O-Bahn City Access project



Contact Details


  Eddie Ivar
  ICN - SA
  (08) 8303 2170
CONTACT EMAIL

  Location: SA, Australia
  Project Value: $160 million
  Project Status: Tender awarded
  Project Owner Department of Planning, Transport & Infrastructure (DPTI)

Project Details


The O-Bahn City Access Project is to provide at-grade priority bus lanes along Hackney Road; and a guided busway tunnel from Hackney Road (just north of Botanic Road) to Grenfell Street. The project extends from the Hackney Rd Bridge to the Grenfell and East Terrace Intersection (Adelaide CBD).

The Project provides the following primary benefits:

(a) improved ...
SHOW MORE

Project Documents


Industry Briefing 11 November 2015

  ▲ CONTRACT
1 Dariusz Fanok - DPTI - O-Bahn City Access Project
2 McConnell Dowell presentations - O-Bahn City Access
3 Ian Nightingale Office of the Industry Advocate O-Bahn Access Project briefing
4 Bettina Venner ICN presentation - O-Bahn City Access
5 Tim Hutchinson Workforce Participation presentation - O-Bahn City Access

Shortlisted Tenderers

  ▲ CONTRACT
O-Bahn City Access Project - Shortlisted tenderers - 7 April 2016
O-Bahn City Access Project - Shortlisted tenderers - 8 December 2015
SHOW LESS

Work Packages


To send expressions of interest for multiple work packages, select all relevant checkboxes and then click 'Send Expression of Interest'

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
STATUS   GENERAL    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Contamination Management Works2 May 1612 May 16n/a

Full scope has been awarded to:

Golder Associates Pty Ltd - Transportation and Infrastructure

118 Franklin Street
Adelaide, SA
Australia 5000
Phone: +61 08 82132100
Fax: +61 08 82132101
Email: tccarter@golder.com.au
Web: www.golder.com.au

Awarded
Fuel Distribution2 May 1612 May 16n/a

Full scope has been awarded to:

Mini Tankers


Refuelling Solutions Australia Pty Ltd

Unit 4b 2a Westall Road
SPRINGVALE, VIC
Australia 3171
Phone: 03 95440000
Fax: 03 95440344
Email: puniacke@minitankers.com.au

Awarded
Hackney Road Acceleration Earthworks2 May 1612 May 16n/a

Full scope has been awarded to:

LUCAS TOTAL CONTRACT SOLUTIONS PTY LTD

BROOKSIDE ROAD
DARLINGTON, SA
Australia 5047
Phone: +61 08 81794000
Fax: +61 08 83583849
Email: Adam.Betterman@LucasTCS.com.au
Web: www.LucasTCS.com.au

Awarded
Installation of Clutch Sealant18 Apr 1628 Apr 16n/a

Full scope has been awarded to:

SuperSealing

Unit 4
2 Ocean Road
Port Elliot, SA
Australia 5212
Phone: +61 04 18543354
Email: warren@supersealing.com.au
Web: http://www.supersealing.com.au/

Awarded
ITS & Comms2 May 1612 May 16n/a

Full scope has been awarded to:

Sage Automation Pty Ltd

34 Bennet Avenue
MELROSE PARK, SA
Australia 5039
Phone: +61 08 82760700
Fax: +61 08 82760799
Email: sage@sageautomation.com
Web: www.gotoSAGE.com

Awarded
Loading & Delivery of Sheet Piles to Site29 Apr 169 May 16n/a

Full scope has been awarded to:

SAMARAS STRUCTURAL ENGINEERS

96-106 Grand Trunkway
GILLMAN, SA
Australia 5013
Phone: +61 08 83477088
Fax: +61 08 83477088
Email: Kkoutsonas@samarasgroup.com
Web: www.samarasgroup.com

Awarded
Sheet Pile Supply12 Apr 1622 Apr 16n/a

Full scope has been awarded to:

MARUBENI-ITOCHU STEEL OCEANIA PTY LTD

Level 25/ 570 Bourke Street
MELBOURNE, VIC
Australia 3000
Phone: +61 03 92421502
Fax: +61 03 92421599
Email: r.middlebrook@benichu.com.au
Web: www.benichu.com.au

