|
|
|
|
|
|
|

|
|
|
|
Opportunities
Major Projects
|
|
Viewing: 1 to 10 of 72 |
|
Per Page: 10 | 20 | 50 | 100 |
|
Order by
|
Project Owner: ACTEW Corporation Ltd
Project Value: n/a Project Status: In Progress |
Location: ACT, Australia
Listing Started: 23 Oct 2008
Listing Ends: 24 Oct 2017 |
|
Summary: The Enlarged Cotter Dam forms part of ACTEW's continued response to secure water supplies for the ACT region's increasing population and to address the drought, climate change and variability. The Tantangara Transfer involves negotiations to determine the feasibility of transferring water from the Snowy Mountains Scheme, most likely via the Tantangara Reservoir in NSW, to the ACT. This project involves pumping water from the Murrumbidgee River near angle Crossing (close to the southern-most border of the ACT), and transferring it through a pipeline running via the Burra district to Googong Reservoir. A pump station will be constructed close to the Murrumbidgee River, and the water will be discharged into Burra Creek upstream of Googong Reservoir. Only Murrumbidgee River water in excess of environmental requirements will be transferred. |
|
Project Owner: Hancock Prospecting
Project Value: n/a Project Status: In Progress |
Location: QLD, Australia
Listing Started: 11 Mar 2010
Listing Ends: 11 Mar 2011 |
|
Summary: Hancock Prospecting has two projects under development in the Galilee Basin near Alpha, in Central Queensland. Hancock's Alpha Coal and Kevin's Corner Projects are adjacent projects located in the basin's rich thermal coal deposit, which until now has remained largely unopened to this level of development. |
|
Project Owner: Arrow Energy Pty Ltd.
Project Value: TBC Project Status: Front End Engineering Design (FEED) |
Location: QLD, Australia
Listing Started: 29 Feb 2012
Listing Ends: 28 Feb 2013 |
|
Summary: Arrow is planning the development of a liquefied natural gas (LNG) facility on Curtis Island, off Gladstone which will play an important role in meeting growing world demand for cleaner burning fuels.
|
|
Project Owner: Industry Capability Network (VIC) Ltd
Project Value: n/a Project Status: n/a |
Location: Indonesia
Listing Started: 5 Jul 2011
Listing Ends: 31 Dec 2012 |
|
Summary: The SAMP ASEAN Heath Infrastructure program will develop opportunities for Australian industry to provide services such as architectural design, building and construction, engineering and consulting, project management, health planning, quantity surveying, cost management and locally manufactured medical equipment into a rapidly growing regional health sector. |
|
Project Owner: Origin Energy, ConocoPhillips & Sinopec
Project Value: n/a Project Status: In Progress |
Location: QLD, Australia
Listing Started: 29 Apr 2010
Listing Ends: 29 Apr 2014 |
|
Summary: The Australia Pacific LNG Project is a coal seam gas (CSG) to liquefied natural gas (LNG) project based in Queensland. |
|
Project Owner: WATER AUSTRALIA PTY LTD
Project Value: NA Project Status: Underway |
Location: CA, United States of America
Listing Started: 23 Mar 2012
Listing Ends: 23 Mar 2013 |
|
Summary: NATIONAL WATER SECTOR STRATEGY FOR USA A significant initiative is currently being rolled out to assist water technology product and services companies establish market access arrangements in the USA. This follows on from the successful water mission to the USA in 2011. As a result of a $700,000 2 year SAMP Funding grant, waterAUSTRALIA is currently seeking to appoint US market representation. This should be finalised by end May 2012. |
|
Project Owner: AWD Alliance
Project Value: $8 Billion Project Status: Phase 3 - Build |
Location: SA, Australia
Listing Started: 13 Feb 2007
Listing Ends: 20 Sep 2014 |
|
Summary: The AWD shipbuild procurement process is now mature with shipset 1 now procured. Registration is still available but will not be against any specific work package |
|
Project Owner: Lend Lease Pty Ltd
Project Value: $6,000,000,000 Project Status: Detailed design underway |
Location: NSW, Australia
Listing Started: 28 Mar 2012
Listing Ends: 30 Jun 2013 |
|
Summary: Lend Lease is calling for expressions of interest from companies with worlds best technologies to become "Innovation Partners" for the Barangaroo South project. |
|
Project Owner: DENDROBIUM COAL PTY LTD
Project Value: not disclosed Project Status: Design underway |
Location: NSW, Australia
Listing Started: 2 Mar 2012
Listing Ends: 2 Mar 2014 |
|
Summary: BHP Billiton - Dendrobium Mine, Longwall Upgrade Project |
|
Project Owner: BHP Billiton and Mitsubishi Development Pty Ltd JV (50/50) managed by BMA
Project Value: Not Disclosed Project Status: Open |
Location: QLD, Australia
Listing Started: 14 Apr 2011
Listing Ends: 1 Dec 2015 |
|
Summary: BHP Billiton selected Bechtel to be the contractor for its Brisbane Hub, an integrated office for planning, executing and optimising multiple projects over an extended period |
|
|
|
|
|
|
|