunities


  • New Schools Public Private Partnership (PPP) Project
SHOW MORE

Work Packages


To submit an expressions of interest, select the icon next to the work package scope you are interested in.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS   2. CONSTRUCTION & TRADE PACKAGES    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Pinboard Wall Linings16 Mar 1731 Mar 17n/a
Supply and Install all Pinboards (Acoustic type Sheets) and all Whiteboard Wall Lining shown on the project documents.
Sports Equipment16 Mar 1731 Mar 17n/a
The supply and installation of a broad set of sporting equipment including but not limited to: roof mounted retractable basketball backboard assemblies and rings, Indoor and outdoor posts netball, volleyball, soccer, tennis etc, and Sports wall padding to main gymnasium walls.
Toilet Partitions16 Mar 1731 Mar 17n/a
The supply and Install all Toilet Partitions including all standard hardware, including hat / coat hook, turnbolt / indicator, escape staple and bumper. Hinges are to be Lift-off Gravity type.
Window Blinds16 Mar 1731 Mar 17n/a
The supply and installation of all battery operated motorised roller blinds and manual operated roller blinds including blinds, chain, rollers etc to the areas nominated on the project documents. Make allowance for remote controls and all associated programming.
Painting11 Jul 1611 Apr 17n/a
The supply and application of all paint finishes to walls, ceilings, timber doors and the like as is required. Internal and external paint finishes including the provision of access equipment as may be required to undertake the Works.
Playground Equipment16 Mar 1711 Apr 17n/a
The complete design, supply and installation of external play equipment in accordance with the project documents.
Mirrors16 Mar 1727 Apr 17n/a
Supply & Installation of mirrors in accordance with project documents with two types of mirrors required:
(a) Mirrors to wet areas; first quality 6mm float glass mirrors fitted to Cowdroy A313 surround frame and
(b) Mirrors to areas surrounded by pinboards are to be frameless with a polished edge with direct stick to plasterboard.
Sanitary Hardware16 Mar 1727 Apr 17n/a
The supply of all sanitary hardware required for the project, including but not limited to: clothes hooks, folding shower seat, accessible grab rails, combination hand-dryer / paper towel dispenser, sharps cupboard, shower curtains & curtain rails, shelves, paper towel dispensers, soap dispensers, and toilet roll holders.
Fencing16 Mar 1724 Mar 17n/a
The complete design, supply and installation of external chain-wire fencing works including openings and gates in accordance with the project documents.
Landscaping11 Jul 1624 Mar 17n/a
The provision of labour, plant and materials as necessary to complete soft and hard landscaping. Works including items such as final cultivation of subgrades, construction of garden beds, general planting of trees & shrubs, seeded grass areas, construction of sports courts & playground areas, and construction of sports ovals and other areas. Supply and install irrigation systems as required. Maintain all landscaping for a period of time after installation and Builders completion.
Shade Structures16 Mar 1724 Mar 17n/a
Supply all labour, materials and equipment for the complete design, supply and installation of Shade Sails in accordance with the project documents.