Awarded
Supply of Clutch Sealant14 Apr 1624 Apr 16n/a

Full scope has been awarded to:

THYSSENKRUPP MATERIALS AUSTRALIA PTY LTD

Suite 502, 11 Help Street
CHATSWOOD, NSW
Australia 2067
Phone: +61 02 84483555
Fax: +
Email: enquiries.tkinfrastructure.au@thyssenkrupp.com
Web: www.thyssenkrupp-infrastructure.com.au

Awarded.
Tram Barn Cleaning Services12 Apr 1622 Apr 16n/a

Full scope has been awarded to:

Somerset Environmental Services

2A Allan Street
Melrose Park, SA
Australia 5041
Phone: +61 8 82778144
Fax: +61 8 82778155
Email: somerset_petra@bigpond.com

Awarded.
Waste Management9 May 1619 May 16n/a

Full scope has been awarded to:

RESOURCECO PTY LTD

Corner Wingfield and Hines Road
WINGFIELD, SA
Australia 5013
Phone: +61 08 8347332
Email: info@resourceco.com.au
Web: www.resourceco.com.au

Awarded
Water Fountain Relocation2 May 1612 May 16n/a

Full scope has been awarded to:

Outside Ideas

86 Leader Street
Forestville, SA
Australia 5035
Phone: + 08 82972330
Fax: +
Email: shaune.amber@outsideideas.com.au
Web: www.outsideideas.com.au

Awarded
Labour Hire4 Nov 1514 Nov 1514 Nov 15

Full scope has been awarded to:

ZANCOTT RECRUITMENT

21A
Nelson Street
STEPNEY, SA
Australia 5069
Phone: +61 08 83632442
Fax: +61 08 83637794
Email: brynne@zancott.com
Web: www.zancott.com

MK2 RECRUITMENT PTY LTD

233 South Road
MILE END, SA
Australia 5031
Phone: + 08 82341568
Fax: + 08 82341459
Email: mark.conry@mk2recruitment.com
Web: www.mk2recruitment.com

Provision of construction labour to undertake various works on the project
Quarry Products - Recycled4 Nov 1514 Nov 1514 Nov 15

Full scope has been awarded to:

ADELAIDE RESOURCE RECOVERY

FAR NORTHERN END OF HANSON RD.
WINGFIELD, SA
Australia 5013
Phone: +61 08 82448156
Fax: +61 08 82687077
Email: admin@arr.net.au
Web: www.arr.net.au

Approximately 15,000m2 of road pavement plus additional temporary haul roads, piling and crane pads across the project. Material required also for trench backfill material
Survey4 Nov 1514 Nov 1514 Nov 15

Full scope has been awarded to:

ENGINEERING SURVEYS PTY LTD

4/11 Ridley Street
HINDMARSH, SA
Australia 5007
Phone: +61 08 83404469
Email: office@engsurveys.com.au
Web: www.engsurveys.com.au

Provision of a survey team and a lead survey manager for the entirety of the project. Both 2D and 3D model to be provided for setout and provision of final asbuilts including ongoing updates to the master model(s) for all scopes of work, including services, roadworks and structures.
Site Accommodation4 Nov 1516 Nov 1516 Nov 15

Full scope has been awarded to:

BIANCO HIRE

600 Main North Rd
GEPPS CROSS, SA
Australia 5094
Phone: +61 08 81626300
Fax: +61 08 83590455
Email: paulc@biancohire.com.au
Web: www.biancohire.com.au

Supply and install site amenity huts, including crib rooms, toilet blocks, first aid huts, office huts, etc - service connections by others
Temporary Fencing4 Nov 1518 Nov 1518 Nov 15

Full scope has been awarded to:

BIANCO HIRE

600 Main North Rd
GEPPS CROSS, SA
Australia 5094
Phone: +61 08 81626300
Fax: +61 08 83590455
Email: paulc@biancohire.com.au
Web: www.biancohire.com.au

Supply and install approximately 1,500m of temporary fencing for the duration of the project
Arborist - Vegetation removal5 Nov 1519 Nov 1519 Nov 15

Full scope has been awarded to:

