Ichthys LNG Project

Ichthys LNG Project Project Owner: INPEX Browse Ltd
Project Value: US$34 billion
Project Status: Construction
Location: NT, Australia

Associated Projects:
Ichthys LNG Project
   - Ichthys Onshore Facilities
      - Temporary Site Facility Works (TMP 1)
      - Site Development Civil Works (CVL 2)
      - Module Offloading Facility (MOF)
      - Product Loading Jetty
      - Ichthys Accommodation Village
   - Ichthys Offshore Production Facilities
      - Floating Production Storage & Offloading Facility (FPSO)
      - Subsea, Umbilicals, Risers, and Flowlines (SURF) EPCI
      - Central Processing Facility (CPF)
      - Ichthys Development Drilling Campaign

The Ichthys Field in the Browse Basin offshore Western Australia first demonstrated its potential to be a world-class gas project in 2000. Since then, most likely resource estimates have grown to 12.8 tcf of gas and 527 million barrels of high value condensate.

In September 2008, INPEX (Operator, 76%) and its joint venture partner Total (24%), selected Darwin as the site for the LNG processing facility.

Gas from the Ichthys Field will undergo preliminary processing at the offshore central processing facility (CPF) to remove water and raw liquids, including a large proportion of the condensate. This condensate will be pumped to a floating production, storage and offloading (FPSO) facility anchored nearby, from which it will be transferred to tankers for delivery to markets. The gas will be transported from the CPF through a subsea pipeline more than 885 kilometres to the onshore LNG processing plant proposed for Blaydin Point on Middle Arm Peninsula, Darwin, Northern Territory.

The Ichthys Project will have an initial capacity to produce 8.4 million tonnes of LNG per annum and 1.6 million tonnes of liquefied petroleum gas (LPG) per annum, as well as approximately 100,000 barrels of condensate per day at peak.

The Project is now in the construction phase, following a Final Investment Decision (FID) in January 2012. Mobilisation for construction of the Project has begun. 

In collaboration with Industry Capability Network (ICN) the Ichthys Project will communicate upcoming contracting and procurement opportunities via ICN Gateway. Companies wishing to register interest in the Project are encouraged to register.

ICN Gateway will also be utilised to communicate general information and updates related to Ichthys contracting and procurement activities.

 

Definitions:

Tier 1 - A functional unit or complete package i.e able to produce/supply ALL of the requirements.

Tier 2 - A component or part of the package i.e able to produce/supply part or some of the requirements.

 

Note. When a work package status becomes 'awarded', details of the awarded company will become visible by clicking the plus icon next to the work package title.



click to expand/contract Work Packages

Currently Listing 6 Work Packages:
Tier 1: Complete package or service for this work package required. Tier 2: Partial package or service for this work package allowed.
 
Work Package

Status

Applications Open

Tier 1 Closes

Tier 2 Closes

PDF

Miscellaneous

Aboriginal and Torres Strait Islander Business Engagement Open 4 Jun 2011 3 Jun 2012 4 Jun 2015 Download Documentation
Provision of Savannah Fire Management Services Expression of Interest Open 28 Mar 2012 4 Jun 2012 5 Jun 2012 Download Documentation
General Project Expressions of Interest Open 12 Oct 2011 12 Oct 2012 1 Jan 2015
Offshore Logistics Base Open 16 Apr 2012 13 May 2012 13 May 2013 Download Documentation
Logistics - Satellite Tracking Open 7 Oct 2010 25 Nov 2010 1 Jan 2015 Download Documentation
INPEX - Project Management Accommodation ROI (Registration of Interest) Closed 21 Mar 2012 30 Mar 2012 31 Mar 2012 Download Documentation