Ichthys Turret

Location: NT, Australia (Offshore) Project Value: $500m USD

Contacts

ICN Northern Territory
ICN - NT
P: (08) 8922 9422
E: click here

Project Status

Open

Project Owner

SBM Offshore

Project Details

  Expand ▼

The Turret and Mooring Systems package consists of an internal non-disconnectable turret and mooring system and all associated equipment. as detailed below:

Weathervaning System:

Weathervaning system means axial bogies, radial wheels, lower pads and associated items, composing the physical interface between the geostationary and rotating parts. The system enables the FPSO to weathervane around the mooring centre.

Lower Turret Structure:

The lower turret structure is located within the FPSO hull and consists of the structural elements, the riser guide tubes, the mooring chain connection and installation equipment, the flexible risers and umbilicals installation equipment, access diver support systems, materials handling equipments and ventilation arrangements

The Upper Turret and Manifold Decks:

The upper turret is fixed on the lower turret and is a non-rotating element. It contains the manifold decks and fixed part of the fluid transfer system, riser and mooring systems upper attachment locations, electrical and instrument equipment rooms, chemical distribution skid, pigging facilities and associated piping and control systems.

The Gantry Structure:

The gantry structure is located on the FPSO cargo deck and weathervanes with the FPSO. It supports the turret access routes and the rotational part of the fluid transfer, utility services and power/signals systems. It contains the swivel stack driving system, ancillary packages, davit crane and equipment handling facilities.

The Swivel Stack:

The swivel stack is located within the gantry structure. It transfers all process fluids, services, power signals and communication feeds from the fixed to the rotating parts of the FPSO.

Mooring System:

The mooring system consists of 21 mooring lines anchored to the sea bed.


Overall Turret Dimensions;

Height: Approximately 86.0m

Diameter: Approximately 19.0m

Weight: Approximately 7000t


Definitions:
Tier 1 - A functional unit or complete package i.e able to produce/supply ALL of the requirements.

Tier 2 - A component or part of the package i.e able to produce/supply part or some of the requirements.

 

Note. When a work package status becomes 'awarded', details of the awarded company will become visible by clicking the plus icon next to the work package title.

Associated Opportunities

  Expand ▼


Work Packages

There are currently no open work packages for this project.

  Open Listings   
  Closed Listings   
  Other
  Package title Status Opens Full
scope
closes
Partial
scope
closes
Docs Full
scope
EOI
Partial
scope
EOI
Check ValveAwarded14 Dec 1211 Jan 1310 Dec 13Download Documentation
Distribution BoardAwarded20 Dec 1231 Jan 1310 Dec 13Download Documentation
Electrical Junction BoxesAwarded20 Dec 1231 Jan 1310 Dec 13Download Documentation
Fire & Gas Field EquipmentsAwarded20 Dec 1231 Jan 1310 Dec 13Download Documentation
Hydraulic Power Unit for ValvesAwarded20 Dec 1231 Jan 1310 Dec 13Download Documentation
IER & LERAwarded14 Dec 1211 Jan 1310 Dec 13Download Documentation
Instrument Junction BoxesAwarded20 Dec 1231 Jan 1310 Dec 13Download Documentation
Level Gauge - MagneticAwarded20 Dec 1231 Jan 1310 Dec 13Download Documentation
Open & Closed Drain PumpAwarded20 Dec 1231 Jan 1310 Dec 13Download Documentation
Pipe BoltingAwarded20 Dec 1231 Jan 1310 Dec 13Download Documentation
CCTV SystemClosed20 Dec 1231 Jan 1320 Dec 13Download Documentation
Erosion MonitorClosed20 Dec 1231 Jan 1320 Dec 13Download Documentation
Pig DetectorClosed20 Dec 1231 Jan 1320 Dec 13Download Documentation
Speakers & Warning lightsClosed20 Dec 1231 Jan 1320 Dec 13Download Documentation
Swivel Bypass SystemClosed20 Dec 1231 Jan 1320 Dec 13Download Documentation
TUTU (HV JB & Fibre Optic Patch Panel)Closed20 Dec 1231 Jan 1320 Dec 13Download Documentation
Underwater cameras for chain hook-up monitoringClosed20 Dec 1231 Jan 1320 Dec 13Download Documentation
Ventilation Equipment (Gas Feeing Fan)Closed13 Sep 1330 Sep 1320 Dec 13Download Documentation