MECHANICAL VEGETATION SOLUTIONS PTY LTD

4 Talisman Avenue
EDWARDSTOWN, SA
Australia 5039
Phone: + 08 83742768
Fax: + 08 83742979
Email: paul@vegetationsolutions.com.au
Web: www.vegetationsolutions.com.au

Approximately 140 small to large trees and additional small vegetation as required along tunnel alignment and other localised structures on the project.
Haulage & Water Cart5 Nov 1519 Nov 1519 Nov 15

Full scope has been awarded to:

Marzilli Transport Pty Ltd

42 Brown Street
WEST CROYDON, SA
Australia 5008
Phone: 08 83460580
Email: avent@adam.com.au

Provide heavy vehicle truck haulage for both clean and contaminated soil waste
Tip Fes/Contaminated Waste Disposal5 Nov 1519 Nov 1519 Nov 15

Full scope has been awarded to:

ADELAIDE RESOURCE RECOVERY

FAR NORTHERN END OF HANSON RD.
WINGFIELD, SA
Australia 5013
Phone: +61 08 82448156
Fax: +61 08 82687077
Email: admin@arr.net.au
Web: www.arr.net.au

Disposal facility for contaminated and clean soil waste, concrete, asphalt, vegetation
Traffic Management5 Nov 1519 Nov 1519 Nov 15

Full scope has been awarded to:

Altus Traffic Pty Ltd

2 Rawlings Avenue
TORRENSVILLE, SA
Australia 5031
Phone: +61 08 84439288
Fax: +61 08 84439688
Email: sa_operations@altustraffic.com.au
Web: www.altustraffic.com.au

Provide traffic management personnel for the duration of the project as required for daily temporary traffic arrangements. Provide detailed traffic management plans detailing compliant signage arrangements.
Dilapidation Surveys11 Nov 1521 Nov 1521 Nov 15

Full scope has been awarded to:

FYFE PTY LTD

77 Smith Street
Ciccone, NT
Australia 0870
Phone: +61 08 89447888

Provide full dilapidation reporting on local property and infrastructure for the project including a catalogue of video and photos
Geotechnical Testing11 Nov 1521 Nov 1521 Nov 15

Full scope has been awarded to:

FMG ENGINEERING

42 Fullarton Road
Norwood, SA
Australia 5067
Phone: +61 08 83630222
Fax: +61 08 83631555
Email: jeremy.clapp@fmgengineering.com.au
Web: www.fmgengineering.com.au

Provide equipment and engineering for all geotechnical testing requirements on the project.
Time Lapse11 Nov 1521 Nov 1521 Nov 15

Full scope has been awarded to:

spectur

1300 802 960

Supply, install and provide an ongoing time-lapse photo stream of the project from a minimum of 1 locations on the project.
Underground Service Locating11 Nov 1521 Nov 1521 Nov 15

Full scope has been awarded to:

VAC Group Operations Pty Ltd

Level 1, 11 Main St
BEENLEIGH, QLD
Australia 4207
Phone: +61 13 00822834
Fax: +61 07 38075599
Email: sales.team@vacgroup.com.au
Web: www.vacgroup.com.au

Provide potholing and utility service locating for the project.
Crane Hire11 Nov 152 Dec 152 Dec 15

Full scope has been awarded to:

SAMARAS STRUCTURAL ENGINEERS

96-106 Grand Trunkway
GILLMAN, SA
Australia 5013
Phone: +61 08 83477088
Fax: +61 08 83477088
Email: Kkoutsonas@samarasgroup.com
Web: www.samarasgroup.com

Torrens Footbridge (transport & cranage)
Edinburgh Laydown (transport & cranage)
Reinforcement Supply11 Nov 153 Dec 153 Dec 15

Full scope has been awarded to:

ONESTEEL REINFORCING (SA)

519 CROSS KEYS ROAD
CAVAN, SA
Australia 5092
Phone: +61 08 83498666
Fax: +61 08 83497555
Web: www.reinforcing.com.au

Supply of all steel reinforcement and sundries to facilitate all concrete works on the project.
Footbridge Precast Structural Concrete11 Nov 158 Dec 158 Dec 15

Full scope has been awarded to:

