Metro Tunnel Project



Contact Details


  Andrew Bradley
  ICN - VIC
  (04) 4744 6091
CONTACT EMAIL

  Locations: VIC Australia
  Project Value: $10.9 billion
  Project Status: Tender
  Project Owner Victorian Department of Economic Development, Jobs, Transport & Resources | Transport

Project Details


Metro Tunnel Project


ICN VIC is supporting the Melbourne  Metro Rail Authority with Industry Engagement on the Metro Tunnel Project by collecting the details of individual potential competent, capable, qualified and experienced suppliers across all levels of the Australasian supply ...
SHOW MORE

Project Documents


2. Enabling Works

  ▲ CONTRACT
John Holland Sustainable Procurement Strategy Early Works
SHOW LESS

Work Packages


To submit an expressions of interest, select the icon next to the work package scope you are interested in.

OPEN LISTINGS    AWARDED    CLOSED LISTINGS    OTHER
OPEN FOR EOI    INCOMPLETE EOI    EOI COMPLETED
STATUS   1. DELIVERY & CONSTRUCTION    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
A. Communication Systems20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and/or installation of Communication Systems
B. Concreting20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and/or installation of Concrete
B1. New Concrete Mix Designs9 Jan 1730 Jun 1730 Jun 17
Melbourne Metro Rail Authority (MMRA) has made strong commitments to sustainable triple bottom line (social, environmental and economic) outcomes for the Metro Tunnel project construction and operations, including a Sustainability Target to reduce Portland cement content by a minimum 36% measured by mass across all concrete used in the project compared to the GBCA reference mix.
In order to meet the above target and to assist work package proponents throughout the tender phase, MMRA is seeking concrete mix designs from local industry as detailed in the attached report Supplementary Cementitious Materials (SCM): Information for Suppliers. The purpose of this document is to provide concrete suppliers with background information on MMRAs Portland cement reduction target to enable them to prepare appropriately for market demand during the delivery of the Metro Tunnel project. It provides preliminary mix design information prepared by MMRAs technical advisor, Aurecon Jacobs Mott MacDonald Joint Venture (AJM JV), that meets MMRAs sustainability target.
Concrete suppliers are requested to prepare and provide appropriate mix designs and associated information to MMRA. This information will then be provided to the Metro Tunnel work package proponents for their information during the project tender and pricing periods. Suppliers may choose to supply some or all the mix types required by the work package proponents.
Submissions and enquiries are to be directed to Damien Kennedy (MMRA) at (03) 9655 6996 or damien.kennedy@melbournemetro.vic.gov.au


Please Note - it is important that you read the Document attached to this Work Package titled 'MM Supplementary Cementitious Materials - Information Brief for Suppliers' and respond to MMRA directly rather than doing an ROI on ICN Gateway.
C. Electrical Services20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and/or Installation of Electrical Services
D. Fire Protection20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and/or installation of Fire Protection services
E. Flooring20 Sep 1630 Jun 1730 Jun 17
Supply and installation of flooring inc. Carpet, Vinyl, Timber, Stone, Tiling
F. Gantry Cranes20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and/or installation of Gantry Cranes
G. Glazing20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and/or installation of Glazing products and services.
H. Hydraulic Services20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and/or installation of Hydraulic services
I. Lighting20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and/or installation of lighting products and services.
J. Mechanical Services20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and/or installation of Mechanical services
K. Metalwork20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and/or installation of Metalwork
L. Painting20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and/or installation of Paint and Painting Services
M. Plumbing Fixtures and Fittings20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and/or installation of Plumbing Fixtures and Fittings
N. Precast Concrete20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and/or installation of Precast Concrete
O. Precast Tunnel Segment Lining20 Sep 1630 Jun 1730 Jun 17
Supply, Manufacture and/or installation of Precast Tunnel Segment Lining
P. Public Furniture20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and/or installation of Public Furniture
Q. Rail Track20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and/or installation of Rail Track
R. Steel Reinforcing20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and/or installation of Steel Reinforcing
S. Signage20 Sep 1630 Jun 1730 Jun 17
Design, supply, manufacture and/or installation of Signage
T. Steelwork20 Sep 1630 Jun 1730 Jun 17
Manufacture, supply and installation of Steelwork inc. Structural, Architectural, Piling
U. Toilet Partitions20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and/or installation of Toilet Partitions
V. Traffic Management20 Sep 1630 Jun 1730 Jun 17
Supply of Traffic Management Services
W. Tunnel and Tunneling Equipment20 Sep 1630 Jun 1730 Jun 17
Manufacture, Supply and/or installation/operation of Tunneling Equipment
X. Vertical Transport20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and installation of Vertical transport options
Y. Wall and Ceiling Linings20 Sep 1630 Jun 1730 Jun 17
Maunfacture, supply and/or installation of Wall and Ceiling Linings
Z. Waste Management20 Sep 1630 Jun 1730 Jun 17
Manufacture, supply and installation of Waste Management Services
ZA. Water Tanks20 Sep 1630 Jun 1730 Jun 17
Manufacture, supply and/or installation of Water Tanks
ZB. Windows, Doors and Door Hardware20 Sep 1630 Jun 1730 Jun 17
Supply, manufacture and/or installation of Windows, Doors and Door Hardware
ZC. Delivery and Construction - Information Update21 Sep 1530 Jun 17n/a
EoI are welcome from established, capable, competent, competitive and qualified suppliers who can support MMRA & subsequent Delivery Consortia with individual aspects of the future Major Delivery & Construction Works.
STATUS   2. ENABLING WORKS    ▲ CONTRACT OPENS FULL
SCOPE
CLOSES
PARTIAL
SCOPE
CLOSES
DOCS FULL
SCOPE
EOI
PARTIAL
SCOPE
EOI
Project Enabling Works - Information Update21 Sep 1531 Dec 16n/a
EoI are welcome from established, capable, competent, competitive and qualified suppliers who could support MMRA or initial Enabling Works Contractors with individual aspects of the future Project Enabling Works.