BIANCO PRECAST

565 GRAND JUNCTION ROAD
GEPPS CROSS, SA
Australia 5094
Phone: +61 08 83590666
Fax: +61 08 83590677
Email: michaelfav@biancoprecast.com.au
Web: www.biancoprecast.com.au

Fabricate and deliver precast girders for bridge structures
Hackney Road Bridge Scaffolding11 Nov 159 Dec 159 Dec 15

Full scope has been awarded to:

All State Construction Solutions

2/26 Bennett Ave
MELROSE PARK, SA
Australia 5039
Phone: +04 28 540930
Fax: +
Email: Dhoare@allstateconstructionsolutions.com.au

Scaffold access required to the underside of the Hackney Road Bridge (west bridge) for steel strengthening works access, demolition access, concrete works and other sundry tasks. Consideration to the River Torrens below is of high importance for the scaffold design.
Bituminous Surfacing11 Nov 1514 Dec 1514 Dec 15

Full scope has been awarded to:

FULTON HOGAN INDUSTRIES PTY LTD

115 -119 CHURCHILL RD NORTH
DRY CREEK, SA
Australia 5094
Phone: +61 08 82340800
Fax: +61 08 82340135
Web: www.prs.com.au

Approximately 15,000m2 of road pavement including multiple asphalt layers. Works will include paver application and hand works as required.
Steel Bridge Strengthening11 Nov 1515 Dec 1515 Dec 15

Full scope has been awarded to:

Tri-Metal Engineering Pty Ltd

29 CEAFIELD ROAD
PARA HILLS, SA
Australia 5096
Phone: +61 08 82586563
Fax: +61 08 82582971
Email: admin@trimetal.com.au
Web: www.trimetal.com.au

Steel strengthening upgrades to the existing steel structure on Hackney Road Bridge (west bridge). Works include plate weld strengthening and additional cross bracing.
Temporary Traffic Barriers11 Nov 1517 Dec 1517 Dec 15

Full scope has been awarded to:

COATES HIRE

8 Matson Court
GILLMAN, SA
Australia 5013
Phone: +61 08 82413000
Email: leigh.rebbeck@coateshire.com.au

Supply and deliver concrete and/or steel temporary traffic barriers to assist with temporary traffic arrangements.
Traffic Signals (Temporary)11 Nov 1518 Dec 1518 Dec 15

Full scope has been awarded to:

BORE-TECH (SA) PTY LTD

18 Coburgh Road
ALBERTON, SA
Australia 5014
Phone: +61 08 82402974
Email: enquiries@boretech.com.au
Web: http://www.boretech.com.au

GRIDLOCK ELECTRICAL

22 Main Terrace
RICHMOND, SA
Australia 5033
Phone: 08 83526703
Fax: 08 83527849
Email: admin@gridlockelectrical.com.au
Web: www.gridlockelectrical.com.au

Both temporary and permanent traffic signal works to align with traffic management strategies and for new road alignments and sequencing.
Air quality and monitoring stations10 Dec 1521 Dec 1521 Dec 15

Full scope has been awarded to:

ECOTECH PTY LTD

1492 Ferntree Gully Road
KNOXFIELD, VIC
Australia 3180
Phone: +61 13 00364946
Fax: +61 13 00668763
Email: enquiries@ecotech.com
Web: www.ecotech.com

Provide air and water quality monitoring services as required for the project.
Drug and Alcohol screening10 Dec 1521 Dec 1521 Dec 15

Full scope has been awarded to:

Drug & Alcohol Solutions Australia Pty Ltd

Email: info@dasa.net.au
Phone: 02 8001 2535
Post: PO Box 288 MERRYLANDS NSW 2160

Perform drug and alcohol screening services on site.
Linemarking11 Nov 1523 Dec 1523 Dec 15

Full scope has been awarded to:

Workforce Road Services

Level 1
601 Botany Road
Rosebery, NSW
Australia 2018
Phone: +61 02 93106900
Fax: +61 02 96982975
Email: johan.vanmaanen@workforce.com.au
Web: www.workforce.com.au

Removal of existing linemarking as required and application of new linemarking for road network, carparks, footpaths, etc.
Sheetpile Installation11 Nov 156 Jan 166 Jan 16

Full scope has been awarded to:

AUSTRAL CONSTRUCTION PTY LTD

946 HIGH STREET
ARMADALE, VIC
Australia 3143
Phone: +61 03 95762577
Fax: +61 03 95762566
Email: melbourne@australconstruction.com.au
Web: www.australconstruction.com.au

PILING CONTRACTORS PTY LTD (SA Office)

PO Box 2102
REGENCY PARK, SA
Australia 5942
Phone: +61 13 00341576
Email: adelaide@pilingcontractors.com.au
Web: www.pilingcontractors.com.au

Installation and site management of the sheetpiles required for the permanent tunnel alignment. Scope includes approximately 14,000m2 of sheetpile installation, at an average depth of 15m from existing ground level.
Hackney Road Bridge Concrete Demolition & Saw Cutting11 Nov 158 Jan 168 Jan 16

Full scope has been awarded to:

BK INNOVATIVE CONCRETE SERVICES PTY. LTD

18 Barrsmith Street
TUSMORE, SA
Australia 5065
Phone: + 08 83330703
Fax: +
Email: konh@bkics.com.au

Demolition of the existing edge kerbs, footpaths, balustrades and partial deck demolition to the western edge of the bridge.
Electrical installation - Site Ammenities11 Nov 1515 Jan 1615 Jan 16

Full scope has been awarded to:

Infrastructure Electrical Services

10 Ragless Street
St Marys, SA
Australia 5042
Phone: +61 08 82764444
Fax: +61 08 82764455
Email: davids@ieservice.com.au

Supply and install the electrical fit-out within the Tunnel Services Building and other temporary power requirements on site as required.
Plumbing - Site ammenities11 Nov 1515 Jan 1615 Jan 16

Full scope has been awarded to:

Hindmarsh Plumbing Services Pty Ltd

27 South Road
HINDMARSH, SA
Australia 5007
Phone: +6 08 84038300
Fax: +61 08 83403008
Email: kdecean@hindmarshplumbing.com.au
Web: www.hindmarshplumbing.com.au

Temporary plumbing works for local site huts and construction works.
Supply and install all water and waste services within the Tunnel Services Building.
Site Security4 Nov 1518 Nov 1518 Nov 15
Provision of site security guards for patrol as required on the project
Construction Waste Disposal11 Nov 1521 Nov 1521 Nov 15
Provision of site bins for construction waste including pickup, disposal and replacement and small bins for consumer waste.
Demolition11 Nov 1521 Nov 1521 Nov 15
Provide labour and equipment to undertake saw cutting, concrete demolition, hydro demolition throughout the project.
Footbridge Piling11 Nov 1521 Nov 1521 Nov 15
Design and construct or construct only the piles for the new Torrens Pedestrian Bridge adjacent Hackney Road bridge
Scaffold11 Nov 1521 Nov 1521 Nov 15
Provision of design, supply and install of scaffolding systems across the project
Vac Truck / Soft Digging11 Nov 1521 Nov 1521 Nov 15
Provide plant and labour for wet vac digging and potholing throughout the project.
VMS Boards11 Nov 1521 Nov 1521 Nov 15
Provide dry hire and message uploading service for Variable Message Signs (VMS) across the project.
Steel Fabrication9 Nov 1523 Nov 1523 Nov 15
Scope may include steel girders for bridge structures, urban design elements and steel gantries for new road signage and ITS equipment
Water Main Installation11 Nov 1525 Nov 1525 Nov 15
Multiple water main re-locations as required along the tunnel alignment.
Concrete FRP - Tunnel Structure11 Nov 1526 Nov 1526 Nov 15
Structural concrete form, reinforce and pour for the 650m long tunnel structure including; in-situ capping beams along each side of the tunnel alignment, in-situ tunnel walls, in-situ base slab and roof topping slabs.
Pedestrian Footbridge Construction16 Nov 1526 Nov 1526 Nov 15
Construction of a pedestrian footbridge across the River Torrens adjacent the existing Hackney Road Bridge. Works shall include all earthworks, piling, concrete works, bridge structure and all finishes to achieve scope completion.
Road Pavements & Drainage11 Nov 1526 Nov 1526 Nov 15
Undertake road civil works for pavement excavation and construction, local drainage works and kerb works
Kerbing11 Nov 1527 Nov 1527 Nov 15
Supply and lay concrete kerbing for all roadworks on the project
Concrete FRP - Torrens Footbridge11 Nov 151 Dec 151 Dec 15
Structural concrete form, reinforce and pour for a footbridge structure, including; in-situ footings, piers, headstocks and bridge deck.
Concrete Supply11 Nov 157 Dec 157 Dec 15
Supply of all concrete and appropriate testing to facilitate all concrete works on the project.
Plant Hire / Equipment Hire11 Nov 158 Dec 158 Dec 15
Provision of plant hire for civil/construction equipment including both wet and dry hire.
Signage11 Nov 1511 Dec 1511 Dec 15
Supply and install permanent signage for the project including the tunnel, local road and footpath network
Drainage Installation11 Nov 1520 Dec 1520 Dec 15
Drainage upgrades across the project with localised demolition, install of new pits and connection pipes throughout Hackney Road, Dequetteville Tce, Rundle Road and East Tce.
Street lighting11 Nov 157 Jan 167 Jan 16
Upgrades to Hackney Road, Dequetteville Tce, Rundle Road and East Tce include the provision for new street lighting supply and install. Existing power network shall be utilised and new as required.
Anti-Graffiti coatings11 Nov 1515 Jan 1615 Jan 16
Supply anti-graffiti coating systems for concrete structures
Asbestos Removal11 Nov 1515 Jan 1615 Jan 16
Remove and dispose of asbestos pipes and any other asbestos discovered on site.
Bulk Earthworks11 Nov 1515 Jan 1615 Jan 16
Supply bulk earthworks civil plant, operators and labour to undertake the excavation operations for the tunnel.
De-watering11 Nov 1515 Jan 1615 Jan 16
Supply and installation of de-watering system along tunnel alignment to enable excavation below the existing groundwater levels.
Electrical Distribution (HV & LV) & Tunnel11 Nov 1515 Jan 1615 Jan 16
Supply and install all electrical distribution into the Tunnel, both LV & HV, including connection to local HV transformer and provide electrical distribution throughout the tunnel.
Footbridge Balustrades11 Nov 1515 Jan 1615 Jan 16
Fabricate and install balustrade for bridge structures.
Hackney Road Bridge Widening Works11 Nov 1515 Jan 1615 Jan 16
Scope includes carbon fibre strengthening of Hackney Road Bridge (west bridge) and new concrete works for widening the existing deck.
Landscaping11 Nov 1515 Jan 1615 Jan 16
Upgrades to Hackney Road, Dequetteville Tce, Rundle Road and East Tce including new median strips, footpaths, paving, topsoil and turf along tunnel alignment throughout the parklands and remediation to the construction site as required.
Mechanical Services - HVAC11 Nov 1515 Jan 1615 Jan 16
Supply and install the Mechanical HVAC system within the Tunnel Services Building.
Packaged Pump Station11 Nov 1515 Jan 1615 Jan 16
Northern and Southern waste water pump stations at each end of the tunnel.
Precast Structural concrete11 Nov 1515 Jan 1615 Jan 16
Supply of precast planks for the 650m long tunnel roof
Soil Nails 11 Nov 1515 Jan 1615 Jan 16
Localised soil nailing is required for permanent supports at localised embankments within the tunnel corridor.
Telecommunications11 Nov 1515 Jan 1615 Jan 16
Multiple telecoms re-locations as required along the tunnel alignment.
Temporary Fire Hydrant System11 Nov 1515 Jan 1615 Jan 16
Supply and install a temporary fire hydrant system for the tunnel construction works.
Tunnel Mechanical Services11 Nov 1515 Jan 1615 Jan 16
Supply and install all fire wet and dry systems of the tunnel and tunnel services building; supply and installation of the tunnel ventilation system.
Wall Panels11 Nov 1515 Jan 1615 Jan 16
Supply and install internal fire proof wall system within the tunnel - Speed Panel or similar.
STATUS   MISCELLANEOUS    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Other products and services12 May 15n/a12 Nov 16
Register interest in offering products or services to the successful tier-one contractors.